106871-2440 ZEXEL 9 400 618 089 BOSCH INJECTION-PUMP ASSEMBLY 9400618089 1068712440 me066504


 

Information injection-pump assembly

BOSCH 9 400 618 089 9400618089
ZEXEL 106871-2440 1068712440
MITSUBISHI ME066504 me066504
106871-2440 INJECTION-PUMP ASSEMBLY
Rating:
11
Buy INJECTION-PUMP ASSEMBLY 106871-2440 zexel genuine, new aftermarket engine parts with delivery

Service parts 106871-2440 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106087-5291
3. GOVERNOR 105487-1320
4. SUPPLY PUMP 105207-1081
5. AUTOM. ADVANCE MECHANIS 105636-0580
6. COUPLING PLATE 105663-0260
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-4762
11. Nozzle and Holder
12. Open Pre:MPa(Kqf/cm2) 21.6{220}
13. NOZZLE-HOLDER 105030-4990
14. NOZZLE 105015-4370
15. NOZZLE SET

Include in #1:

106871-2440 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH 9 400 618 089 9400618089
ZEXEL 106871-2440 1068712440
MITSUBISHI ME066504 me066504


Zexel num
Bosch num
Firm num
Name
106871-2440 
9 400 618 089 
ME066504  MITSUBISHI
INJECTION-PUMP ASSEMBLY
8DC8 K 14CD INJECTION PUMP ASSY PE8P PE

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve opening pressure kPa   157 157 157
Overflow valve opening pressure kgf/cm2   1.6 1.6 1.6
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-2-7-3- 4-5-6-8
Pre-stroke mm   4.8 4.75 4.85
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cyl.1-2
deg.   45 44.5 45.5
Difference between angles 2
Cal 1-7
deg.   90 89.5 90.5
Difference between angles 3
Cal 1-3
deg.   135 134.5 135.5
Difference between angles 4
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 5
Cal 1-5
deg.   225 224.5 225.5
Difference between angles 6
Cal 1-6
deg.   270 269.5 270.5
Difference between angles 7
Cal 1-8
deg.   315 314.5 315.5
Injection quantity adjustment
Adjusting point   -
Rack position   9
Pump speed r/min   700 700 700
Each cylinder's injection qty mm3/st.   85 82.4 87.6
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   C
Rack position   6.8+-0.5
Pump speed r/min   200 200 200
Each cylinder's injection qty mm3/st.   20 17 23
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(9)
Pump speed r/min   700 700 700
Average injection quantity mm3/st.   85 84 86
Fixing the lever   *
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1(9)
Pump speed r/min   1100 1100 1100
Average injection quantity mm3/st.   97 93.1 100.9
Difference in delivery mm3/st.   7.8 7.8 7.8
Fixing the lever   *
Injection quantity adjustment_05
Adjusting point   E
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   130 90 170
Fixing the lever   *
Remarks
After startup boost setting
 
Timer adjustment
Pump speed r/min   600+-50
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   700
Advance angle deg.   0.7 0.2 1.2
Timer adjustment_03
Pump speed r/min   850
Advance angle deg.   2 1.5 2.5
Timer adjustment_04
Pump speed r/min   1000
Advance angle deg.   3.6 3.1 4.1
Timer adjustment_05
Pump speed r/min   1150
Advance angle deg.   5.5 5 6
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 106871-2440
N:Pump speed R:Rack position (mm) (1)Adjust with speed control lever at full position (minimum-maximum speed specification) (2)Adjust with the load control lever in the full position (variable speed specification). (3)Excess fuel setting for starting: SXL (4)When air cylinder is operating. (5)Beginning of damper spring operation: DL
----------
SXL=R1+3+2.8mm DL=6.2-0.2mm
----------

Speed control lever angle

Test data 106871-2440
F:Full speed I:Idle (1)(Pump speed = aa) (2)Pump speed = bb (3)Pump speed cc (4)Possible adjusting range
----------
aa=1150r/min bb=725r/min cc=275r/min
----------
a=14deg b=(21deg)+-5deg c=9deg+-5deg d=14deg+-5deg

0000000901

Test data 106871-2440
F:Full load I:Idle (1)Stopper bolt setting
----------

----------
a=10deg+-5deg b=22deg+-3deg

Stop lever angle

Test data 106871-2440
N:Pump normal S:Stop the pump.
----------

----------
a=10deg+-5deg b=64deg+-5deg

0000001501 MICRO SWITCH

Adjustment of the micro-switch Adjust the bolt to obtain the following lever position when the micro-switch is ON. (1)Speed N1 (2)Rack position Ra
----------
N1=325+-5r/min Ra=6.3mm
----------




Information:


TECHNICAL INFORMATION BULLETIN JAN. 15th, 2003
EXCAVATORS
WHEEL LOADERS
ENGINES 322C: (EMR, MAR);
325C: (CRB, CSJ, JLC, JLD, DTF)
950G II: (AYL, AYB);
962G II: (AYE, BAB)
3126B: (BMA)
Component Code(s) 1408SUBJECT: A NEW INJECTION ACTUATION PRESSURE CONTROL VALVE CONNECTOR INCREASES ENGINE OPERATION
PROBLEM:
The injection actuation pressure (IAP) control valve connector may have been assembled incorrectly on some 3126B engine harnesses. This can lead to intermittent engine operation or can cause the engine to stop.
SOLUTION:
If your machine exhibits symptoms of intermittent engine operation or abruptly stopping, the IAP control valve connector should be disconnected from the machine, examined for solenoid contact problems and re-installed using a correct procedure.
Procedure for installing the IAP control valve connector
This procedure will describe how to properly install the 232-4367 Harness.
Required Parts
Qty Part Number Description
1 232-4367 Harness
Procure the part that is listed in the table.
Illustration 1. Left Side of a 3126B Engine on a D6N.
(1) IAP Control Valve
(2) IAP Control Valve Connector
Note: Illustration 1 is from a D6N that is equipped with a 3126B for photographical purposes. The location of the IAP Control Valve is the same for your machine.
Disconnect the IAP control valve connector (2) from the IAP Control Valve (1). See Illustration 1.
Cut the two wires directly behind the connector.
Using wire strippers, strip the ends of the two wires.
Install the 232-4367 Harness, by crimping the stripped wires inside the splice.
Note: Take care to connect the pink wire to the pink wire on one hand and the purple wire to the purple wire on the other hand.
Heat both heat shrinkable tubes in order to insulate both the splices.
Reconnect the repaired harness to the IAP Control Valve (1).
COPYRIGHT 2003 CATERPILLAR
ALL RIGHTS RESERVED

Have questions with 106871-2440?





Group cross 106871-2440 ZEXEL

Mitsubishi 

 
ME066500 
INJECTION-PUMP ASSEMBLY
8DC9
 
ME066510 
INJECTION-PUMP ASSEMBLY
8DC8
9 400 613 132 
ME066501 
INJECTION-PUMP ASSEMBLY
8DC8
9 400 618 088 
ME066503 
INJECTION-PUMP ASSEMBLY
8DC8
106871-2440  
9 400 618 089 
ME066504 
INJECTION-PUMP ASSEMBLY
8DC8
9 400 618 090 
ME066505 
INJECTION-PUMP ASSEMBLY
8DC8
9 400 618 091 
ME066506 
INJECTION-PUMP ASSEMBLY
8DC9
 
ME066502 
INJECTION-PUMP ASSEMBLY
8DC8
 
ME066507 
INJECTION-PUMP ASSEMBLY
8DC9
 
ME066512 
INJECTION-PUMP ASSEMBLY
8DC9
Back to top