106861-0811 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1068610811


 

Information injection-pump assembly

ZEXEL 106861-0811 1068610811
106861-0811 INJECTION-PUMP ASSEMBLY
Rating:
11
Buy INJECTION-PUMP ASSEMBLY 106861-0811 zexel genuine, new aftermarket engine parts with delivery

Service parts 106861-0811 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106086-5411
3. GOVERNOR 105487-0851
4. SUPPLY PUMP 105217-1720
5. AUTOM. ADVANCE MECHANIS 105636-0280
6. COUPLING PLATE 105662-0602
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-4880
11. Nozzle and Holder 1660097015
12. Open Pre:MPa(Kqf/cm2) 19.6(200)
13. NOZZLE-HOLDER 105031-4210
14. NOZZLE 105015-4530
15. NOZZLE SET

Include in #1:

106861-0811 as INJECTION-PUMP ASSEMBLY

Cross reference number

ZEXEL 106861-0811 1068610811


Zexel num
Bosch num
Firm num
Name
106861-0811 
 
   
INJECTION-PUMP ASSEMBLY

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   132424-0620
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-8-7-5- 4-3-6-2
Pre-stroke mm   3.65 3.6 3.7
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-8
deg.   45 44.5 45.5
Difference between angles 2
Cal 1-7
deg.   90 89.5 90.5
Difference between angles 3
Cal 1-5
deg.   135 134.5 135.5
Difference between angles 4
Cal 1-4
deg.   180 179.5 180.5
Difference between angles 5
Cal 1-3
deg.   225 224.5 225.5
Difference between angles 6
Cal 1-6
deg.   270 269.5 270.5
Difference between angles 7
Cyl.1-2
deg.   315 314.5 315.5
Injection quantity adjustment
Adjusting point   A
Rack position   11.6
Pump speed r/min   700 700 700
Average injection quantity mm3/st.   105.1 104.1 106.1
Max. variation between cylinders %   0 -4 4
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   B
Rack position   6.9+-0.5
Pump speed r/min   250 250 250
Average injection quantity mm3/st.   13.1 11.1 15.1
Max. variation between cylinders %   0 -10 10
Fixing the rack   *
Timer adjustment
Pump speed r/min   650--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   600
Advance angle deg.   0.5
Timer adjustment_03
Pump speed r/min   1150
Advance angle deg.   3 2.5 3.5
Timer adjustment_04
Pump speed r/min   -
Advance angle deg.   4 4 4
Remarks
Measure the actual speed, stop
 

Test data Ex:

Governor adjustment

Test data 106861-0811
N:Pump speed R:Rack position (mm) (1)Adjust with speed control lever at full position (minimum-maximum speed specification) (2)Adjust with the load control lever in the full position (variable speed specification). (3)Rack limit using the stop lever: R1 (4)Damper spring setting: DL (5)Main spring setting (6)Set idle sub-spring
----------
R1=11.6mm DL=5.6-0.2mm
----------

Speed control lever angle

Test data 106861-0811
F:Full speed I:Idle
----------

----------
a=10deg+-5deg b=10deg+-5deg

0000000901

Test data 106861-0811
F:Full load I:Idle (1)Stopper bolt setting
----------

----------
a=24.5deg+-5deg b=38.5deg+-3deg

Stop lever angle

Test data 106861-0811
N:Pump normal S:Stop the pump. (1)Rack position = aa (2)Use the hole at R = bb
----------
aa=11.6mm bb=32mm
----------
a=29.5deg+-5deg b=4deg+-5deg

0000001501

Test data 106861-0811
(1)Pump vertical direction (2)Position of the coupling's key groove at the beginning of injection of the No. 8 cylinder. (3)- (4)-
----------

----------
a=(90deg)

Timing setting

Test data 106861-0811
(1)Pump vertical direction (2)Position of the coupling's key groove at the beginning of injection of the No. 8 cylinder. (3)- (4)-
----------

----------
a=(90deg)




Information:

Caterpillar: Confidential Yellow
PSP FOR THE USE OF TWO CLAMPS TO HOLD THE BODY AND FUEL NOZZLE IN POSITION ON 3406, 3408 AND 3412 ENGINES - MAILED WORLDWIDE EXC EPT CANADA, BRAZIL & CACO
  The information supplied in this service letter may not be valid after the termination date of this program.   Do not perform the work outlined in this Service Letter after the termination date without first contacting your Caterpillar product analyst.
PRODUCT SUPPORT PROGRAM FOR THE USE OF TWO CLAMPS TO HOLD THE BODY AND FUEL NOZZLE IN POSITION ON 3406, 3408 AND 3412 ENGINES, 1252, PS4019 U-74 AU-59 E-47 O-45 TT-12 TA-6 TM-6 This Program can be administered either before or after a failure. In either case the warranty allowances will be the same and contingent damage will not be allowed. The decision whether to apply the Program is made by the dealer. When reporting the repair use "PS4019" as Part Number and "7755" as Group Number. Although products in the field are to be administered as described above, dealers should rework parts stock immediately. Termination Date
September 30, 1986.
Problem
Engines equipped with 4W5719 (3406) or 4W5733 (3408, 3412) Adapter Assemblies use one 4W5717 Clamp to hold the body and fuel nozzle in position. See the Illustration. These adapter assemblies are also used in 0R0977 (3406) 0R0980 (3408) and 0R2659 (3412) Remanufactured Head Assemblies. One clamp does not provide enough force to hold the body and fuel nozzle tight. This permits fuel to leak past the internal parts of the nozzle and cause the nozzle case to bulge or split. This program provides for an additional clamp and bolts to be used with these adapter assemblies. (SEE ILLUSTRATION)
Affected Product
1/850907/01/002
Parts Needed
1-4W5717 Clamp and 2-5P6900 Bolts for each adapter assembly.
Action Required
The new parts should be installed on cylinder heads in parts stock immediately. Only cylinder heads received before this Service Letter need to be checked. The new parts should be installed on products in the field only when the valve cover has been removed for some other repair or inspection. Install the new clamp and bolts 180 deg. from the existing clamp and bolts. Tighten the bolts for the new clamp to 31 +/- 7 N X m (23 +/- 5 lb ft). Check to make sure the bolts for the existing clamp are tightened to the same torque. Then check the torque on the bolts for the new clamp. (SEE ILLUSTRATION)
Parts Disposition
Not applicable.

Have questions with 106861-0811?





Group cross 106861-0811 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
1671397570 
INJECTION-PUMP ASSEMBLY
RD8
 
 
INJECTION-PUMP ASSEMBLY
RD8
106861-0811  
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 617 952 
1671397572 
INJECTION-PUMP ASSEMBLY
RD8
F 019 Z10 875 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 617 953 
1670097569 
INJECTION-PUMP ASSEMBLY
RD8
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
1670097572 
INJECTION-PUMP ASSEMBLY
RD8
F 019 Z10 207 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 617 954 
1670097573 
INJECTION-PUMP ASSEMBLY
RD8
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 617 955 
1670097613 
INJECTION-PUMP ASSEMBLY
RD8
 
1671297504 
INJECTION-PUMP ASSEMBLY
RD8
 
1671397672 
INJECTION-PUMP ASSEMBLY
RD8
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
1671297505 
INJECTION-PUMP ASSEMBLY
RD8
Back to top