Information injection-pump assembly
BOSCH
9 400 618 040
9400618040
ZEXEL
106871-0652
1068710652
NISSAN-DIESEL
1671397703
1671397703

Rating:
Service parts 106871-0652 INJECTION-PUMP ASSEMBLY:
1.
_
7.
COUPLING PLATE
8.
_
9.
_
11.
Nozzle and Holder
1660097070
12.
Open Pre:MPa(Kqf/cm2)
17.7(180)/21.6(220)
15.
NOZZLE SET
Include in #1:
106871-0652
as INJECTION-PUMP ASSEMBLY
Cross reference number
BOSCH
9 400 618 040
9400618040
ZEXEL
106871-0652
1068710652
NISSAN-DIESEL
1671397703
1671397703
Zexel num
Bosch num
Firm num
Name
106871-0652
9 400 618 040
1671397703 NISSAN-DIESEL
INJECTION-PUMP ASSEMBLY
RF8 * K
RF8 * K
Calibration Data:
Adjustment conditions
Test oil
1404 Test oil ISO4113 or {SAEJ967d}
1404 Test oil ISO4113 or {SAEJ967d}
Test oil temperature
degC
40
40
45
Nozzle and nozzle holder
105780-8140
Bosch type code
EF8511/9A
Nozzle
105780-0000
Bosch type code
DN12SD12T
Nozzle holder
105780-2080
Bosch type code
EF8511/9
Opening pressure
MPa
17.2
Opening pressure
kgf/cm2
175
Injection pipe
Outer diameter - inner diameter - length (mm) mm 8-3-600
Outer diameter - inner diameter - length (mm) mm 8-3-600
Overflow valve opening pressure
kPa
157
123
191
Overflow valve opening pressure
kgf/cm2
1.6
1.25
1.95
Tester oil delivery pressure
kPa
157
157
157
Tester oil delivery pressure
kgf/cm2
1.6
1.6
1.6
Direction of rotation (viewed from drive side)
Right R
Right R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right R
Right R
Injection order
1-8-7-5-
4-3-6-2
Pre-stroke
mm
3.65
3.6
3.7
Beginning of injection position
Governor side NO.1
Governor side NO.1
Difference between angles 1
Cal 1-8 deg. 45 44.5 45.5
Cal 1-8 deg. 45 44.5 45.5
Difference between angles 2
Cal 1-7 deg. 90 89.5 90.5
Cal 1-7 deg. 90 89.5 90.5
Difference between angles 3
Cal 1-5 deg. 135 134.5 135.5
Cal 1-5 deg. 135 134.5 135.5
Difference between angles 4
Cal 1-4 deg. 180 179.5 180.5
Cal 1-4 deg. 180 179.5 180.5
Difference between angles 5
Cal 1-3 deg. 225 224.5 225.5
Cal 1-3 deg. 225 224.5 225.5
Difference between angles 6
Cal 1-6 deg. 270 269.5 270.5
Cal 1-6 deg. 270 269.5 270.5
Difference between angles 7
Cyl.1-2 deg. 315 314.5 315.5
Cyl.1-2 deg. 315 314.5 315.5
Injection quantity adjustment
Adjusting point
A
Rack position
10.3
Pump speed
r/min
650
650
650
Average injection quantity
mm3/st.
129.4
128.4
130.4
Max. variation between cylinders
%
0
-4
4
Basic
*
Fixing the lever
*
Injection quantity adjustment_02
Adjusting point
B
Rack position
7+-0.5
Pump speed
r/min
225
225
225
Average injection quantity
mm3/st.
11
9
13
Max. variation between cylinders
%
0
-10
10
Fixing the rack
*
Injection quantity adjustment_03
Adjusting point
C
Rack position
12.4+0.2
Pump speed
r/min
40
40
40
Average injection quantity
mm3/st.
128
118
138
Fixing the lever
*
Rack limit
*
Timer adjustment
Pump speed
r/min
950--
Advance angle
deg.
0
0
0
Load
3/4
Remarks
Start
Start
Timer adjustment_02
Pump speed
r/min
900
Advance angle
deg.
0.5
Load
3/4
Timer adjustment_03
Pump speed
r/min
1100
Advance angle
deg.
4
3.5
4.5
Load
4/4
Remarks
Finish
Finish
Test data Ex:
Governor adjustment

N:Pump speed
R:Rack position (mm)
(1)Rack limit using the stop lever: R1
(2)Excess fuel setting for starting: SXL
(3)Damper spring setting: DL
----------
R1=12.4+0.2mm SXL=10.3+0.2mm DL=6.5-0.2mm
----------
----------
R1=12.4+0.2mm SXL=10.3+0.2mm DL=6.5-0.2mm
----------
Speed control lever angle

F:Full speed
----------
----------
a=1deg+-5deg
----------
----------
a=1deg+-5deg
0000000901

F:Full load
I:Idle
(1)Stopper bolt setting
----------
----------
a=24.5deg+-5deg b=26deg+-3deg
----------
----------
a=24.5deg+-5deg b=26deg+-3deg
Stop lever angle

N:Pump normal
S:Stop the pump.
(1)Rack position = aa
(2)Use the hole at R = bb
----------
aa=12.4+0.2mm bb=32mm
----------
a=1.5deg+-5deg b=30deg+-5deg
----------
aa=12.4+0.2mm bb=32mm
----------
a=1.5deg+-5deg b=30deg+-5deg
Timing setting

(1)Pump vertical direction
(2)Position of the coupling's key groove at the beginning of injection of the No. 8 cylinder.
(3)-
(4)-
----------
----------
a=(90deg)
----------
----------
a=(90deg)
Information:
3306 Engine Shown1. Turn the fuel supply line valve to the "OFF" position.2. Remove the clamp that holds fuel drain line (1) to the fuel transfer pump. Remove fuel lines (4) and (5).3. Remove bolts (2) and fuel transfer pump (3) from the fuel injection pump housing. Remove the O-ring seal from the fuel transfer pump if necessary.4. Make sure the O-ring seal is in position on the fuel transfer pump. Put the fuel transfer pump in position on the fuel injection pump housing. Install bolts (2) that hold the fuel transfer pump to the fuel injection pump housing.5. Install the clamp that holds fuel drain line (1) to the fuel transfer pump. Install fuel line (4) between the fuel transfer pump and the fuel filter base. Install fuel line (5) between the fuel transfer pump and the fuel priming pump.6. Turn the fuel supply line valve to the "ON" position.Disassemble Fuel Transfer Pump
Start By:a. remove fuel transfer pump
Cover (1) is under spring force. To prevent possible personal injury, carefully remove bolts (2) and cover (1).
1. Remove bolts (2) and cover (1) from the housing. 2. Remove O-ring seals (3) and (4) from the cover.3. Remove valve assembly (5) from the cover. 4. Remove spring (6) from the housing. 5. Remove piston (12) from sleeve (10). Remove washer (15), valve assembly (14) and seal (13) from piston (12).6. Remove sleeve (10) from housing (7). Remove O-ring seal (11) from the sleeve.7. Remove guide and tappet assembly (9) and seal (8) from housing (7). 8. Remove two screws (16), cover (17) and the seal from housing (7). 9. Remove valve assembly (18) from housing (7).Assemble Fuel Transfer Pump
Be sure all parts of the fuel transfer pump are clean before assembly.
1. Install valve assembly (2) in housing (1) as shown. 2. Put clean diesel fuel on seal (2). Put seal (3) in position on cover (4) as shown. Put cover (4) on housing (1). Install the screws that hold the cover. 3. Put clean diesel fuel on seal (5). Put seal (5) and guide and tappet assembly (6) in position in housing (1).4. Put clean diesel fuel on O-ring seal (8). Put O-ring seal (8) in position on sleeve (7). Install sleeve (7) in housing (1).5. Install piston (9) in sleeve (7).6. Put clean diesel fuel on seal (10). Put seal (10), valve assembly (11) and washer (12) in position in piston (7). 7. Put clean diesel fuel on O-ring seals (13) and (14). Put the O-ring seals and valve assembly (15) in position in cover (16) as shown. 8. Put spring (17) and cover (16) in position on housing (1). Install the bolts that hold the spring and cover.End By:a. install fuel transfer pump
Have questions with 106871-0652?
Group cross 106871-0652 ZEXEL
Nissan-Diesel
Nissan-Diesel
Nissan-Diesel
Nissan-Diesel
Nissan-Diesel
Nissan-Diesel
Nissan-Diesel
106871-0652
9 400 618 040
1671397703
INJECTION-PUMP ASSEMBLY
RF8
RF8