106693-1093 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1066931093 1156014193


 

Information injection-pump assembly

ZEXEL 106693-1093 1066931093
ISUZU 1156014193 1156014193
106693-1093 INJECTION-PUMP ASSEMBLY
Rating:
18
Buy INJECTION-PUMP ASSEMBLY 106693-1093 zexel genuine, new aftermarket engine parts with delivery

Service parts 106693-1093 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106069-1290
3. GOVERNOR 105487-1711
4. SUPPLY PUMP 105237-1430
5. AUTOM. ADVANCE MECHANIS 105644-0110
6. COUPLING PLATE 105662-0630
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105101-4891
11. Nozzle and Holder
12. Open Pre:MPa(Kqf/cm2) 22.1(225)
13. NOZZLE-HOLDER 105031-4171
14. NOZZLE 105015-3520
15. NOZZLE SET

Include in #1:

106693-1093 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
106693-1093 
 
1156014193  ISUZU
INJECTION-PUMP ASSEMBLY
6RA1 * K




Information:

Daily or every 8 Hours (whichever occurs first)
Check coolant level.Check oil level in sump (make sure machine is standing level).Check oil pressure (where a gauge is fitted).In extreme dust conditions, clean oil bath air cleaner or empty dust bowl on dry type air cleaner.Every 200 Hours or 4 Months (whichever occurs first)
Clean oil bath air cleaner or empty dust bowl on dry type cleaner.Check drive belt tension.Clean fuel water trap (where fitted).Every 400 Hours or 12 Months (whichever occurs first)
Drain and renew engine lubricating oil.Renew lubricating oil filter canister.Renew final fuel filter element.Clean lift pump sediment chamber.Every 800 Hours
Renew dry type air filter element.Every 2,400 Hours
Arrange for examination and service of proprietary equipment, i.e. starter motor, alternator, etc.Service atomisers.Check and adjust valve clearance.Post-Delivery Checkover
After a customer has taken delivery of his Perkins Diesel engine, a general checkover of the engine must be carried out by an experienced fitter after the first 500/1,000 miles (800/1600 km) or 25/50 hours in service with the engine warm.The checkover should comprise the following points:-1. Drain lubricating oil sump and refill to full mark on dipstick with new oil. See list of Approved Lubricating Oils in Appendix. When the sump is drained and it is possible to gain access to the sump strainer, it is recommended that this be cleaned.2. Renew the lubricating oil filter element.3. Remove the rocker assembly; tighten the cylinder head nuts/setscrews in the correct sequence (see Fig. E.12) and to the correct torque (see Page B.2). (Not necessary for 4.2482 The correct procedure for retightening of cylinder head nuts/setscrews is given on Page E.7. Reset valve tip clearances.4. Check coolant level and check for leaks.5. Check external nuts, setscrews, hose clips, mountings etc. for tightness.6. Check fan belt tension.7. Check electrical equipment and connections.8. Check for lubricating oil leaks.9. Check slow running speed (see Page N.9).10. Check general performance of engine. Routine maintenance should follow as detailed under Preventive Maintenance.Protection of an engine not in service
The recommendations given below are to ensure that damage is prevented when an engine is removed from service for an extended period. Use these procedures immediately the engine is removed from service. The instructions for the use of POWERPART products are given on the outside of each container.1. Thoroughly clean the outside of the engine.2. Where a preservative fuel is to be used, drain the fuel system and fill with the preservative fuel. POWERPART Lay-Up 1 can be added to the normal fuel to change it to a preservative fuel. If preservative fuel is not used, the system can be kept charged with normal fuel but this will have to be drained and discarded at the end of the storage period together with the fuel filter.3. Run the engine until it is warm. Correct any fuel, lubricating oil or air leakage. Stop the engine and drain the lubricating oil sump.4. Renew the lubricating oil filter canister.5. Fill the sump to the full mark on the dipstick with clean new lubricating oil or with

Have questions with 106693-1093?





Group cross 106693-1093 ZEXEL

Isuzu 

 
1156013790 
INJECTION-PUMP ASSEMBLY
E120
9 400 610 258 
1156013792 
INJECTION-PUMP ASSEMBLY
E120
 
1156013480 
INJECTION-PUMP ASSEMBLY
6RA1
 
1156013870 
INJECTION-PUMP ASSEMBLY
6RB1
 
1156013880 
INJECTION-PUMP ASSEMBLY
6RB1
 
1156012520 
INJECTION-PUMP ASSEMBLY
6QA1
 
1156012521 
INJECTION-PUMP ASSEMBLY
6QA1
 
1156012522 
INJECTION-PUMP ASSEMBLY
6QA1
 
1156012523 
INJECTION-PUMP ASSEMBLY
6QA1
 
1156012524 
INJECTION-PUMP ASSEMBLY
6QA1
 
1156014210 
INJECTION-PUMP ASSEMBLY
6RB1
 
1156014211 
INJECTION-PUMP ASSEMBLY
6RB1
 
1156014212 
INJECTION-PUMP ASSEMBLY
6RB1
9 400 617 900 
1156014213 
INJECTION-PUMP ASSEMBLY
6RB1
 
1156014220 
INJECTION-PUMP ASSEMBLY
6RB1
 
1156014270 
INJECTION-PUMP ASSEMBLY
6RB1
 
1156014271 
INJECTION-PUMP ASSEMBLY
6RB1
 
1156014272 
INJECTION-PUMP ASSEMBLY
6RB1
9 400 617 901 
1156014273 
INJECTION-PUMP ASSEMBLY
6RB1
9 400 617 902 
1156014320 
INJECTION-PUMP ASSEMBLY
6RB1
 
1156014190 
INJECTION-PUMP ASSEMBLY
6RA1
 
1156014191 
INJECTION-PUMP ASSEMBLY
6RA1
 
1156014192 
INJECTION-PUMP ASSEMBLY
6RA1
106693-1093  
 
1156014193 
INJECTION-PUMP ASSEMBLY
6RA1
Back to top