106871-7280 ZEXEL 9 400 618 203 BOSCH INJECTION-PUMP ASSEMBLY 9400618203 1068717280 me065866


 

Information injection-pump assembly

BOSCH 9 400 618 203 9400618203
ZEXEL 106871-7280 1068717280
MITSUBISHI ME065866 me065866
106871-7280 INJECTION-PUMP ASSEMBLY
Rating:
19
Buy INJECTION-PUMP ASSEMBLY 106871-7280 zexel genuine, new aftermarket engine parts with delivery

Service parts 106871-7280 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106087-5510
3. GOVERNOR 105487-2840
4. SUPPLY PUMP 105207-1140
5. AUTOM. ADVANCE MECHANIS 105636-1610
6. COUPLING PLATE 105663-0260
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-7430
11. Nozzle and Holder ME066435
12. Open Pre:MPa(Kqf/cm2) 17.7(180)/21.6(220)
13. NOZZLE-HOLDER 105031-4500
14. NOZZLE 105015-7310
15. NOZZLE SET

Include in #1:

106871-7280 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
106871-7280 
9 400 618 203 
ME065866  MITSUBISHI
INJECTION-PUMP ASSEMBLY
8DC9 * K




Information:

start by:a) remove pistons 1. Remove bearings (3) from the connecting rod and connecting rod cap.2. Remove retainer ring (1) with tool (A).3. Remove pin (2) and connecting rod (4) from the piston. 4. Remove the piston rings (5) from the piston with tool (B). Clean the piston ring grooves on the pistons with an acceptable ring groove cleaning tool. See USE OF PISTON PIN BEARING REMOVAL AND INSTALLATION TOOLS, SPECIAL INSTRUCTIONS, Form No. SMHS7295.5. Heat the connecting rod (4) in an oven to a temperature of 350°-500°F (177°-260°C). Never use a direct flame to heat a connecting rod. 6. Put connecting rod (4) in position on the base plate of tooling (C). Put a new rod pin bearing (6) on the adapter part of tooling (C). The old bearing is pushed out by tooling (C) as the new bearing is installed.7. Use tooling (C) to push the new bearing into the connecting rod until the push adapter of tooling (C) makes full contact with the connecting rod surface.8. Use a pin boring machine to make the rod pin bearing the correct size. The bore in the new rod pin bearing must be 2.0012 .0003 in. (50.830 0.008 mm).9. Check the clearance between the ends of the piston rings. See PISTONS AND RINGS in SPECIFICATIONS.10. Install the oil ring spring in the oil ring groove of the piston. The oil ring is to be installed over the spring with the oil ring end gap 180° from the oil ring spring joint. 11. Install the oil ring on the piston with tool (B).12. Install the second (intermediate) piston ring with the side that has the identification "UP-2" toward the top of the piston with tool (B).13. Install the first (top) piston ring with the side that has the identification "UP-1" toward the top of the piston with tool (B). After the installation of all three piston rings, put the piston rings in position so the end gaps are 120° apart. 14. Put the piston in position on connecting rod (4). Put clean engine oil on pin (2) and install the pin. Install retainer rings (1) with tool (A). Make sure the retainer rings are in the grooves of the piston.15. Install bearings (3) in the connecting rod and connecting rod cap.end by:a) install pistons

Have questions with 106871-7280?





Group cross 106871-7280 ZEXEL

Mitsubishi 

 
 
INJECTION-PUMP ASSEMBLY
8DC91T2
9 400 618 195 
ME065881 
INJECTION-PUMP ASSEMBLY
8DC91T2
 
 
INJECTION-PUMP ASSEMBLY
8DC91T2
9 400 618 196 
ME065882 
INJECTION-PUMP ASSEMBLY
8DC91T2
 
 
INJECTION-PUMP ASSEMBLY
8DC91T2
9 400 618 197 
ME065883 
INJECTION-PUMP ASSEMBLY
8DC91T2
 
 
INJECTION-PUMP ASSEMBLY
8DC9TL
9 400 618 198 
ME098524 
INJECTION-PUMP ASSEMBLY
8DC9TL
9 400 618 199 
ME065930 
INJECTION-PUMP ASSEMBLY
8DC9
9 400 618 200 
ME065932 
INJECTION-PUMP ASSEMBLY
8DC9
9 400 618 201 
ME065908 
INJECTION-PUMP ASSEMBLY
8DC82
9 400 618 202 
ME065913 
INJECTION-PUMP ASSEMBLY
8DC91
106871-7280  
9 400 618 203 
ME065866 
INJECTION-PUMP ASSEMBLY
8DC9
9 400 618 204 
ME065914 
INJECTION-PUMP ASSEMBLY
8DC91
Back to top