106871-0670 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1068710670


 

Information injection-pump assembly

ZEXEL 106871-0670 1068710670
106871-0670 INJECTION-PUMP ASSEMBLY
Rating:
41
Buy INJECTION-PUMP ASSEMBLY 106871-0670 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
106871-0670 
 
   
INJECTION-PUMP ASSEMBLY




Information:

1. Remove bolts (1) and the washers that hold rocker shaft assembly (2) in position.2. Remove rocker shaft assembly (2). Remove the O-ring seal from the rear rocker arm support bracket.3. Put identification marks on push rods (3) as to their location in the engine. Remove the push rods.Install Rocker Shaft Assembly & Push Rods
1. Install push rods (1). Make sure they are in their original location in the engine and in position in the valve lifters.
Loosen the adjusting screws on the rocker arms. This will prevent a bent valve or push rod during installation of the rocker shaft assembly.
2. Install a new O-ring seal in the rear rocker arm support bracket. Put 2P2506 Thread Lubricant on all of the bolts that hold the rocker shaft assembly in position except for the bolt that goes through the rear rocker arm support bracket.3. Put rocker shaft assembly (2) in position on the engine. Make sure the dowels in the support bracket are in alignment with the dowel holes in the cylinder head. Make sure the rocker arms are engaged with the push rods.4. Install the bolts and washers that hold the rocker shaft assembly in position. Tighten them until they are finger tight.
3304 Engine Sequence
3306 Engine Sequence5. Tighten the bolts that hold the rocker shaft as follows:a. Tighten the bolts in number sequence to a torque of 156 N m (115 lb ft).b. Tighten the bolts in number sequence to a torque of 250 17 N m (185 13 lb ft).c. Tighten the bolts again in number sequence to a torque of 250 17 N m (185 13 lb ft).6. See "Valve Clearance Setting" in Testing & Adjusting. Make an adjustment to the valves so the intake valves have 0.38 mm (.015 in) clearance and the exhaust valves have 0.64 mm (.025 in) clearance. Tighten the locknuts for the adjusting screws to a torque of 29 7 N m (21 5 lb ft).End By:a. install valve cover

Have questions with 106871-0670?





Group cross 106871-0670 ZEXEL

Nissan-Diesel 

 
 
INJECTION-PUMP ASSEMBLY
RE8
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 618 035 
1671397676 
INJECTION-PUMP ASSEMBLY
RE8
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 618 036 
1671397677 
INJECTION-PUMP ASSEMBLY
RF8
9 400 619 782 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 618 037 
1671397679 
INJECTION-PUMP ASSEMBLY
RF8
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 618 038 
1671397701 
INJECTION-PUMP ASSEMBLY
RD8T
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 618 039 
1671397702 
INJECTION-PUMP ASSEMBLY
RF8
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 618 040 
1671397703 
INJECTION-PUMP ASSEMBLY
RF8
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
1671397705 
INJECTION-PUMP ASSEMBLY
RE8
106871-0670  
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
1671397704 
INJECTION-PUMP ASSEMBLY
RF8
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 618 041 
1671397706 
INJECTION-PUMP ASSEMBLY
RE8
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
1671397709 
INJECTION-PUMP ASSEMBLY
RF8
Back to top