106682-4647 ZEXEL 9 400 613 213 BOSCH INJECTION-PUMP ASSEMBLY 9400613213 1066824647 35a6560330


 

Information injection-pump assembly

BOSCH 9 400 613 213 9400613213
ZEXEL 106682-4647 1066824647
MITSUBISHI-HEAV 35A6560330 35a6560330
106682-4647 INJECTION-PUMP ASSEMBLY
Rating:
22
Buy INJECTION-PUMP ASSEMBLY 106682-4647 zexel genuine, new aftermarket engine parts with delivery

Service parts 106682-4647 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106068-2982
3. GOVERNOR 105447-5842
4. SUPPLY PUMP 105237-1690
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE 105664-0670
7. COUPLING PLATE 156638-2420
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105101-6220
11. Nozzle and Holder 35A6100010
12. Open Pre:MPa(Kqf/cm2) 21.6{220}
13. NOZZLE-HOLDER 105030-4320
14. NOZZLE 105015-8520
15. NOZZLE SET

Include in #1:

106682-4647 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
106682-4647 
9 400 613 213 
35A6560330  MITSUBISHI-HEAV
INJECTION-PUMP ASSEMBLY
S6A3 K 14CA INJECTION PUMP ASSY PE6P,6PD PE




Information:

Lubrication For A Rebuilt Engine
It is very important for a rebuilt engine to have "adequate" (needed) lubrication during the first seconds of operation. A "dry start" (without needed lubrication) on a rebuilt engine or an engine that has been in storage can cause bearing damage.To prevent the possibility of a "dry start" and bearing damage during the first few seconds of running, use the 1P0540 Flow Checking Tool Group and shop air pressure to pressure lubricate (fill the main oil passage with oil under pressure) all rebuilt engines and all engines that have been in storage.Procedure For Pressure Lubrication
1. Clean the tank of the 1P0540 Flow Checking Tool Group thoroughly, and set the pressure regulator to 240 35 kPa (35 5 psi).
Air pressure should not be more than 345 kPa (50 psi) at any time.
2. Put the correct engine oil into the tank. Use a minimum of 30% of the engine oil capacity. For some engines it will be necessary to fill the tank several times to get the correct amount of oil in the engine.3. Connect the tooling to the main oil passage of the engine.4. Add air pressure to the tank, with the regulator set at 240 35 kPa (35 5 psi). Although the tank has a hand pump, it is difficult to get enough air pressure to do the job with the hand pump. Therefore, use of shop air is recommended.5. Let the engine oil flow into the oil passage under pressure.Fill the crankcase with the correct engine oil. The amount of oil used in the pressure lubrication procedure must be subtracted from the recommended refill capacity in the Operation Maintenance Manual. If the engine is not going to be used for a long time, do the above procedure again before the first start.If shop air is not available, for charging the tank, the hand pump may be used to get the minimum required pressure.
DO NOT use the same 1P0540 Flow Checking Tool Group for both "pressure lubrication application" and for checking fuel flow. Incorrect cleaning is probable if the tool is used for both fuel and lubrication oil. Even a minute amount of dirt in the fuel system can cause fuel nozzle failure.

Have questions with 106682-4647?





Group cross 106682-4647 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi-Heav 

 
35A6510330 
INJECTION-PUMP ASSEMBLY
S6A3
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi-Heav 

9 400 610 971 
35A6520330 
INJECTION-PUMP ASSEMBLY
S6A3
9 400 611 841 
35A6530330 
INJECTION-PUMP ASSEMBLY
S6A3
9 400 612 573 
35A6540330 
INJECTION-PUMP ASSEMBLY
S6A3
 
35A6550330 
INJECTION-PUMP ASSEMBLY
S6A3
106682-4647  
9 400 613 213 
35A6560330 
INJECTION-PUMP ASSEMBLY
S6A3
Back to top