106871-7490 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1068717490


 

Information injection-pump assembly

ZEXEL 106871-7490 1068717490
106871-7490 INJECTION-PUMP ASSEMBLY
Rating:
53
Buy INJECTION-PUMP ASSEMBLY 106871-7490 zexel genuine, new aftermarket engine parts with delivery

Service parts 106871-7490 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106087-7010
3. GOVERNOR 105487-2900
4. SUPPLY PUMP 105207-1140
5. AUTOM. ADVANCE MECHANIS 105681-0170
6. COUPLING PLATE 105663-0390
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-7150
11. Nozzle and Holder
12. Open Pre:MPa(Kqf/cm2) 17.7(180)/21.6(220)
13. NOZZLE-HOLDER 105031-4500
14. NOZZLE 105015-6580
15. NOZZLE SET

Include in #1:

106871-7490 as INJECTION-PUMP ASSEMBLY

Cross reference number

ZEXEL 106871-7490 1068717490


Zexel num
Bosch num
Firm num
Name
106871-7490 
 
   
INJECTION-PUMP ASSEMBLY

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   132424-0620
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-2-7-3- 4-5-6-8
Pre-stroke mm   4.8 4.75 4.85
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cyl.1-2
deg.   45 44.5 45.5
Difference between angles 2
Cal 1-7
deg.   90 89.5 90.5
Difference between angles 3
Cal 1-3
deg.   135 134.5 135.5
Difference between angles 4
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 5
Cal 1-5
deg.   225 224.5 225.5
Difference between angles 6
Cal 1-6
deg.   270 269.5 270.5
Difference between angles 7
Cal 1-8
deg.   315 314.5 315.5
Injection quantity adjustment
Adjusting point   -
Rack position   10
Pump speed r/min   700 700 700
Each cylinder's injection qty mm3/st.   129 125.1 132.9
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   C
Rack position   6.1+-0.5
Pump speed r/min   225 225 225
Each cylinder's injection qty mm3/st.   20 17 23
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(10)
Pump speed r/min   700 700 700
Average injection quantity mm3/st.   129 128 130
Basic   *
Fixing the lever   *
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1(10)
Pump speed r/min   1100 1100 1100
Average injection quantity mm3/st.   131.7 126.3 137.1
Difference in delivery mm3/st.   10.8 10.8 10.8
Fixing the lever   *
Injection quantity adjustment_05
Adjusting point   E
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   160 140 180
Fixing the lever   *
Remarks
After startup boost setting
 
Timer adjustment
Pump speed r/min   900
Advance angle deg.   1
Load   3/4
Remarks
Q=121 (mm3/st) / N=700(r/min)
 
Timer adjustment_02
Pump speed r/min   1100
Advance angle deg.   5 4.5 5.5
Load   4/4
Remarks
Q=155 (mm3/st) / N=700 (r/min), end of advance
 

Test data Ex:

Governor adjustment

Test data 106871-7490
N:Pump speed R:Rack position (mm) (1)Excess fuel setting for starting: SXL (2)Damper spring setting: DL
----------
SXL=10.8+-0.1mm DL=4.3-0.2mm
----------

Speed control lever angle

Test data 106871-7490
(1)Set the pump speed at aa (2)Set the pump speed at bb.
----------
aa=1150r/min bb=960r/min
----------
a=21deg+-5deg b=3deg+-5deg

0000000901

Test data 106871-7490
F:Full load I:Idle (1)Stopper bolt setting
----------

----------
a=10deg+-5deg b=28deg+-3deg

Stop lever angle

Test data 106871-7490
N:Pump normal S:Stop the pump. (1)Rack position = aa (2)Stopper bolt setting (3)Rack position bb (4)Free (at shipping)
----------
aa=4-0.5mm bb=11.7mm
----------
a=43deg+7deg-5deg b=21.5deg+-5deg c=(10.5deg)

0000001501 MICRO SWITCH

Adjustment of the micro-switch Adjust the bolt to obtain the following lever position when the micro-switch is ON. (1)Speed N1 (2)Rack position Ra
----------
N1=325+-5r/min Ra=5.6mm
----------

Timing setting

Test data 106871-7490
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(40deg)




Information:

start by: a) remove fuel injection pump housing and governor 1. Install the fuel injection pump housing on tool (A). The fuel filter does not have to be removed to remove the fuel transfer pump.2. Install timing pin (1) to keep the injection pump camshaft from turning during disassembly and assembly. 3. Install bolt (B) in the threads of sleeve (3). Tighten the bolt until the sleeve can be removed.
Do not hit on the bolt or sleeve. This will cause damage to the unit.
4. Remove four bolts (4) that hold the pump body to the housing.5. Remove body (2) from the housing.6. Remove idler gear (6) from the pump body.7. Remove O-ring seal (5) and the two lip-type seals from the body. 8. Remove drive gear (8) from the shaft.9. Remove key (7) from the shaft.Install Fuel Transfer Pump
1. Install the inner seal in the body with tool (A). The lip of the seal must be toward the pump gears.2. Install the outer seal in the body with tool (B). The lip of the seal must be toward the outside.
Always be careful not to scratch or cause damage to the machined surface of the pump body.
3. Install O-ring seal (2) and idler gear (1) on the body. 4. Install the key and drive gear (3) on the shaft. 5. Install body (4) on the housing.6. Install the bolts that hold the body to the housing. 7. Put sleeve (5) in position on the camshaft. Timing pin (6) must be in position as shown to keep the camshaft from turning during assembly.8. Install the sleeve on the camshaft with tool (C).
Do not hit the sleeve with a hammer to install it. This will put end force on the camshaft and cause damage to the other components in the pump housing.
9. The end clearance of the camshaft must be .023 .018 in. (0.58 0.46 mm) after sleeve (5) is installed.end by: a) install fuel injection pump housing and governor.

Have questions with 106871-7490?





Group cross 106871-7490 ZEXEL

Mitsubishi 

9 400 619 459 
ME090226 
INJECTION-PUMP ASSEMBLY
8DC9T2
 
ME090227 
INJECTION-PUMP ASSEMBLY
8DC9T7
 
 
INJECTION-PUMP ASSEMBLY
8DC9T7
 
ME090228 
INJECTION-PUMP ASSEMBLY
8DC9T7
F 01G 09U 0AJ 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 618 211 
ME065920 
INJECTION-PUMP ASSEMBLY
8DC82
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 613 136 
ME065925 
INJECTION-PUMP ASSEMBLY
8DC82
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 618 212 
ME065933 
INJECTION-PUMP ASSEMBLY
8DC11
 
ME065912 
INJECTION-PUMP ASSEMBLY
8DC82
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

 
ME090108 
INJECTION-PUMP ASSEMBLY
8DC11
 
 
INJECTION-PUMP ASSEMBLY
8DC9T2
 
ME090341 
INJECTION-PUMP ASSEMBLY
8DC9T2
106871-7490  
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 618 213 
ME090345 
INJECTION-PUMP ASSEMBLY
8DC11
Back to top