Information injection-pump assembly
ZEXEL
106693-1510
1066931510
ISUZU
1156017060
1156017060

Rating:
Service parts 106693-1510 INJECTION-PUMP ASSEMBLY:
1.
_
7.
COUPLING PLATE
8.
_
9.
_
11.
Nozzle and Holder
1-15300-041-1
12.
Open Pre:MPa(Kqf/cm2)
22.1(225)
15.
NOZZLE SET
Include in #1:
106693-1510
as INJECTION-PUMP ASSEMBLY
Cross reference number
ZEXEL
106693-1510
1066931510
ISUZU
1156017060
1156017060
Zexel num
Bosch num
Firm num
Name
106693-1510
1156017060 ISUZU
INJECTION-PUMP ASSEMBLY
6RA1 * K 14CA PE6P,6PD PE
6RA1 * K 14CA PE6P,6PD PE
Calibration Data:
Adjustment conditions
Test oil
1404 Test oil ISO4113 or {SAEJ967d}
1404 Test oil ISO4113 or {SAEJ967d}
Test oil temperature
degC
40
40
45
Nozzle and nozzle holder
105780-8140
Bosch type code
EF8511/9A
Nozzle
105780-0000
Bosch type code
DN12SD12T
Nozzle holder
105780-2080
Bosch type code
EF8511/9
Opening pressure
MPa
17.2
Opening pressure
kgf/cm2
175
Injection pipe
Outer diameter - inner diameter - length (mm) mm 8-3-600
Outer diameter - inner diameter - length (mm) mm 8-3-600
Overflow valve
132424-0620
Overflow valve opening pressure
kPa
157
123
191
Overflow valve opening pressure
kgf/cm2
1.6
1.25
1.95
Tester oil delivery pressure
kPa
157
157
157
Tester oil delivery pressure
kgf/cm2
1.6
1.6
1.6
Direction of rotation (viewed from drive side)
Right R
Right R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right R
Right R
Injection order
1-4-2-6-
3-5
Pre-stroke
mm
3
2.95
3.05
Beginning of injection position
Drive side NO.1
Drive side NO.1
Difference between angles 1
Cal 1-4 deg. 60 59.5 60.5
Cal 1-4 deg. 60 59.5 60.5
Difference between angles 2
Cyl.1-2 deg. 120 119.5 120.5
Cyl.1-2 deg. 120 119.5 120.5
Difference between angles 3
Cal 1-6 deg. 180 179.5 180.5
Cal 1-6 deg. 180 179.5 180.5
Difference between angles 4
Cal 1-3 deg. 240 239.5 240.5
Cal 1-3 deg. 240 239.5 240.5
Difference between angles 5
Cal 1-5 deg. 300 299.5 300.5
Cal 1-5 deg. 300 299.5 300.5
Injection quantity adjustment
Adjusting point
A
Rack position
7.7
Pump speed
r/min
700
700
700
Average injection quantity
mm3/st.
105.7
103.7
107.7
Max. variation between cylinders
%
0
-3
3
Basic
*
Fixing the lever
*
Injection quantity adjustment_02
Adjusting point
B
Rack position
5.5+-0.5
Pump speed
r/min
225
225
225
Average injection quantity
mm3/st.
12.6
9.4
15.8
Max. variation between cylinders
%
0
-13
13
Fixing the rack
*
Injection quantity adjustment_03
Adjusting point
D
Rack position
7.3
Pump speed
r/min
700
700
700
Average injection quantity
mm3/st.
93
89
97
Max. variation between cylinders
%
0
-3
3
Fixing the lever
*
Remarks
At absolute pressure 74kPa {555 mmHg}
At absolute pressure 74kPa {555 mmHg}
Injection quantity adjustment_04
Adjusting point
E
Rack position
7.7
Pump speed
r/min
1150
1150
1150
Average injection quantity
mm3/st.
115.2
109.2
121.2
Max. variation between cylinders
%
0
-3
3
Fixing the lever
*
Timer adjustment
Pump speed
r/min
750
Advance angle
deg.
0
0
0
Remarks
Start
Start
Timer adjustment_02
Pump speed
r/min
700
Advance angle
deg.
0.5
Timer adjustment_03
Pump speed
r/min
800
Advance angle
deg.
0.7
0.2
1.2
Timer adjustment_04
Pump speed
r/min
1000
Advance angle
deg.
2.7
2.2
3.2
Timer adjustment_05
Pump speed
r/min
1150
Advance angle
deg.
4
3.5
4.5
Timer adjustment_06
Pump speed
r/min
-
Advance angle
deg.
4.5
4
5
Remarks
Measure the actual speed, stop
Measure the actual speed, stop
Test data Ex:
Governor adjustment

N:Pump speed
R:Rack position (mm)
(1)Excess fuel setting for starting: SXL
(2)Damper spring setting: DL
(3)Aneroid compensator absolute pressure: at P1
----------
SXL=7.7+0.2mm DL=5-0.5mm P1=74+-0.7kPa(555+-5mmHg)
----------
----------
SXL=7.7+0.2mm DL=5-0.5mm P1=74+-0.7kPa(555+-5mmHg)
----------
0000000901

F:Full load
I:Idle
(1)Stopper bolt setting
(2)Use the hole at R = aa
----------
aa=72mm
----------
a=26.5deg+-5deg b=27deg+-3deg
----------
aa=72mm
----------
a=26.5deg+-5deg b=27deg+-3deg
Stop lever angle

N:Pump normal
S:Stop the pump.
----------
----------
a=32deg+-5deg b=64deg+-5deg
----------
----------
a=32deg+-5deg b=64deg+-5deg
0000001501 ACS

(A) Set screw
1. Aneroid compensator unit adjustment
Screw in (A) to obtain L1.
2. Adjustment following governor installation
(1)Set the speed of the pump to N1 r/min and fix the control lever at the full set position.
(2)Screw in the aneroid compensator to obtain the performance shown in the graph above.
----------
N1=700r/min L1=0.6~0.9mm
----------
R1=7.7mm R2=7.3mm P1=(90.6)kPa((680)mmHg) P2=74+-0.7kPa(555+-5mmhg) Q1=105.7+-2cm3/1000st Q2=(93)+-2cm3/1000st
----------
N1=700r/min L1=0.6~0.9mm
----------
R1=7.7mm R2=7.3mm P1=(90.6)kPa((680)mmHg) P2=74+-0.7kPa(555+-5mmhg) Q1=105.7+-2cm3/1000st Q2=(93)+-2cm3/1000st
Timing setting

(1)Pump vertical direction
(2)Position of timer's threaded hole at No 1 cylinder's beginning of injection
(3)B.T.D.C.: aa
(4)-
----------
aa=19deg
----------
a=(70deg)
----------
aa=19deg
----------
a=(70deg)
Information:
Information Release Memo REM03-10
Reman
May 2003 REMANUFACTURED FUEL INJECTOR FOR VARIOUS 3500 GENSET, MACHINE AND MARINE APPLICATIONS Announcement The Caterpillar Remanufactured Products Group announces the expansion of the remanufactured injector product line to include coverage for various 3500 Genset, Machine and Marine applications. Coverage The addition of this Reman injector provides dealers with an additional repair option to support various 3500 Genset, Machine and Marine applications. Coverage is extensive so please consult your NPR or Reman Cross Reference for exact model coverage. Features And Benefits Cat? Remanufactured injectors offer excellent value to customers. Customers who want fast repair turn-around, superior quality and reliability, and lower repair costs will benefit from the use of these Remanufactured injectors. Cat Remanufactured injectors provide immediate, off-the-shelf availability at a fraction of the new price. Features
All critical engineering changes and updates included
Worldwide availability through Caterpillar? parts distribution system
Backed by Cat warranty Benefits
Improved reliability and performance
Customer access regardless of location
Consistent support Core Acceptance Core Acceptance Criteria for Caterpillar Remanufactured injectors is simple, visual, and requires no special tools. Full core credit is issued when the core is complete, fully assembled, and has an acceptable part number. Consult your Core Acceptance Guide for complete details. Warranty Please consult the appropriate warranty statement for your area. Core Management Please refer to the Caterpillar Core Management Information System (CMIS 2) Parts Information application describing all reman part/CAF and related information. Also refer to other CMIS 2 inquiry applications such as Customer Profiles, Inspection Reason Codes, Inspection Line Inquiry, Add Charge Information, Entitlement Activity, Entitlement Inquiry, CCR Inquiry, CCR Entry, Shipment Processing; Process Packaging Grief; and Reporting to properly manage core returns and monitor inspection performance. This information will be available to all dealers worldwide after your CMIS 2 conversion date. In the meantime, please continue to use the current CMIS Entitlement Parts Inquiry Screen describing the list of parts in a Core Acceptability Family (CAF) and related part number detail. For the latest updates of Reman Policies and Core Management (SELD0122), Core Management Systems & Operations Procedures (SELD0040), and Shipping Instructions (SELD0039), go to the Reman Dealer website https://reman.cat.com If you have any questions regarding core return processing, feel free to call Corinth toll free at (800) 537-2928. For assistance with technical questions, call the Peoria Reman Customer Satisfaction Hot Line also toll free at (888) 88-REMAN or use our E-mail address--Reman_Help.
PELJ0170 CATERPILLAR? ?2003 Caterpillar
Have questions with 106693-1510?
Group cross 106693-1510 ZEXEL
Isuzu
106693-1510
1156017060
INJECTION-PUMP ASSEMBLY
6RA1
6RA1