106861-2531 ZEXEL 9 400 617 995 BOSCH INJECTION-PUMP ASSEMBLY 9400617995 1068612531 me091896


 

Information injection-pump assembly

BOSCH 9 400 617 995 9400617995
ZEXEL 106861-2531 1068612531
MITSUBISHI ME091896 me091896
106861-2531 INJECTION-PUMP ASSEMBLY
Rating:
16
Buy INJECTION-PUMP ASSEMBLY 106861-2531 zexel genuine, new aftermarket engine parts with delivery

Service parts 106861-2531 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106086-5670
3. GOVERNOR 105306-1212
4. SUPPLY PUMP 105237-1321
5. AUTOM. ADVANCE MECHANIS 105636-1240
6. COUPLING PLATE 105663-0260
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-5891
11. Nozzle and Holder ME066565
12. Open Pre:MPa(Kqf/cm2) 17.7{180}/21.6{220}
13. NOZZLE-HOLDER 105030-4980
14. NOZZLE 105015-5510
15. NOZZLE SET

Include in #1:

106861-2531 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH 9 400 617 995 9400617995
ZEXEL 106861-2531 1068612531
MITSUBISHI ME091896 me091896


Zexel num
Bosch num
Firm num
Name
106861-2531 
9 400 617 995 
ME091896  MITSUBISHI
INJECTION-PUMP ASSEMBLY
8DC9T6 * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   131424-4620
Overflow valve opening pressure kPa   255 221 289
Overflow valve opening pressure kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-2-7-3- 4-5-6-8
Pre-stroke mm   4.8 4.75 4.85
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cyl.1-2
deg.   45 44.5 45.5
Difference between angles 2
Cal 1-7
deg.   90 89.5 90.5
Difference between angles 3
Cal 1-3
deg.   135 134.5 135.5
Difference between angles 4
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 5
Cal 1-5
deg.   225 224.5 225.5
Difference between angles 6
Cal 1-6
deg.   270 269.5 270.5
Difference between angles 7
Cal 1-8
deg.   315 314.5 315.5
Injection quantity adjustment
Adjusting point   -
Rack position   12.1+-0. 5
Pump speed r/min   700 700 700
Each cylinder's injection qty mm3/st.   152 147.6 156.4
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   C
Rack position   7+-0.5
Pump speed r/min   225 225 225
Each cylinder's injection qty mm3/st.   18.5 16 21
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(12.1)
Pump speed r/min   700 700 700
Average injection quantity mm3/st.   152 151 153
Basic   *
Fixing the lever   *
Boost pressure kPa   61.3 61.3
Boost pressure mmHg   460 460
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1(12.1)
Pump speed r/min   1100 1100 1100
Average injection quantity mm3/st.   154 147.6 160.4
Difference in delivery mm3/st.   12.8 12.8 12.8
Fixing the lever   *
Boost pressure kPa   61.3 61.3
Boost pressure mmHg   460 460
Injection quantity adjustment_05
Adjusting point   D
Rack position   R2(11.2)
Pump speed r/min   500 500 500
Average injection quantity mm3/st.   128 124.3 131.7
Fixing the lever   *
Boost pressure kPa   24 24 24
Boost pressure mmHg   180 180 180
Injection quantity adjustment_06
Adjusting point   E
Rack position   -
Pump speed r/min   200 200 200
Average injection quantity mm3/st.   140 120 160
Fixing the lever   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
Boost compensator adjustment
Pump speed r/min   600 600 600
Rack position   9.9
Boost pressure kPa   2.7 2.7 2.7
Boost pressure mmHg   20 20 20
Boost compensator adjustment_02
Pump speed r/min   600 600 600
Rack position   R2(11.2)
Boost pressure kPa   24 22.7 25.3
Boost pressure mmHg   180 170 190
Boost compensator adjustment_03
Pump speed r/min   600 600 600
Rack position   R1(12.1)
Boost pressure kPa   48 41.3 54.7
Boost pressure mmHg   360 310 410
Timer adjustment
Pump speed r/min   930
Advance angle deg.   0.5
Timer adjustment_02
Pump speed r/min   1100
Advance angle deg.   3 2.5 3.5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 106861-2531
N:Pump speed R:Rack position (mm) (1)Rack limit using the stop lever: R1 (2)Boost compensator cancel stroke: BSL (3)Boost compensator stroke: BCL (4)Damper spring setting: DL
----------
R1=13+0.5mm BSL=2.6mm BCL=(2.2)+-0.1mm DL=5.8-0.2mm
----------

0000000901

Test data 106861-2531
F:Full load I:Idle
----------

----------
a=14deg+-5deg b=(22deg)+-3deg

Stop lever angle

Test data 106861-2531
N:Pump normal S:Stop the pump. (1)Using reverse lever (2)Rack position = aa, stopper bolt setting (3)Rack position bb
----------
aa=4.7-0.5mm bb=13+0.5mm
----------
a=3deg+-6deg b=37deg+-6deg

0000001501 MICRO SWITCH

Adjustment of the micro-switch Adjust the bolt to obtain the following lever position when the micro-switch is ON. (1)Speed N1 (2)Rack position Ra
----------
N1=325+-5r/min Ra=6.7mm
----------

Timing setting

Test data 106861-2531
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(40deg)




Information:

Use fuel consumption, service hours, or calendar time, whichever occurs first, to determine maintenance intervals. Experience has shown that maintenance intervals are most accurately scheduled on the basis of fuel consumed rather than service hours.Daily
Walk-Around Inspection - Inspect engine for leaks and loose connections Engine Crankcase - Check oil level Cooling System - Check coolant level Clutch - Check/Adjust/Lubricate Air Starter & Air Tank (if equipped) - Check/Adjust/Drain water Engine Air Cleaner - Check service indicator SR4 Generator - Inspect/CheckEvery 1,100 L (300 gal) of Fuel or 50 Service Hours*
Dust Collector - Clean Light Duty Air Cleaner (If Equipped) - ReplaceEvery 2,800 L (750 gal) of Fuel 125 Service Hours*
Clutch - Check/Adjust/Lubricate Generator Space Heaters (If Equipped) - CheckEvery 5,600 L (1,500 gal) of Fuel or 250 Service Hours*
Scheduled Oil Sampling (S O S)1 - Obtain Sample Engine Oil and Filter(s)1 - Change Crankcase Breather1 - Clean Engine Valve Lash (Between First 250 and 1000 Service Hours Only)1 - Check/Adjust Cooling System - Test for supplemental coolant additive concentration Fuel System - Clean/Replace filters, Drain water from fuel tank Radiator Fins, Aftercooler, Belts, and Hoses - Inspect/Check Fan Drive Bearing - Lubricate Batteries - Check/Clean Magnetic Pickup (At First Oil Change Only - Inspect/Clean1These maintenance requirements are to be performed between the 250 and the 1000 Service Hour interval for Turbocharged (T) Engines ONLY. Refer to 500 Hour interval for Naturally Aspirated (NA) Engines.Every 11,250 L (3,000 gal) of Fuel or 500 Service Hours (NA Only)*
Scheduled Oil Sampling (S O S) Analysis - Obtain Sample Engine Oil and Filter(s) - Change Crankcase Breather - Clean Engine Valve Lash (Between First 500 and 1000 Service Hours Only) - Check/AdjustEvery 22,500 L (6,000 gal) of Fuel or 1000 Service Hours*
Engine Protection Devices - Inspect SR4 Generator and Control Panel - Inspect Fuel Control Linkage - LubricateEvery 45,000 L (12,000 gal) of Fuel 2000 Service Hours*
Engine Valve Lash, Valve Rotators, Fuel Ratio Control, Set Point, and Low Idle - Check/Adjust Fuel Injection Nozzles - Test/Clean/Replace Turbocharger - Inspect Engine Mounts - Inspect Crankshaft Vibration Damper - Inspect SR4 Generator - Check/Inspect Clean/LubricateEvery 68,220 L (18,000 gal) of Fuel or 3000 Service Hours or Two Years*
Cooling System - Add Extender (Extended Life Coolant Only) Cooling System - Drain/Clean/Replace Coolant - Conventional Coolant/Antifreeze Only Water Pump Seal - Inspect/Replace Hoses - Replace Thermostat - ReplaceEvery 90,000 L (24,000 gal) of Fuel or 4000 Service Hours*
Magnetic Pickup - Inspect/Clean SR4 Generator - Check/Inspect/Clean/LubricateEvery 135,000 L (36,000 gal) of fuel or 6,000 Service Hours or Four Years
Cooling System - Drain/Flush/Replace Coolant (Extended Life Coolant Only)*Perform previous maintenance interval items first.

Have questions with 106861-2531?





Group cross 106861-2531 ZEXEL

Mitsubishi 

9 400 617 992 
ME098624 
INJECTION-PUMP ASSEMBLY
8DC9T
F 019 Z20 226 
ME442967 
INJECTION-PUMP ASSEMBLY
8DC9T
9 400 617 993 
ME098628 
INJECTION-PUMP ASSEMBLY
8DC9T
F 01G 09U 09F 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 617 994 
ME091890 
INJECTION-PUMP ASSEMBLY
8DC9T6
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

106861-2531  
9 400 617 995 
ME091896 
INJECTION-PUMP ASSEMBLY
8DC9T6
9 400 617 996 
ME098650 
INJECTION-PUMP ASSEMBLY
8DC9T
9 400 617 997 
ME098653 
INJECTION-PUMP ASSEMBLY
8DC9TC
9 400 611 010 
ME098730 
INJECTION-PUMP ASSEMBLY
8DC90PT
9 400 617 998 
ME098752 
INJECTION-PUMP ASSEMBLY
8DC9T
9 400 617 999 
ME098762 
INJECTION-PUMP ASSEMBLY
8DC9T
9 400 618 000 
ME098768 
INJECTION-PUMP ASSEMBLY
8DC9TE
Back to top