106851-2040 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1068512040 0429051012


 

Information injection-pump assembly

ZEXEL 106851-2040 1068512040
MITSUBISHI-HEAV 0429051012 0429051012
106851-2040 INJECTION-PUMP ASSEMBLY
Rating:
69
Buy INJECTION-PUMP ASSEMBLY 106851-2040 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

Zexel num
Bosch num
Firm num
Name
106851-2040 
 
0429051012  MITSUBISHI-HEAV
INJECTION-PUMP ASSEMBLY
8DK *




Information:

Flywheel
Installation of Flywheel Housing
Installation of flywheel housing(1) Install the oil seal to the flywheel housing.(2) Coat the contact surfaces of the crankcase and flywheel with ThreeBond 1104.(3) Align the holes in the flywheel housing and gasket with the dowel pins on the crankcase, and install them to the crankcase.Installation of Flywheel
(1) Install the flywheel to the crankshaft by aligning the hole with the dowel pin on the back-end of the crankshaft.(2) Place the washer and tighten the four bolts to the specified torque.
Installation of flywheelMeasurement of Flywheel Runout
Measure the flywheel runout with the flywheel installed to the crankshaft. If the standard value is exceeded, check the bolts for tightening condition and the mounting face for adhesion of foreign particles.
Measurement of face runout and circular runoutCylinder Head and Valve Mechanisms
Installation of Valve Stem Seal
(1) Apply engine oil to the valve stem, and insert it into the valve guide.(2) Place a new stem seal on the valve guide.(3) Using the stem seal installer, install the stem seal to the valve guide, making use of the valve stem as a guide.
Installation of valve stem sealInstallation of Valves and Valve Springs
(1) Place the valve spring and retainer on the valve guide, and install the valve cotter using the valve spring pusher.
Excessive compression of the valve spring can cause the retainer to contact the stem seal and damage the seal.
Installation of valve and valve spring(2) Using a soft-faced hammer, tap the top of the valve stem several times to make sure that the spring and valve cotter are securely installed.
Confirmation of secure valve cotter installationInstallation of Cylinder Head Gasket
(1) Make sure that the top face of the crankcase and piston upper surfaces are clean and free of dust.(2) Place a new gasket of the crankcase, making sure that the dowel pins on the top face of the crankcase enter the holes in the gasket.
Do not use a liquid gasket.
Installation of cylinder head gasketInstallation of Cylinder Head
Place the cylinder head on the head gasket, making sure that the dowel pins on the top face of the crankcase enters the holes in the cylinder head.
Installation of cylinder head assemblyTightening of Cylinder Head Bolts
Tighten the cylinder head bolts, following the tightening sequence shown in the diagram two or three times before reaching the specified torque.
Cylinder head bolt tightening sequenceAssembly of Rocker Arm and Rocker Shaft Assembly
When installing the rocker arms, make sure that the shaft assembly marks face the front of the engine, as shown in the diagram. After the assembly, make sure that the rocker arms move smoothly.
Assembly of rocker shaft assemblyInstallation of Pushrods
(1) Insert the pushrods in the cylinder head through the pushrod holes.(2) Make sure that the ball end of each pushrod rests securely on the curved surface of the tappet.Installation of Rocker Shaft Assemblies
(1) Install the valve caps.(2) When installing the rocker shaft brackets, tighten the long bolts first, then tighten the short bolts (reversal of removal sequence).
Installation of rocker shaft assemblyAdjustment of Valve Clearances
(1) Confirming the top dead center on the

Have questions with 106851-2040?





Group cross 106851-2040 ZEXEL

Mitsubishi-Heav 

106851-2040  
 
0429051012 
INJECTION-PUMP ASSEMBLY
8DK
 
0429051112 

8DK
 
0429051122 

8DK
 
0429051211 

8DK
Back to top