106871-0924 ZEXEL 9 400 618 062 BOSCH INJECTION-PUMP ASSEMBLY 9400618062 1068710924 1671397770


 

Information injection-pump assembly

BOSCH 9 400 618 062 9400618062
ZEXEL 106871-0924 1068710924
NISSAN-DIESEL 1671397770 1671397770
106871-0924 INJECTION-PUMP ASSEMBLY
Rating:
26
Buy INJECTION-PUMP ASSEMBLY 106871-0924 zexel genuine, new aftermarket engine parts with delivery

Service parts 106871-0924 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106087-7711
3. GOVERNOR 105487-5231
4. SUPPLY PUMP 105237-4180
5. AUTOM. ADVANCE MECHANIS 105681-0680
6. COUPLING PLATE 105662-1150
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105101-7591
11. Nozzle and Holder 16600-97101
12. Open Pre:MPa(Kqf/cm2) 17.7{180}/21.6{220}
13. NOZZLE-HOLDER 105030-4190
14. NOZZLE 105015-9551
15. NOZZLE SET

Include in #1:

106871-0924 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
106871-0924 
9 400 618 062 
1671397770  NISSAN-DIESEL
INJECTION-PUMP ASSEMBLY
RF8 K 14CD INJECTION PUMP ASSY PE8P PE




Information:

Start By:a. remove timing gear coverb. remove fuel injection pump housing and governor 1. Remove four bolts (2), plate (3) and idler gear (1). 2. If the camshaft is not going to be removed, use Tool (A) to remove camshaft gear (4).
Do not turn the crankshaft with the camshaft gear removed. Damage can be caused to the pistons and valves or both.
3. Remove bolts (5) that hold timing gear plate (6) to the cylinder block.4. Remove timing gear plate (6). 5. Use Tool (B) to remove the bearing from the idler gear. The following steps are for the installation of the timing gears and plate.6. Install a new gasket on the timing gear plate.7. Put timing gear plate (6) in position on the cylinder block and install the bolts that hold the timing gear plate to the cylinder block.8. Heat camshaft gear (4) to a maximum temperature of 205° C (400° F) for no longer than three hours and install it on the camshaft.9. Use Tool (B) and install the bearing in the idler gear. Set the gear on the front face (face with the timing marks). Drive the bearing from the rear face toward the front face of the gear. Install the bearing to a depth of 1.5 0.5 mm (.06 .02 in) below the rear face of the idler gear.10. Install the idler gear, plate and bolts. Be sure No. 1 cylinder is at top center on the compression stroke. Install the idler gear so "V" mark (7) on the idler gear is in alignment with the "V" mark on the crankshaft gear. "K" marks (8) on the camshaft gear can be seen at the outer edges of the idler gear.End By:a. install fuel injection pump housing and governorb. install timing gear cover

Have questions with 106871-0924?





Group cross 106871-0924 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
F 019 Z10 878 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

106871-0924  
9 400 618 062 
1671397770 
INJECTION-PUMP ASSEMBLY
RF8
Back to top