106861-1327 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1068611327 1156017808


 

Information injection-pump assembly

ZEXEL 106861-1327 1068611327
ISUZU 1156017808 1156017808
106861-1327 INJECTION-PUMP ASSEMBLY
Rating:
12
Buy INJECTION-PUMP ASSEMBLY 106861-1327 zexel genuine, new aftermarket engine parts with delivery

Service parts 106861-1327 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106086-9072
3. GOVERNOR 105488-0492
4. SUPPLY PUMP 105237-1940
5. AUTOM. ADVANCE MECHANIS 105687-0192
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-7192
11. Nozzle and Holder
12. Open Pre:MPa(Kqf/cm2) 15.7(160)/22.1(225)
13. NOZZLE-HOLDER 105031-4831
14. NOZZLE 105015-6650
15. NOZZLE SET

Include in #1:

106861-1327 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
106861-1327 
106861-1328 
 
1156017808  ISUZU
INJECTION-PUMP ASSEMBLY
8PC1 * K 14CD PE8P PE




Information:

Cooling System
At operating temperature, the engine coolant is hot and under pressure.Steam can cause personal injury.Check the coolant level only after the engine has been stopped and the filler cap is cool enough to touch with your bare hand.Remove the filler cap slowly to relieve pressure.Cooling system conditioner contains alkali. Avoid contact with the skin and eyes to prevent personal injury.Use all cleaning solutions with care.
Never add coolant to an overheated engine, allow the engine to cool first.Check the specific gravity of the antifreeze solution frequently in cold weather to ensure adequate protection.If the machine is to be stored in or shipped to, an area with below freezing temperatures, the cooling system must be protected against freezing to the lowest expected ambient temperature.All water is corrosive at engine operating temperature. The cooling system should be protected with conditioner at all times regardless of the concentration of antifreeze. This can be done by using Caterpillar coolant conditioner elements. Use a precharge element when filling the system or changing coolant. Install a new maintenance element every 250 service hours during operation.
Do not use Caterpillar cooling conditioner elements with Dowtherm 209 Full-Fill coolant. Follow the instructions provided with the Dowtherm 209 Full-Fill coolant.Coolant should be drained and replaced every 2000 service hours or 1 year. However, when coolant conditioner maintenance elements are replaced every 250 service hours as recommended, the drain period can be extended to 4000 service hours or 2 years.Premix antifreeze solution to provide protection to the lowest expected ambient temperature. Pure undiluted antifreeze will freeze at -23°C (-10°F).Use clean water that is low in scale forming mineral. Do not use softened water.Filling at over 20 liters (5 U.S. gallons) per minute can cause air pockets in the cooling system.After draining and refilling the cooling system, run the engine with the filler cap off until the coolant level stabilizes. Add coolant as necessary to fill the system.The engine cooling system is protected to -28°C (-20°F), with permanent-type antifreeze, when shipped from the factory.Operate with a thermostat in the cooling system all year-round. The engine will overheat without a thermostat.Clean the Cooling System
The machine must be level with the bowl lowered, the parking brake applied and the engine stopped and cool. 1. Remove the radiator cap slowly to relieve the pressure. 2. Remove the access cover, located in the engine guard. 3. Remove the drain valve plug (1). Open the valve (2) and allow the coolant to drain.4. Close the drain valve.5. Fill the cooling system with a cleaning solution. Use a commercially available cleaner or 1 kg sodium bisulfate per 38 liters (2 lb per 10 gal) water.6. Start and operate the engine for 1/2hour. Stop the engine and drain the cleaning solution.7. Flush the system, with the engine stopped, with water until draining water is clear.8. Close the drain valve. Fill the system with a neutralizer. Use a commercially available neutralizer or 250 grams sodium carbonate crystals per 38 liters (1/2 lb to 10 gal) water.9. Operate the

Have questions with 106861-1327?





Group cross 106861-1327 ZEXEL

Isuzu 

 
 
INJECTION-PUMP ASSEMBLY
8PC1
 
1156017801 
INJECTION-PUMP ASSEMBLY
8PC1
 
1156017803 
INJECTION-PUMP ASSEMBLY
8PC1
 
 
INJECTION-PUMP ASSEMBLY
8PC1
 
1156017805 
INJECTION-PUMP ASSEMBLY
8PC1
 
1156017806 
INJECTION-PUMP ASSEMBLY
8PC1
 
1156017807 
INJECTION-PUMP ASSEMBLY
8PC1
106861-1327  

106861-1328 
 
1156017808 
INJECTION-PUMP ASSEMBLY
8PC1
 
1156017809 
INJECTION-PUMP ASSEMBLY
8PC1
Back to top