106692-4051 ZEXEL F 019 Z10 709 BOSCH INJECTION-PUMP ASSEMBLY f019z10709 1066924051


 

Information injection-pump assembly

BOSCH F 019 Z10 709 f019z10709
ZEXEL 106692-4051 1066924051
106692-4051 INJECTION-PUMP ASSEMBLY
Rating:
25
Buy INJECTION-PUMP ASSEMBLY 106692-4051 zexel genuine, new aftermarket engine parts with delivery

Service parts 106692-4051 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106069-8030
3. GOVERNOR
4. SUPPLY PUMP 105207-1180
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105111-4053
11. Nozzle and Holder
12. Open Pre:MPa(Kqf/cm2) 25.0(255)
13. NOZZLE-HOLDER 105041-7112
14. NOZZLE 105015-5500
15. NOZZLE SET

Include in #1:

106692-4051 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH F 019 Z10 709 f019z10709
ZEXEL 106692-4051 1066924051


Zexel num
Bosch num
Firm num
Name
106692-4051 
106692-4052 
F 019 Z10 709 
  KOMATSU
INJECTION-PUMP ASSEMBLY
SA6D170 * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8130
Bosch type code   EFEP215A
Nozzle   105780-0050
Bosch type code   DN6TD119NP1T
Nozzle holder   105780-2090
Bosch type code   EFEP215
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Left
  L
Injection timing adjustment
Direction of rotation (viewed from drive side)
Left
  L
Injection order   1-5-3-6- 2-4
Pre-stroke mm   2.4 2.35 2.45
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   14.5
Pump speed r/min   900 900 900
Each cylinder's injection qty mm3/st.   472.5 467.5 477.5
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   B
Rack position   5.4+-0.5
Pump speed r/min   400 400 400
Average injection quantity mm3/st.   39.5 34.5 44.5
Max. variation between cylinders %   0 -10 10
Fixing the rack   *

Test data Ex:

Governor adjustment

Test data 106692-4051
N:Pump speed R:Rack position (mm) (1)Notch fixed: K (2)RACK LIMIT: RAL (3)The torque control spring does not operate. (4)Idle sub spring setting: L1.
----------
K=13 RAL=14.5+0.2mm L1=5.3-0.5mm
----------

Speed control lever angle

Test data 106692-4051
F:Full speed I:Idle (1)Stopper bolt setting
----------

----------
a=6deg+-5deg b=35deg+-5deg

Stop lever angle

Test data 106692-4051
N:Pump normal S:Stop the pump.
----------

----------
a=26.5deg+-5deg b=53deg+-5deg

Timing setting

Test data 106692-4051
(1)Pump vertical direction (2)Position of spline gear's aligning mark at No 1 cylinder's beginning of injection (key position) (3)- (4)-
----------

----------
a=(130deg)




Information:


Illustration 13 g02915447
Plugged DOC
The DOC utilizes a “pass-through” technology, which is different from the “wall flow” design of a DPF. When a light is shined through the DOC, a visible light should be able to pass through. Utilize a flashlight to check for a plugged DOC face. Aim the flashlight into the DOC inlet, visible light should be seen through the DOC. A plugged DOC can be caused by high oil consumption, not recommended fuel additives, or wrong engine oil types. Refer to the Operation and Maintenance Manual for recommended fluids to use. If light cannot be seen on the outlet of the DOC, then replace the DOC.CRS Bodies
Illustration 14 g06342815
Combustion Group
(1) Head Group - Combustion
(2) Gasket
(3) Tube
(4) Body Assembly - Exhaust CombustionCRS Combustion Body (4) contains the flame necessary for CRS Regeneration. There are two combustion stages that occur within the CRS Body: the primary and secondary combustion. The primary combustion of air and fuel occur within Tube (3) to create the CRS flame immediately following Head Group (1). The secondary combustion of the CRS flame and exhaust gas from the turbocharger occur within Body Assembly (4).The body assembly is the only salvageable part of the combustion group. The body assembly must be cleaned, inspected, and pressure tested prior to reuse.Cleaning
Start by isolating the CRS body from all other CRS exhaust components. Remove the head group, the mounting studs, the tube, and the two gaskets.The gasket area and the bellows joints are the two areas of the CRS body that must be cleaned thoroughly to make a proper seal.Cleaning the remainder of the CRS body is not required. If cleaning the CRS body is desired, then first perform the visual inspection, vacuum inspection, and welding procedures prior to washing the CRS body. This step is to ensure that the CRS body is salvageable, not cracked, and to keep water from getting trapped behind the heat shield.If washing is preferred, then use soap and water as a cleaning solution. Do not submerge the CRS body to prevent water from becoming trapped between the heat shield and the CRS body. A cylinder washing brush, a wire brush with handle, and a greenScotch Brite pads are all acceptable cleaning equipment. Removal of all diesel particulates is not required for inspection.
Do not use any combustible solvents to clean the CRS body.
Visual Inspection
A visual inspection of the CRS body must be completed, special equipment or crack detecting solution is not required. Visually inspect the exterior of the CRS body. Small cracks and/or punctures found on the stainless steel heat shield is normal and should be expected. Inspect the bellows sealing joints and the CRS head mating surface for visual damage.Light surface rust is typically not a problem unless rust is found on a bellows joint or the CRS gasket mating surface. Light rust in these two areas must be removed using a Scotch Brite pad.Serviceability
All bolts, studs, and clamps are not reusable and must be replaced with new components.Any thread damage in the mounting

Have questions with 106692-4051?





Group cross 106692-4051 ZEXEL

Kubota 

9 400 617 816 
1432603200 
INJECTION-PUMP ASSEMBLY
45F
9 400 617 817 
1432610200 
INJECTION-PUMP ASSEMBLY
MD150CS
 
4024966100 
INJECTION-PUMP ASSEMBLY
L6D45FHC

Komatsu 

 
 
INJECTION-PUMP ASSEMBLY
S6D170
 
6162731170 
INJECTION-PUMP ASSEMBLY
S6D170
F 019 Z10 646 
 
INJECTION-PUMP ASSEMBLY

Komatsu 

9 400 617 818 
6162731171 
INJECTION-PUMP ASSEMBLY
S6D170
F 019 Z10 708 
 
INJECTION-PUMP ASSEMBLY
S6D170
9 400 617 819 
6162731211 
INJECTION-PUMP ASSEMBLY
S6D170
106692-4051  

106692-4052 
F 019 Z10 709 
 
INJECTION-PUMP ASSEMBLY
SA6D170
9 400 617 820 
6162731250 
INJECTION-PUMP ASSEMBLY
SA6D170
F 019 Z10 710 
 
INJECTION-PUMP ASSEMBLY

Komatsu 

9 400 617 821 
6162731160 
INJECTION-PUMP ASSEMBLY
SA6D170
 
6151711521 
INJECTION-PUMP ASSEMBLY
S6D125
 
6151711522 
INJECTION-PUMP ASSEMBLY
S6D125
 
 
INJECTION-PUMP ASSEMBLY
S6D125
9 400 617 822 
6151711524 
INJECTION-PUMP ASSEMBLY
S6D125
 
6151711511 
INJECTION-PUMP ASSEMBLY
S6D125
 
6151711512 
INJECTION-PUMP ASSEMBLY
S6D125
9 400 617 823 
6151711514 
INJECTION-PUMP ASSEMBLY
S6D125
 
6151711731 
INJECTION-PUMP ASSEMBLY
S6D125
9 400 610 257 
6151711733 
INJECTION-PUMP ASSEMBLY
S6D125
Back to top