106871-5100 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1068715100


 

Information injection-pump assembly

ZEXEL 106871-5100 1068715100
106871-5100 INJECTION-PUMP ASSEMBLY
Rating:
46
Buy INJECTION-PUMP ASSEMBLY 106871-5100 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

ZEXEL 106871-5100 1068715100


Zexel num
Bosch num
Firm num
Name
106871-5100 
 
   
INJECTION-PUMP ASSEMBLY

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   132424-0620
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-8-7-5- 4-3-6-2
Pre-stroke mm   3.9 3.85 3.95
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-8
deg.   45 44.5 45.5
Difference between angles 2
Cal 1-7
deg.   90 89.5 90.5
Difference between angles 3
Cal 1-5
deg.   135 134.5 135.5
Difference between angles 4
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 5
Cal 1-3
deg.   225 224.5 225.5
Difference between angles 6
Cal 1-6
deg.   270 269.5 270.5
Difference between angles 7
Cyl.1-2
deg.   315 314.5 315.5
Injection quantity adjustment
Adjusting point   A
Rack position   10.6
Pump speed r/min   650 650 650
Average injection quantity mm3/st.   138.9 137.9 139.9
Max. variation between cylinders %   0 -4 4
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   E
Rack position   6.2+-0.5
Pump speed r/min   235 235 235
Average injection quantity mm3/st.   9.5 7.5 11.5
Max. variation between cylinders %   0 -10 10
Fixing the rack   *
Injection quantity adjustment_03
Adjusting point   G
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   140 140
Fixing the lever   *
Remarks
After startup boost setting
 
Timer adjustment
Pump speed r/min   1000
Remarks
Measure the actual advance angle.
 
Timer adjustment_02
Pump speed r/min   1100
Advance angle deg.   6 5.5 6.5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 106871-5100
N:Pump speed R:Rack position (mm) (1)Tolerance for racks not indicated: +-0.05mm. (2)Excess fuel setting for starting: SXL (3)Set idle at delivery (4)Damper spring setting
----------
SXL=11.1+-0.1mm
----------

Speed control lever angle

Test data 106871-5100
F:Full speed
----------

----------
a=6.5deg+-5deg

0000000901

Test data 106871-5100
F:Full load I:Idle (1)Use the hole at R = aa (2)Stopper bolt setting (3)When setting point H
----------
aa=46mm
----------
a=33deg+-5deg b=28.5deg+-3deg c=(5deg)+-3deg

Stop lever angle

Test data 106871-5100
N:Pump normal S:Stop the pump. (1)Drive side
----------

----------
a=20deg+-5deg b=64deg+-5deg

Timing setting

Test data 106871-5100
(1)Pump vertical direction (2)Position of the coupling's key groove at the beginning of injection of the No. 8 cylinder. (3)- (4)-
----------

----------
a=(90deg)




Information:


Illustration 13 g02915447
Plugged DOC
The DOC utilizes a “pass-through” technology, which is different from the “wall flow” design of a DPF. When a light is shined through the DOC, a visible light should be able to pass through. Utilize a flashlight to check for a plugged DOC face. Aim the flashlight into the DOC inlet, visible light should be seen through the DOC. A plugged DOC can be caused by high oil consumption, not recommended fuel additives, or wrong engine oil types. Refer to the Operation and Maintenance Manual for recommended fluids to use. If light cannot be seen on the outlet of the DOC, then replace the DOC.CRS Bodies
Illustration 14 g06342815
Combustion Group
(1) Head Group - Combustion
(2) Gasket
(3) Tube
(4) Body Assembly - Exhaust CombustionCRS Combustion Body (4) contains the flame necessary for CRS Regeneration. There are two combustion stages that occur within the CRS Body: the primary and secondary combustion. The primary combustion of air and fuel occur within Tube (3) to create the CRS flame immediately following Head Group (1). The secondary combustion of the CRS flame and exhaust gas from the turbocharger occur within Body Assembly (4).The body assembly is the only salvageable part of the combustion group. The body assembly must be cleaned, inspected, and pressure tested prior to reuse.Cleaning
Start by isolating the CRS body from all other CRS exhaust components. Remove the head group, the mounting studs, the tube, and the two gaskets.The gasket area and the bellows joints are the two areas of the CRS body that must be cleaned thoroughly to make a proper seal.Cleaning the remainder of the CRS body is not required. If cleaning the CRS body is desired, then first perform the visual inspection, vacuum inspection, and welding procedures prior to washing the CRS body. This step is to ensure that the CRS body is salvageable, not cracked, and to keep water from getting trapped behind the heat shield.If washing is preferred, then use soap and water as a cleaning solution. Do not submerge the CRS body to prevent water from becoming trapped between the heat shield and the CRS body. A cylinder washing brush, a wire brush with handle, and a greenScotch Brite pads are all acceptable cleaning equipment. Removal of all diesel particulates is not required for inspection.
Do not use any combustible solvents to clean the CRS body.
Visual Inspection
A visual inspection of the CRS body must be completed, special equipment or crack detecting solution is not required. Visually inspect the exterior of the CRS body. Small cracks and/or punctures found on the stainless steel heat shield is normal and should be expected. Inspect the bellows sealing joints and the CRS head mating surface for visual damage.Light surface rust is typically not a problem unless rust is found on a bellows joint or the CRS gasket mating surface. Light rust in these two areas must be removed using a Scotch Brite pad.Serviceability
All bolts, studs, and clamps are not reusable and must be replaced with new components.Any thread damage in the mounting

Have questions with 106871-5100?





Group cross 106871-5100 ZEXEL

106871-5100  
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 618 139 
1671397807 
INJECTION-PUMP ASSEMBLY
RG8
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 618 140 
1671397808 
INJECTION-PUMP ASSEMBLY
RF8
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 618 141 
1671397809 
INJECTION-PUMP ASSEMBLY
RG8
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 611 018 
1671397810 
INJECTION-PUMP ASSEMBLY
RF8
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 618 142 
1671397811 
INJECTION-PUMP ASSEMBLY
RF8TA
F 019 Z10 437 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 618 143 
1671397813 
INJECTION-PUMP ASSEMBLY
RF8
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 618 144 
1671397814 
INJECTION-PUMP ASSEMBLY
RF8TA
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 618 145 
1671397812 
INJECTION-PUMP ASSEMBLY
RG8
9 400 612 508 
1671397815 
INJECTION-PUMP ASSEMBLY
RF8
9 400 618 146 
1671397817 
INJECTION-PUMP ASSEMBLY
RF8
Back to top