106692-4265 ZEXEL INJECTION-PUMP ASSEMBLY Cross 1066924265 6151711823


 

Information injection-pump assembly

ZEXEL 106692-4265 1066924265
KOMATSU 6151711823 6151711823
106692-4265 INJECTION-PUMP ASSEMBLY
Rating:
77
Buy INJECTION-PUMP ASSEMBLY 106692-4265 zexel genuine, new aftermarket engine parts with delivery

Service parts 106692-4265 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106069-5801
3. GOVERNOR 105407-2623
4. SUPPLY PUMP 105217-1480
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE 105663-0360
7. COUPLING PLATE 156636-6220
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105111-4060
11. Nozzle and Holder 6151-11-3101
12. Open Pre:MPa(Kqf/cm2) 24.5{250}
13. NOZZLE-HOLDER 105041-7040
14. NOZZLE 105015-5950
15. NOZZLE SET

Include in #1:

106692-4265 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
106692-4265 
106692-4266 
 
6151711823  KOMATSU
INJECTION-PUMP ASSEMBLY
S6D125 * K 14CA PE6P,6PD PE




Information:


Personal injury or death can result from machine articulation or movement. Machine frames can move and a person can be crushed. Connect the steering frame lock between the front and rear frames before working on the machine.Before operating the machine, place the steering frame lock in the stored position.Failure to place the steering frame lock into the stored position before operating can result in loss of steering.
Reference: Disassembly and Assembly, M0084637, "R1700 Load Haul Dump Machine Systems"Reference: Disassembly and Assembly, M0100022, "R2900 Load Haul Dump Machine Systems"Required Parts
Table 1
Required Parts
Qty Part Number Description
1 389-9442 Insulation
1 434-1304 Insulation
1 434-1305 Insulation
7 290-1993 Cable Strap Machine Preparation
Note: Cleanliness is an important factor. Before the removal procedure, clean the exterior of the component thoroughly. Cleaning the exterior will help to prevent dirt from entering the internal mechanism.
Move the machine to a hard level surface away from operating machines and away from personnel.
Engage the parking brake. Place wheel blocks in front of the wheels and behind the wheels.
Stop the engine.
Install the steering frame lock. Refer to Disassembly and Assembly, "Steering Frame Lock - Install".
Turn the key start switch and the battery disconnect switch to the OFF position. If there is no battery disconnect switch, remove the negative battery cable at the battery.
Release system pressure. Refer to Operation and Maintenance Manual, "System Pressure - Release".Procedure
Illustration 1 g06525155
Typical example
(1) Cover As
(2) Cover As
Remove cover assembly (1) and cover assembly (2).
Illustration 2 g06525163
Typical example
(3) Hose As
Locate DEF supply hose assembly (3).
Illustration 3 g06526653
DEF supply hose on the R1700 machine
(4) 290-1993 Cable Strap
(5) 389-9442 Insulation
(6) 434-1305 Insulation
(7) 434-1304 Insulation
Illustration 4 g06526655
DEF supply hose on the R2900 machine
(4) 290-1993 Cable Strap
(5) 389-9442 Insulation
(6) 434-1305 Insulation
(7) 434-1304 Insulation
Install Item (5) through Item (7), securing with 290-1993 Cable Straps as required.Note: On the R1700 machine, 434-1305 Insulation (6) is installed over the top of 389-9442 Insulation (5).Note: On the R2900 machine, 434-1305 Insulation (6) slightly overlaps 389-9442 Insulation (5).
Install cover assembly (1) and cover assembly (2). Refer to Illustration 1.

Have questions with 106692-4265?





Group cross 106692-4265 ZEXEL

Komatsu 

 
6151711821 
INJECTION-PUMP ASSEMBLY
S6D125
 
 
INJECTION-PUMP ASSEMBLY

Komatsu 

106692-4265  

106692-4266 
 
6151711823 
INJECTION-PUMP ASSEMBLY
S6D125
 
6151711824 
INJECTION-PUMP ASSEMBLY
S6D125
9 400 617 834 
6151711825 
INJECTION-PUMP ASSEMBLY
S6D125
Back to top