Information injection-pump assembly
BOSCH
9 400 617 868
9400617868
ZEXEL
106692-4970
1066924970
KOMATSU
6162731163
6162731163

Rating:
Service parts 106692-4970 INJECTION-PUMP ASSEMBLY:
1.
_
5.
AUTOM. ADVANCE MECHANIS
6.
COUPLING PLATE
7.
COUPLING PLATE
8.
_
9.
_
11.
Nozzle and Holder
6162-13-3302
12.
Open Pre:MPa(Kqf/cm2)
25.0{255}
15.
NOZZLE SET
Include in #1:
106692-4970
as INJECTION-PUMP ASSEMBLY
Cross reference number
Zexel num
Bosch num
Firm num
Name
106692-4970
9 400 617 868
6162731163 KOMATSU
INJECTION-PUMP ASSEMBLY
S6D170 K 14CA INJECTION PUMP ASSY PE6P,6PD PE
S6D170 K 14CA INJECTION PUMP ASSY PE6P,6PD PE
Information:
Personal injury or death can result from improper maintenance procedures. To avoid injury or death, follow the procedures exactly as stated below.
Before servicing/performing maintenance on the machine, electrical power must be physically disconnected; battery plugs must be disconnected from the batteries, or the trailing cable must be unplugged, and warning tags and padlocks shall be applied by a certified electrician. Certified electricians shall perform or direct any electrical work, including any energized testing, repair work in controllers, motors, or other approved compartments, and shall insure that all compartments are properly closed and inspected prior to re-energization. All applicable lock out and tag out procedures must be followed.
Do not operate the machine if any guards or covers are missing or inadequately secured. Personnel could be seriously injured or machine damage may occur.
Observe the safe working load limits of all lifting and blocking devices and keep a safe distance from suspended/blocked loads. Personnel may be seriously injured or killed by falling loads.
Required Parts
Table 2
Required Parts
Item Qty Part Number Part Name
1 1 574-7991 Film Field Rework Procedure
Illustration 1 g06471195
DEF injector hose connector contacting the clearance hole
Visually inspect the DEF injector clearance hole for evidence of rub and wear for the DEF injector hose connector.
Illustration 2 g06480781
Clearance hole before grinding
Illustration 3 g06471198
Detail of area A
(D1) 12.1 mm (0.48 inch)
(D2) 75 mm (2.9 inch)
(D3) 50 mm (1.96 inch)
Illustration 4 g06471200
(D4) 50 mm (1.96 inch)
(D5) 12.6 mm (0.49 inch)
(D6) 11.7 mm (0.46 inch)
(D7) 75 mm (2.9 inch)
(D8) Radius is 35 mm (1.4 inch)
If evidence of contact is found, remove the hose connector from the DEF injector. Use die-grinder to increase size of the clearance hole from outside of the machine. Refer to the dimensions that are provided in Illustration 3 and Illustration 4.Note: To prevent unexpected lowering of the lift arms, use a lift arm safety brace to lock the lift arms in raised position. Refer to Operation and Maintenance Manual , SEBU9084 , "Loader Lift Arm Brace Operation".
Illustration 5 g06471201
DEF hose reconnected to outer connector
After the clearance hole is increased, connect the hose connector for DEF to the outer connector on the DEF injector. Verify the clearance between the frame and the DEF hose connector.
Illustration 6 g06471202
Increased clearance hole
Rotate hose connector towards front of machine. Refer to Illustration 6 for proper orientation. The increased hole is large enough to provide clearance for the hose connector.
Illustration 7 g06471206
(1) 574-7991 Film
Paint any bare metal to prevent rust and cover the clearance hole with film (1).
Have questions with 106692-4970?
Group cross 106692-4970 ZEXEL
Komatsu
Komatsu
Komatsu
Komatsu
106692-4970
9 400 617 868
6162731163
INJECTION-PUMP ASSEMBLY
S6D170
S6D170