Information injection-pump assembly
ZEXEL
106684-4090
1066844090
Rating:
Service parts 106684-4090 INJECTION-PUMP ASSEMBLY:
1.
_
3.
GOVERNOR
5.
AUTOM. ADVANCE MECHANIS
7.
COUPLING PLATE
8.
_
9.
_
11.
Nozzle and Holder
6212-11-3701
12.
Open Pre:MPa(Kqf/cm2)
27.5{280}
15.
NOZZLE SET
Include in #1:
106684-4090
as INJECTION-PUMP ASSEMBLY
Cross reference number
Zexel num
Bosch num
Firm num
Name
106684-4090
INJECTION-PUMP ASSEMBLY
Information:
If you operate the engine until the turbocharger fails, you could cause severe damage to the turbocharger's compressor wheel and/or your engine. For example: severe damage to the turbocharger compressor wheel could cause parts from the compressor wheel to enter the engine cylinder and cause additional damage to the piston, valve and cylinder head.Maintenance Options
Repair Kits - These useful kits can be obtained from your Caterpillar dealer. These kits include all the necessary parts and instructions to repair your turbocharger in either your own maintenance shop or at your servicing dealer's facility. Repair kits simplify parts ordering, help speed repairs and reduce parts costs. Remanufactured - This process uses manufacturing techniques and procedures to restore your turbocharger to "like-new" performance capability. This process always involves an end product which conforms to the manufacturer's original functional specification. New - Replace with a new turbocharger.Before deciding which method is best, you should make sure you have considered all of the options and costs associated with repair. Some considerations are: * The costs associated with using separate parts from inventory versus the cost of a repair kit.* Downtime costs while the product is being rebuilt or repaired.* Total parts and labor costs for repairs versus the actual Remanufactured cost.* Remanufactured components from Caterpillar are covered by a national factory warranty.Caterpillar Recommendation
To minimize downtime, Caterpillar recommends the use of a Remanufactured turbocharger.There are two levels of pricing for Remanufactured turbochargers.* The first level is primarily based on damage to the turbocharger before failure.* The second level is primarily based on damage to the turbocharger after failure.If you choose to operate your engine until the turbocharger fails, your repair cost could be as much as ten times the repair before failure cost due to additional turbocharger and engine damage that could have been prevented.Refer to the Service Manual for your engine to remove and install the turbocharger.Valve Lash
Check/Adjust
Be sure the engine cannot be started while this maintenance is being performed. To prevent possible injury, do not use the starting motor to turn the flywheel. Hot engine components can cause burns. Allow additional time for the engine to cool before measuring valve clearance.The PEEC uses high voltage to the unit injectors. Disconnect injector enable circuit connector to prevent personal injury. Do not come in contact with the injector terminals while the engine is running.
Measure the valve lash with the engine stopped. To obtain an accurate measurement, allow at least 20 minutes for the valves to cool to engine cylinder head and block temperature.
Adjust the valve clearance to within 0.08 mm (.003 in) of the valve clearance setting given in the Valve Clearance Setting chart above. Rotate the engine crankshaft 360° in the normal crankshaft rotation direction before any adjustments are made.Bridge Adjustment
The valve bridge should be checked and/or adjusted each time valve clearance is chcked and/or adjusted. Valve and valve mechanism components do not always wear evenly which can allow the bridge to be out of adjustment.It is not necessary to remove the rocker
Repair Kits - These useful kits can be obtained from your Caterpillar dealer. These kits include all the necessary parts and instructions to repair your turbocharger in either your own maintenance shop or at your servicing dealer's facility. Repair kits simplify parts ordering, help speed repairs and reduce parts costs. Remanufactured - This process uses manufacturing techniques and procedures to restore your turbocharger to "like-new" performance capability. This process always involves an end product which conforms to the manufacturer's original functional specification. New - Replace with a new turbocharger.Before deciding which method is best, you should make sure you have considered all of the options and costs associated with repair. Some considerations are: * The costs associated with using separate parts from inventory versus the cost of a repair kit.* Downtime costs while the product is being rebuilt or repaired.* Total parts and labor costs for repairs versus the actual Remanufactured cost.* Remanufactured components from Caterpillar are covered by a national factory warranty.Caterpillar Recommendation
To minimize downtime, Caterpillar recommends the use of a Remanufactured turbocharger.There are two levels of pricing for Remanufactured turbochargers.* The first level is primarily based on damage to the turbocharger before failure.* The second level is primarily based on damage to the turbocharger after failure.If you choose to operate your engine until the turbocharger fails, your repair cost could be as much as ten times the repair before failure cost due to additional turbocharger and engine damage that could have been prevented.Refer to the Service Manual for your engine to remove and install the turbocharger.Valve Lash
Check/Adjust
Be sure the engine cannot be started while this maintenance is being performed. To prevent possible injury, do not use the starting motor to turn the flywheel. Hot engine components can cause burns. Allow additional time for the engine to cool before measuring valve clearance.The PEEC uses high voltage to the unit injectors. Disconnect injector enable circuit connector to prevent personal injury. Do not come in contact with the injector terminals while the engine is running.
Measure the valve lash with the engine stopped. To obtain an accurate measurement, allow at least 20 minutes for the valves to cool to engine cylinder head and block temperature.
Adjust the valve clearance to within 0.08 mm (.003 in) of the valve clearance setting given in the Valve Clearance Setting chart above. Rotate the engine crankshaft 360° in the normal crankshaft rotation direction before any adjustments are made.Bridge Adjustment
The valve bridge should be checked and/or adjusted each time valve clearance is chcked and/or adjusted. Valve and valve mechanism components do not always wear evenly which can allow the bridge to be out of adjustment.It is not necessary to remove the rocker
Have questions with 106684-4090?
Group cross 106684-4090 ZEXEL
Daihatsu
Komatsu
Komatsu
Komatsu
Komatsu
Komatsu
Mitsubishi-Heav
Mitsubishi-Heav
Shinko-Engin.
Komatsu
106684-4090
INJECTION-PUMP ASSEMBLY