106685-4511 ZEXEL 9 400 617 736 BOSCH INJECTION-PUMP ASSEMBLY 9400617736 1066854511 6152751482


 

Information injection-pump assembly

BOSCH 9 400 617 736 9400617736
ZEXEL 106685-4511 1066854511
KOMATSU 6152751482 6152751482
106685-4511 INJECTION-PUMP ASSEMBLY
Rating:
14
Buy INJECTION-PUMP ASSEMBLY 106685-4511 zexel genuine, new aftermarket engine parts with delivery

Service parts 106685-4511 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106068-4220
3. GOVERNOR 105447-2570
4. SUPPLY PUMP 105237-1591
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE 105664-2392
7. COUPLING PLATE 156639-4420
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105111-5150
11. Nozzle and Holder
12. Open Pre:MPa(Kqf/cm2) 26.0{265}
13. NOZZLE-HOLDER 105041-7130
14. NOZZLE 105025-4250
15. NOZZLE SET

Include in #1:

106685-4511 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
106685-4511 
106685-4512 
9 400 617 736 
6152751482  KOMATSU
INJECTION-PUMP ASSEMBLY
6M125AP-3 * K 14CA INJECTION PUMP ASSY PE6P,6PD PE




Information:

Performance Analysis Report (PAR) Chassis Dynamometer Test
Required Equipment For Test:
Optional Equipment:
Refer to the latest PAR instructions, Special Instruction Form No. SEHS8025, for more detailed instructions concerning preparation of the truck, proper use of the dynamometer and use of the Technical Information File microfiche.Use the following procedure for the PAR Chassis Dynamomenter test:1. Check the fuel API if not done in another procedure. Refer to, Special Instruction, Form No. GMGO0977.2. Record data from the Engine Information Plate.3. Install the required measurement instruments on the engine.4. Operate the engine at partial throttle and load to obtain the normal operating temperature, and then operate the engine at full load for two minutes. While operating at full load, check the fuel pressure [approximately 550 kPa (80 psi)]. If the pressure is low, perform Procedure No. 113T (part of Truck Performance Diagnostic Guide, Form No. SEBD0808), before continuing the test.5. Beginning from Top Engine Limit, load the engine to each test rpm, 5 rpm, for at least two minutes for proper stabilization.6. Record engine test information, in sequence if possible, on the record sheets. If repeat runs are required to complete the sheets, be sure temperatures and conditions are as equal as possible.7.

Have questions with 106685-4511?





Group cross 106685-4511 ZEXEL

Komatsu 

9 400 619 878 
6152751470 
INJECTION-PUMP ASSEMBLY
6M125A-3
9 400 617 735 
6152751472 
INJECTION-PUMP ASSEMBLY
6M125A-3
 
6152751473 
INJECTION-PUMP ASSEMBLY
6M125A-3
9 400 613 214 
6152751480 
INJECTION-PUMP ASSEMBLY
6M125A
106685-4511  

106685-4512 
9 400 617 736 
6152751482 
INJECTION-PUMP ASSEMBLY
6M125AP-3
F 01G 09U 0J5 
6152751483 
INJECTION-PUMP ASSEMBLY
6M125AP-3
9 400 617 737 
6215713350 
INJECTION-PUMP ASSEMBLY
SA12V140

Mitsubishi-Heav 

F 019 Z20 223 
34A6500110 
INJECTION-PUMP ASSEMBLY
S6B3
F 01G 09U 1J9 
34A6510110 
INJECTION-PUMP ASSEMBLY
S6B3-1
F 019 Z20 224 
35A6540130 
INJECTION-PUMP ASSEMBLY
S6B3-MPTA
 
35A6500710 
INJECTION-PUMP ASSEMBLY
S6A3-1
F 01G 09U 1JA 
35A6510710 
INJECTION-PUMP ASSEMBLY
S6A3-1
Back to top