106871-8560 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1068718560 220006871a


 

Information injection-pump assembly

ZEXEL 106871-8560 1068718560
HINO 220006871A 220006871a
106871-8560 INJECTION-PUMP ASSEMBLY
Rating:
34
Buy INJECTION-PUMP ASSEMBLY 106871-8560 zexel genuine, new aftermarket engine parts with delivery

Service parts 106871-8560 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106087-7910
3. GOVERNOR 105489-2621
4. SUPPLY PUMP 105237-4050
5. AUTOM. ADVANCE MECHANIS 105683-0010
6. COUPLING PLATE 105664-0461
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105101-7183
11. Nozzle and Holder 23600-2252A
12. Open Pre:MPa(Kqf/cm2) 15.7{160}/24.5{250}
13. NOZZLE-HOLDER 105030-3482
14. NOZZLE 105015-8710
15. NOZZLE SET

Include in #1:

106871-8560 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
106871-8560 
106871-8561 
 
220006871A  HINO
INJECTION-PUMP ASSEMBLY
F20C * K




Information:

1. Disconnect the fuel ratio control sensing line (1). Remove the sensing line clamp bolt (2).2. Disconnect the air compressor water return line (6). 3. Remove the cylinder head air inlet line (3).4. Remove the retaining bolts (4) and the fan drive mounting bracket (5).5. Remove the cylinder head retaining bolts. Attach a hoist and remove the cylinder head assembly - weight 164 lbs. (74,4 kg).Install Cylinder Head
1. Thoroughly clean the sealing surfaces of the cylinder head and cylinder block. Position a new head gasket on the engine and install the cylinder head.2. Install the push rods and rocker shaft assembly.3. Coat the threads of the cylinder head retaining bolts with 4S9416 Anti-Seize Compound. Install bolts and washers, and tighten them in the following sequence: 1 - Tighten all numbered bolts in numerical order to 115 lb. ft. (15,9 mkg).2 - Retighten all numbered bolts in numerical order to 175 5 lb. ft. (24,2 0,7 mkg).3 - Finally, retighten all numbered bolts (hand torque only) in numerical order to 175 5 lb. ft. (24,2 0,7 mkg).4 - Tighten all lettered bolts in alphabetical order to 22 lb. ft. (3,0 mkg).5 - Retighten all lettered bolts in alphabetical order to 32 5 lb. ft. (4,4 0,7 mkg).6 - Finally, retighten all lettered bolts (hand torque only) in alphabetical order to 32 5 lb. ft. (4,4 0,7 mkg).4. Adjust the inlet and exhaust valve clearance as covered in INSTALL ROCKER SHAFT ASSEMBLY AND PUSH RODS.5. Connect the air compressor water return line.6. Connect the fuel ratio control sensing line and install the sensing line clamp bolt.7. Install the fan drive mounting bracket and retaining bolts.concluding steps: a) install water temperature regulatorb) install valve coverc) install precombustion chambersd) install exhaust manifold

Have questions with 106871-8560?





Group cross 106871-8560 ZEXEL

Hino 

9 400 618 277 
220006680A 
INJECTION-PUMP ASSEMBLY
F17C
9 400 618 278 
220006690A 
INJECTION-PUMP ASSEMBLY
F17C
9 400 618 279 
220006700A 
INJECTION-PUMP ASSEMBLY
F17C
 
220006710A 
INJECTION-PUMP ASSEMBLY
F17C
9 400 618 280 
220006750A 
INJECTION-PUMP ASSEMBLY
F17E
 
220006790A 
INJECTION-PUMP ASSEMBLY
F20C
 
220006791A 
INJECTION-PUMP ASSEMBLY
F20C
9 400 618 281 
220006791B 
INJECTION-PUMP ASSEMBLY
F20C
9 400 618 281 
S220006791B 
INJECTION-PUMP ASSEMBLY
F20C
106871-8560  

106871-8561 
 
220006871A 
INJECTION-PUMP ASSEMBLY
F20C
9 400 618 282 
220006871B 
INJECTION-PUMP ASSEMBLY
F20C
9 400 618 283 
220006850A 
INJECTION-PUMP ASSEMBLY
EF750
9 400 618 284 
220006840A 
INJECTION-PUMP ASSEMBLY
EF750
 
220006820A 
INJECTION-PUMP ASSEMBLY
F17E
Back to top