106682-9521 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1066829521


 

Information injection-pump assembly

ZEXEL 106682-9521 1066829521
106682-9521 INJECTION-PUMP ASSEMBLY
Rating:
66
Buy INJECTION-PUMP ASSEMBLY 106682-9521 zexel genuine, new aftermarket engine parts with delivery

Service parts 106682-9521 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106068-3041
3. GOVERNOR 105447-1851
4. SUPPLY PUMP 105237-1541
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE 105664-0540
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105111-4630
11. Nozzle and Holder 6212-11-3800
12. Open Pre:MPa(Kqf/cm2) 24.5{250}
13. NOZZLE-HOLDER 105041-7122
14. NOZZLE 105025-0790
15. NOZZLE SET

Include in #1:

106682-9521 as INJECTION-PUMP ASSEMBLY

Cross reference number

ZEXEL 106682-9521 1066829521


Zexel num
Bosch num
Firm num
Name
106682-9521 
 
   
INJECTION-PUMP ASSEMBLY
SAA12V14

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8130
Bosch type code   EFEP215A
Nozzle   105780-0050
Bosch type code   DN6TD119NP1T
Nozzle holder   105780-2090
Bosch type code   EFEP215
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-4-1000
Overflow valve   131425-1620
Overflow valve opening pressure kPa   255 221 289
Overflow valve opening pressure kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-5-3-6- 2-4
Pre-stroke mm   3 2.95 3.05
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   14.4
Pump speed r/min   750 750 750
Average injection quantity mm3/st.   455 450 460
Max. variation between cylinders %   0 -3 3
Basic   *
Fixing the rack   *
Remarks
Standard point A's rack position same as row R
 
Injection quantity adjustment_02
Adjusting point   C
Rack position   7.2+-0.5
Pump speed r/min   400 400 400
Average injection quantity mm3/st.   20 18.5 21.5
Max. variation between cylinders %   0 -15 15
Fixing the rack   *

Test data Ex:

Governor adjustment

Test data 106682-9521
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Tolerance for racks not indicated: +-0.05mm. (3)RACK LIMIT (4)Set idle sub-spring
----------
K=16
----------

Speed control lever angle

Test data 106682-9521
F:Full speed I:Idle (1)Stopper bolt setting
----------

----------
a=23deg+-5deg b=17deg+-5deg

Stop lever angle

Test data 106682-9521
N:Pump normal S:Stop the pump. (1)Pump speed aa and rack position bb (to be sealed at delivery) (2)No return spring
----------
aa=0r/min bb=1-0.5mm
----------
a=(73deg) b=43.5deg+-5deg

Timing setting

Test data 106682-9521
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=20deg
----------
a=(30deg)




Information:

Voltage Regulator and Generator
Clean and Inspect
Before working inside the generator, make sure that the starter motor can not be activated by any automatic or manual signal.When the engine-generator is operating, voltages up to 600V are present in these areas near or on the regulator:1. The regulator terminal strip2. The excitation transformer terminal strip (self-excited generator only).Do not short these terminals to ground with any part of the body or any conductive material. Loss of life or injury could result from electrical shock or injury from molten metal.An electrical shock can be received from the regulator capacitor (C1) when the engine-generator is not in operation. To avoid possible injury, discharge the stored charge using an 100 ohm resistor across C1 terminals.
Electronic components in the regulator can be damaged during generator operation if contact is made between the part and ground.
If Moisture is allowed to remain in contact with an electrical winding, some of the moisture will eventually be absorbed. This will lower the resistance of the winding insulation. The insulation used on the windings of Caterpillar generators is moisture resistant, but constant exposure to moisture will gradually lower the insulation's resistance.Dirt can make the problem worse because it can hold the moisture in contact with the insulation. Salt (from sea air) can also make the problem much worse. This is because salt tends to absorb moisture from the air. When the salt and moisture combine, they make a good electrical conductor.Clean the voltage regulator and generator of dirt and debris. Use a brush to loosen accumulations of dirt and a vacuum system for removal. Use of compressed air is not recommended, because of moisture present in the form of condensate.Carbon tracking on insulators can be caused by dirt or loose connections. These carbon paths must be cleaned or the insulators replaced. Failure to correct a carbon tracking problem will eventually result in a short in the electrical circuit.Visually check for loose or broken wires and connections. Check the wires and connections on the regulator assembly. Check that all circuit boards are fully plugged in their sockets. Check all wires and connections in the generator. Make any necessary repairs to the wiring as required. Refer to the "Electric Set Generator Service Manual" for testing and adjusting or disassembly and assembly procedures.Space Heaters
The SR4 generator can operate in high humidity conditions without problems. However, problems can occur when the generator is idle and the surrounding air is warmer than the generator. Moisture can form on the windings and result in poor performance and even result in damage to the windings. Whenever the generator is not in use, insure that the space heaters are in operation.An external source of either 115 or 230 (200 v at 50 Hz) volts A.C. is required to operate the space heaters. Space Heater Connection to External Source H1, H2, H3, H4. Terminal Strip Terminals If 115 VAC source is available, connect

Have questions with 106682-9521?





Group cross 106682-9521 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY
106682-9521  
 
 
INJECTION-PUMP ASSEMBLY
SAA12V14
F 019 Z10 249 
 
INJECTION-PUMP ASSEMBLY
F 019 Z10 250 
 
INJECTION-PUMP ASSEMBLY
F 019 Z10 251 
 
INJECTION-PUMP ASSEMBLY

Komatsu 

9 400 617 624 
6215711731 
INJECTION-PUMP ASSEMBLY
SAA12V14
F 019 Z20 178 
6215711732 
INJECTION-PUMP ASSEMBLY
SAA12V14
Back to top