Information injection-pump assembly
ZEXEL
106871-9060
1068719060

Rating:
Service parts 106871-9060 INJECTION-PUMP ASSEMBLY:
1.
_
7.
COUPLING PLATE
8.
_
9.
_
11.
Nozzle and Holder
ME6H6045A
12.
Open Pre:MPa(Kqf/cm2)
17.7{180}/21.6{220}
15.
NOZZLE SET
Include in #1:
106871-9060
as INJECTION-PUMP ASSEMBLY
Cross reference number
ZEXEL
106871-9060
1068719060
Zexel num
Bosch num
Firm num
Name
Calibration Data:
Adjustment conditions
Test oil
1404 Test oil ISO4113 or {SAEJ967d}
1404 Test oil ISO4113 or {SAEJ967d}
Test oil temperature
degC
40
40
45
Nozzle and nozzle holder
105780-8140
Bosch type code
EF8511/9A
Nozzle
105780-0000
Bosch type code
DN12SD12T
Nozzle holder
105780-2080
Bosch type code
EF8511/9
Opening pressure
MPa
17.2
Opening pressure
kgf/cm2
175
Injection pipe
Outer diameter - inner diameter - length (mm) mm 8-3-600
Outer diameter - inner diameter - length (mm) mm 8-3-600
Overflow valve opening pressure
kPa
157
123
191
Overflow valve opening pressure
kgf/cm2
1.6
1.25
1.95
Tester oil delivery pressure
kPa
157
157
157
Tester oil delivery pressure
kgf/cm2
1.6
1.6
1.6
Direction of rotation (viewed from drive side)
Right R
Right R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right R
Right R
Injection order
1-2-7-3-
4-5-6-8
Pre-stroke
mm
4.8
4.75
4.85
Beginning of injection position
Governor side NO.1
Governor side NO.1
Difference between angles 1
Cyl.1-2 deg. 45 44.5 45.5
Cyl.1-2 deg. 45 44.5 45.5
Difference between angles 2
Cal 1-7 deg. 90 89.5 90.5
Cal 1-7 deg. 90 89.5 90.5
Difference between angles 3
Cal 1-3 deg. 135 134.5 135.5
Cal 1-3 deg. 135 134.5 135.5
Difference between angles 4
Cal 1-4 deg. 180 179.5 180.5
Cal 1-4 deg. 180 179.5 180.5
Difference between angles 5
Cal 1-5 deg. 225 224.5 225.5
Cal 1-5 deg. 225 224.5 225.5
Difference between angles 6
Cal 1-6 deg. 270 269.5 270.5
Cal 1-6 deg. 270 269.5 270.5
Difference between angles 7
Cal 1-8 deg. 315 314.5 315.5
Cal 1-8 deg. 315 314.5 315.5
Injection quantity adjustment
Adjusting point
-
Rack position
8.8
Pump speed
r/min
700
700
700
Each cylinder's injection qty
mm3/st.
97
94.1
99.9
Basic
*
Fixing the rack
*
Standard for adjustment of the maximum variation between cylinders
*
Injection quantity adjustment_02
Adjusting point
F
Rack position
5.8+-0.5
Pump speed
r/min
450
450
450
Each cylinder's injection qty
mm3/st.
17
15.3
18.7
Fixing the rack
*
Standard for adjustment of the maximum variation between cylinders
*
Injection quantity adjustment_03
Adjusting point
A
Rack position
R1(8.8)
Pump speed
r/min
700
700
700
Average injection quantity
mm3/st.
97
96
98
Basic
*
Fixing the lever
*
Injection quantity adjustment_04
Adjusting point
B
Rack position
R1(8.8)
Pump speed
r/min
1100
1100
1100
Average injection quantity
mm3/st.
105.7
101.5
109.9
Difference in delivery
mm3/st.
8.4
8.4
8.4
Fixing the lever
*
Injection quantity adjustment_05
Adjusting point
C
Rack position
6.1+-0.5
Pump speed
r/min
225
225
225
Each cylinder's injection qty
mm3/st.
20
17
23
Fixing the rack
*
Remarks
(check)
(check)
Injection quantity adjustment_06
Adjusting point
E
Rack position
-
Pump speed
r/min
100
100
100
Average injection quantity
mm3/st.
130
110
150
Fixing the lever
*
Remarks
After startup boost setting
After startup boost setting
Timer adjustment
Pump speed
r/min
950--
Advance angle
deg.
0
0
0
Remarks
Start
Start
Timer adjustment_02
Pump speed
r/min
900
Advance angle
deg.
0.5
Timer adjustment_03
Pump speed
r/min
1000
Advance angle
deg.
1.8
1.1
2.5
Timer adjustment_04
Pump speed
r/min
1100
Advance angle
deg.
3.5
3.5
Timer adjustment_05
Pump speed
r/min
1150
Advance angle
deg.
6.5
6
7
Remarks
Finish
Finish
Test data Ex:
Governor adjustment

N:Pump speed
R:Rack position (mm)
(1)Lever ratio: RT
(2)Target shim dimension: TH
(3)Tolerance for racks not indicated: +-0.05mm.
(4)Excess fuel setting for starting: SXL
(5)Damper spring setting
----------
RT=1 TH=2.3mm SXL=9.4+-0.1mm
----------
----------
RT=1 TH=2.3mm SXL=9.4+-0.1mm
----------
Speed control lever angle

F:Full speed
----------
----------
a=19deg+-5deg
----------
----------
a=19deg+-5deg
0000000901

F:Full load
I:Idle
(1)Stopper bolt setting
----------
----------
a=10deg+-5deg b=23.5deg+-3deg
----------
----------
a=10deg+-5deg b=23.5deg+-3deg
Stop lever angle

N:Engine manufacturer's normal use
S:Stop the pump.
(1)Rack position = aa
(2)Stopper bolt setting
(3)Rack position bb
(4)Free (at delivery)
(5)R = cc
----------
aa=4-0.5mm bb=11.7mm cc=36mm
----------
a=45.5deg+7deg-5deg b=22deg+-5deg c=(10.5deg)
----------
aa=4-0.5mm bb=11.7mm cc=36mm
----------
a=45.5deg+7deg-5deg b=22deg+-5deg c=(10.5deg)
0000001501 MICRO SWITCH
Adjustment of the micro-switch
Adjust the bolt to obtain the following lever position when the micro-switch is ON.
(1)Speed N1
(2)Rack position Ra
----------
N1=325r/min Ra=5.6+-0.1mm
----------
----------
N1=325r/min Ra=5.6+-0.1mm
----------
Timing setting

(1)Pump vertical direction
(2)Coupling's key groove position at No 1 cylinder's beginning of injection
(3)-
(4)-
----------
----------
a=(40deg)
----------
----------
a=(40deg)
Information:
START BY:a. remove valve covers
Do not let the tops of the fuel nozzles turn when the fuel lines are loosened. The nozzles will be damaged if the top of the nozzles turn in the body.
1. Use tooling (A), and remove inner fuel injection lines (1). Install caps and plugs on all fuel injection line openings to keep dirt out of the fuel system. 2. Remove seal (2) from fuel injection line (1) if necessary. 3. Remove screw (3) from clamp (4) that holds fuel injection nozzle (5) in position. Clamp (4) cannot be removed until the fuel injection nozzle is lifted approximately 25.0 mm (1.00 in.). 4. Remove the fuel injection nozzles with tooling (B) as follows:a. Install 6V6983 Adapter (6) and 6V4152 Screw (7) into nozzle assembly (5). b. Install 6V6982 Tube Assembly (8) over the 6V4152 Screw. Use 2S5658 Washer (9) and 1B2406 Nut (10) on the 6V4152 Screw to pull the fuel injection nozzle from the adapter.
A replacement of compression seal washer (11) and of carbon dam seal (12) must be made each time the fuel nozzle is removed. Be sure that the replacement compression seal washer (11) is the same color code and part number as the original compression seal washer. If the wrong thickness washer is used, engine damage could occur. See Specifications For 3406B Diesel Truck Engines for more information.
5. Remove compression seal washer (11) and carbon dam seal (12) from fuel injection nozzle (5).Install Fuel Injection Nozzles (Earlier)
1. Install compression seal washer (1), and use tool (A) to install carbon dam seal (2) on the fuel injection nozzle.2. Make reference to Special Instruction SEHS7292 for the use of tooling (C). 3. Use tool (D) to clean adapter bore (3) for the fuel injection nozzle. Use an open end wrench or a tap driver to turn tool (D). 4. Install fuel injection nozzle (4) and clamp (5) as a unit. Install the bolt in the clamp to hold it in place. 5. Install O-ring seal (6) on the inner fuel injection line.
Do not let the tops of the fuel nozzles turn when the fuel lines are tightened. The nozzles will be damaged if the top of the nozzles turn in the body.
6. Install inner fuel injection line (7). Use tooling (B) to tighten the inner fuel line nuts to a torque of 40 7 N m (30 5 lb.ft.).END BY:a. install valve covers
Do not let the tops of the fuel nozzles turn when the fuel lines are loosened. The nozzles will be damaged if the top of the nozzles turn in the body.
1. Use tooling (A), and remove inner fuel injection lines (1). Install caps and plugs on all fuel injection line openings to keep dirt out of the fuel system. 2. Remove seal (2) from fuel injection line (1) if necessary. 3. Remove screw (3) from clamp (4) that holds fuel injection nozzle (5) in position. Clamp (4) cannot be removed until the fuel injection nozzle is lifted approximately 25.0 mm (1.00 in.). 4. Remove the fuel injection nozzles with tooling (B) as follows:a. Install 6V6983 Adapter (6) and 6V4152 Screw (7) into nozzle assembly (5). b. Install 6V6982 Tube Assembly (8) over the 6V4152 Screw. Use 2S5658 Washer (9) and 1B2406 Nut (10) on the 6V4152 Screw to pull the fuel injection nozzle from the adapter.
A replacement of compression seal washer (11) and of carbon dam seal (12) must be made each time the fuel nozzle is removed. Be sure that the replacement compression seal washer (11) is the same color code and part number as the original compression seal washer. If the wrong thickness washer is used, engine damage could occur. See Specifications For 3406B Diesel Truck Engines for more information.
5. Remove compression seal washer (11) and carbon dam seal (12) from fuel injection nozzle (5).Install Fuel Injection Nozzles (Earlier)
1. Install compression seal washer (1), and use tool (A) to install carbon dam seal (2) on the fuel injection nozzle.2. Make reference to Special Instruction SEHS7292 for the use of tooling (C). 3. Use tool (D) to clean adapter bore (3) for the fuel injection nozzle. Use an open end wrench or a tap driver to turn tool (D). 4. Install fuel injection nozzle (4) and clamp (5) as a unit. Install the bolt in the clamp to hold it in place. 5. Install O-ring seal (6) on the inner fuel injection line.
Do not let the tops of the fuel nozzles turn when the fuel lines are tightened. The nozzles will be damaged if the top of the nozzles turn in the body.
6. Install inner fuel injection line (7). Use tooling (B) to tighten the inner fuel line nuts to a torque of 40 7 N m (30 5 lb.ft.).END BY:a. install valve covers