106871-1111 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1068711111 1156030311


 

Information injection-pump assembly

ZEXEL 106871-1111 1068711111
ISUZU 1156030311 1156030311
106871-1111 INJECTION-PUMP ASSEMBLY
Rating:
8
Buy INJECTION-PUMP ASSEMBLY 106871-1111 zexel genuine, new aftermarket engine parts with delivery

Service parts 106871-1111 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106081-9050
3. GOVERNOR 105952-1441
4. SUPPLY PUMP 105237-6310
5. AUTOM. ADVANCE MECHANIS 105693-0450
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105101-7750
11. Nozzle and Holder 1-15300-328-0
12. Open Pre:MPa(Kqf/cm2) 15.7{160}/22.1{225}
13. NOZZLE-HOLDER 105030-3540
14. NOZZLE 105025-0090
15. NOZZLE SET

Include in #1:

106871-1111 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
106871-1111 
106871-1112 
 
1156030311  ISUZU
INJECTION-PUMP ASSEMBLY
8PE1-S * K




Information:

(4) VOP (Valve Opening Pressure) Test A. Open the gauge protector valve [0-34500 kPa (0-5000 psi) gauge].B. Increase the pressure until test oil flows from the nozzle tip.C. Write down the VOP. (5) Pressure Loss Test A. Increase the pressure to 690 kPa (100 psi) less than the VOP.B. Close the pump isolator valve (6).C. Use the gauge protector valve (3), [0-34500 kPa (0-5000 psi) gauge] to adjust pressure to 690 kPa (100 psi) less than the VOP.D. After 30 seconds, write down the pressure loss. (6) Adjustment of Valve Opening Pressure If spray characteristics are satisfactory, adjust the valve unseating pressure: Use 7B2591 Cap Wrench (7) to remove the cap. Remove lift screw locknut (8) and loosen lift adjustment screw (9) approximately three turns, so it does not interfere with the pressure adjustment. Loosen pressure adjustment locknut (10).E. Install the nozzle on the 5P4150 Nozzle Tester. F. Use 7B2601 Wrench (11) and adjust the VOP. G. Remove the valve from the nozzle tester and put it in a vise. Install lift adjustment screw locknut (8).H. Use the 6B1655 Wrench to turn lift adjusting screw (9) down lightly against the stem of the fuel valve spring.I. Clamp the needle lift adjustment fixture to the fuel valve body.J. Use a thickness gauge and adjust screw (12) until there is a clearance of 0.43 (.017") between screw (12) and lift adjustment screw (9).K. Hold screw (12) in position with clamping screw (13).L. Remove the thickness gauge and loosen lift adjustment screw (9) until there is 0.3 (.010") clearance between screw (9) and screw (12), after lift screw locknut (8) is tightened with the 7B2587 Wrench. The correct needle lift setting for all valves is 0.177 (.007").Cleaning Needle, Nozzle And Nozzle End Of Flat Seat Valves (Except 1P1795 Master Valves)
(1) Remove cap (1), bonnet (2) or unseating pressure adjusting screw, spring retainer, spring (3) and spring stem (4). Put the correct needle extracting tool (5) through the valve body and tighten over the end of the needle. If the needle is tight, install a new valve service group, or disassemble and clean the valve according to the procedure that follows. (2) If a fuel valve has a chip of scale, metal or foreign material on the seat, this will prevent the needle, from seating on the spray valve nozzle end, and cause the inner surface of the nozzle end and the needle end to become coated with carbon. Put carbon scraper (6) in the needle extracting tool and insert it into the nozzle bore and against the nozzle end; carefully turn the tool one revolution, with a slight pressure to remove the carbon. The cutting surface of scraper (6) has been lapped as perfectly flat and square with the center line of the tool as possible. Unless it remains so, it cannot effectively remove carbon. Handle this tool with care. Two scrapers are provided, so if one becomes marred, the second can be used while another is being obtained.

Have questions with 106871-1111?





Group cross 106871-1111 ZEXEL

9 400 611 014 
 
INJECTION-PUMP ASSEMBLY
8PE1-RA

Isuzu 

9 400 611 014 
1156029700 
INJECTION-PUMP ASSEMBLY
8PE1-RA
 
1156030310 
INJECTION-PUMP ASSEMBLY
8PE1-S
106871-1111  

106871-1112 
 
1156030311 
INJECTION-PUMP ASSEMBLY
8PE1-S
 
1156030312 
INJECTION-PUMP ASSEMBLY
8PE1-S
9 400 618 071 
1156030313 
INJECTION-PUMP ASSEMBLY
8PE1-S
 
 
INJECTION-PUMP ASSEMBLY

Isuzu 

 
1156029840 
INJECTION-PUMP ASSEMBLY
8PE1
 
1156029841 
INJECTION-PUMP ASSEMBLY
8PE1
 
1156029842 
INJECTION-PUMP ASSEMBLY
8PE1
 
 
INJECTION-PUMP ASSEMBLY

Isuzu 

9 400 612 957 
1156029843 
INJECTION-PUMP ASSEMBLY
8PE1
 
 
INJECTION-PUMP ASSEMBLY

Isuzu 

 
1156030320 
INJECTION-PUMP ASSEMBLY
8PE1-S
 
1156030321 
INJECTION-PUMP ASSEMBLY
8PE1-S
 
1156030322 
INJECTION-PUMP ASSEMBLY
8PE1-S
 
1156030323 
INJECTION-PUMP ASSEMBLY
8PE1-S
 
1156030324 
INJECTION-PUMP ASSEMBLY
8PE1-S
F 01G 09U 09H 
1156031660 
INJECTION-PUMP ASSEMBLY
8PE1-S
F 01G 09U 09J 
1156031661 
INJECTION-PUMP ASSEMBLY
8PE1-S
9 400 618 072 
1156031662 
INJECTION-PUMP ASSEMBLY
8PE1-S
 
1156031790 
INJECTION-PUMP ASSEMBLY
8PE1-S
 
1156031791 
INJECTION-PUMP ASSEMBLY
8PE1-S
9 400 612 915 
1156031792 
INJECTION-PUMP ASSEMBLY
8PE1-S
F 01G 09U 09K 
1156031800 
INJECTION-PUMP ASSEMBLY
8PE1-S
F 01G 09U 09L 
1156031801 
INJECTION-PUMP ASSEMBLY
8PE1-S
9 400 618 073 
1156031802 
INJECTION-PUMP ASSEMBLY
8PE1-S
 
1156031810 
INJECTION-PUMP ASSEMBLY
8PE1-S
F 019 Z10 208 
1156031811 
INJECTION-PUMP ASSEMBLY
8PE1-S
9 400 618 074 
1156031812 
INJECTION-PUMP ASSEMBLY
8PE1-S
F 01G 09U 09M 
1156031890 
INJECTION-PUMP ASSEMBLY
8PE1-S
9 400 611 545 
1156031891 
INJECTION-PUMP ASSEMBLY
8PE1-S
F 01G 09U 09N 
1156031892 
INJECTION-PUMP ASSEMBLY
8PE1-S
9 400 618 075 
1156031893 
INJECTION-PUMP ASSEMBLY
8PE1-S
 
1156031990 
INJECTION-PUMP ASSEMBLY
8PE1
 
1156031991 
INJECTION-PUMP ASSEMBLY
8PE1
9 400 611 723 
1156031992 
INJECTION-PUMP ASSEMBLY
8PE1
9 400 618 076 
1156031993 
INJECTION-PUMP ASSEMBLY
8PE1
Back to top