106682-4484 ZEXEL 9 400 617 556 BOSCH INJECTION-PUMP ASSEMBLY 9400617556 1066824484 6162732172


 

Information injection-pump assembly

BOSCH 9 400 617 556 9400617556
ZEXEL 106682-4484 1066824484
KOMATSU 6162732172 6162732172
106682-4484 INJECTION-PUMP ASSEMBLY
Rating:
76
Buy INJECTION-PUMP ASSEMBLY 106682-4484 zexel genuine, new aftermarket engine parts with delivery

Service parts 106682-4484 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106068-2340
3. GOVERNOR 105447-0732
4. SUPPLY PUMP 105237-1541
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE 105664-0390
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105111-4052
11. Nozzle and Holder 6162-13-3201
12. Open Pre:MPa(Kqf/cm2) 25.0{255}
13. NOZZLE-HOLDER 105041-7111
14. NOZZLE 105015-5500
15. NOZZLE SET

Include in #1:

106682-4484 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
106682-4484 
106682-4830 
9 400 617 556 
6162732172  KOMATSU
INJECTION-PUMP ASSEMBLY
SA6D170 K




Information:


Before any service work is done on the fuel system, the outer surface of the injection pump housing must be clean.
Illustrations show fuel injection pump housing and governor removed from engine. Service work can be done with it installed on engine.1. Remove air bleed lines (2). 2. Remove bolts (1), flange (3), the flange assembly and the gaskets.3. Remove the bolts and the cover. 4. Remove bolts (5), solenoid (4) and the gasket.5. Remove two bolts (7) and fuel ratio control (6).6. Remove the shutoff housing from the cover. 7. Remove the bolts, lever (10) and shaft (8).8. Remove the bolts, lever (9) and shaft (11).9. Remove seal (12) from the shutoff housing. Install Shutoff Housing
1. Put 5S1454 Sealing Compound on the outside diameter of the seal and install the seal (1) with tooling (A) in the shutoff housing with the lip toward the outside. The outer face of the seal must be 1.0 mm (.039 in.) below the surface of the housing. Remove the extra sealing compound from the housing and the seal after installation. 2. Put shaft (5) in position in housing (4).3. Install lever (6) and the bolts. 4. Install shaft (2), lever (3) and the bolts. Make an alignment of the notch in shaft (2) with lever (3). 5. Put cover (7) in position on shutoff housing assembly (8) and install the bolts.6. Put fuel ratio control (10) in position and install the bolts. 7. Install the gasket, solenoid (9) and bolts on the cover.8. Put the cover in position and install the bolts.9. Install the gasket, flange assembly, gasket, flange (11) and the bolts.10. Connect air bleed lines (12).

Have questions with 106682-4484?





Group cross 106682-4484 ZEXEL

Komatsu 

 
6162732170 
INJECTION-PUMP ASSEMBLY
SA6D170
 
 
INJECTION-PUMP ASSEMBLY

Komatsu 

 
6162732171 
INJECTION-PUMP ASSEMBLY
SA6D170
F 019 Z10 537 
 
INJECTION-PUMP ASSEMBLY

Komatsu 

106682-4484  

106682-4830 
9 400 617 556 
6162732172 
INJECTION-PUMP ASSEMBLY
SA6D170
Back to top