106871-0821 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1068710821


 

Information injection-pump assembly

ZEXEL 106871-0821 1068710821
106871-0821 INJECTION-PUMP ASSEMBLY
Rating:
9
Buy INJECTION-PUMP ASSEMBLY 106871-0821 zexel genuine, new aftermarket engine parts with delivery

Service parts 106871-0821 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106087-7750
3. GOVERNOR 105487-4730
4. SUPPLY PUMP 105237-4180
5. AUTOM. ADVANCE MECHANIS 105681-0680
6. COUPLING PLATE 105663-0570
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-7720
11. Nozzle and Holder 1660097071
12. Open Pre:MPa(Kqf/cm2) 17.7(180)/21.6(220)
13. NOZZLE-HOLDER 105030-4190
14. NOZZLE 105015-7890
15. NOZZLE SET

Include in #1:

106871-0821 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
106871-0821 
 
   
INJECTION-PUMP ASSEMBLY




Information:

2. Remove three nuts and washers (1).3. Move Peec unit (2) out of the way. (If so equipped). 4. Remove elbows (5) and pipes (7).5. Remove fuel line brackets (4).6. Remove bolts (6). Remove cover (3). 7. Remove elbows (10). Remove adapters (8) and adapters (9) from the aftercooler core. Remove bolts (11). 8. Move aftercooler core (12) toward the front of the engine and use two people to remove the aftercooler core from the lower aftercooler housing. The weight of the aftercooler core is approximately 29 kg (65 lb). Remove the O-ring seals from the aftercooler core extensions.Install Aftercooler
1. Install O-ring seals (13) on the aftercooler core extensions. Put clean engine oil or glycerin on the seals.2. Use two people to put aftercooler core (12) into position in the lower aftercooler housing. The weight of the aftercooler core is approximately 29 kg (65 lb). 3. Install bolts (11). Put clean engine oil or glycerin on O-ring seal (14) and in bores (15) and (16). 4. Put clean engine oil or glycerin on O-ring seals (17) and adapters (8) and (9). Install adapters (8) and (9) in the aftercooler core. 5. Install elbows (10). 6. Put cover (3) into position on the engine. Install bolts (6).7. Install fuel injection line brackets (4). Tighten bolts (20) to a torque of 4.5 1.1 N m (40 10 lb in).8. Put clean engine oil or glycerin on pipes (7). Install pipes (7) and elbows (5).9. Fill the cooling system with coolant. See Operation & Maintenance Manual for the proper procedure and levels.

Have questions with 106871-0821?





Group cross 106871-0821 ZEXEL

Nissan-Diesel 

 
1371397718 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
9 400 619 667 
 
INJECTION-PUMP ASSEMBLY
F 019 Z10 876 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 618 051 
1671397718 
INJECTION-PUMP ASSEMBLY
RF8
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 618 052 
1671397719 
INJECTION-PUMP ASSEMBLY
RE8
 
 
INJECTION-PUMP ASSEMBLY
106871-0821  
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 618 053 
1671397760 
INJECTION-PUMP ASSEMBLY
RF8
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 618 054 
1671397761 
INJECTION-PUMP ASSEMBLY
RF8
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 618 055 
1671397762 
INJECTION-PUMP ASSEMBLY
RE8
 
 
INJECTION-PUMP ASSEMBLY
RF8
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 618 056 
1671397764 
INJECTION-PUMP ASSEMBLY
RF8
 
 
INJECTION-PUMP ASSEMBLY
RE8
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 618 057 
1671397763 
INJECTION-PUMP ASSEMBLY
RE8
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 618 058 
1671397765 
INJECTION-PUMP ASSEMBLY
RE8
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 612 135 
1671397766 
INJECTION-PUMP ASSEMBLY
RF8
 
 
INJECTION-PUMP ASSEMBLY
RF8
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 618 059 
1671397767 
INJECTION-PUMP ASSEMBLY
RF8
Back to top