106682-3013 ZEXEL F 019 Z10 200 BOSCH INJECTION-PUMP ASSEMBLY f019z10200 1066823013


 

Information injection-pump assembly

BOSCH F 019 Z10 200 f019z10200
ZEXEL 106682-3013 1066823013
106682-3013 INJECTION-PUMP ASSEMBLY
Rating:
48
Buy INJECTION-PUMP ASSEMBLY 106682-3013 zexel genuine, new aftermarket engine parts with delivery

Service parts 106682-3013 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106068-3560
3. GOVERNOR 105407-6390
4. SUPPLY PUMP 105237-5110
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE 105664-0970
7. COUPLING PLATE 156639-3420
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105101-8091
11. Nozzle and Holder 236002882A
12. Open Pre:MPa(Kqf/cm2) 17.7{180}/21.6{220}
13. NOZZLE-HOLDER 105030-3531
14. NOZZLE
15. NOZZLE SET 105019-0990

Include in #1:

106682-3013 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
106682-3013 
106682-3014 
F 019 Z10 200 
   
INJECTION-PUMP ASSEMBLY
P10C-TI * K




Information:

2. Disconnect air compressor line (2) and fuel ratio control line (3) from the aftercooler housing.3. Remove four bolts (1), nuts and cover that connect the inlet pipe to the aftercooler housing. 4. Put a mark on the turbocharger compressor housing in alignment with a mark on the turbocharger cartridge housing. Loosen the bolts for the turbocharger compressor housing. Turn the housing so air inlet pipe (4) is away from the aftercooler housing.5. Remove bolts (5) that hold the aftercooler housing to the cylinder head.6. Fasten a hoist to the aftercooler housing and remove the aftercooler housing from the engine. Weight is 95 lb. (43 kg).Install Aftercooler Housing
1. Install new O-ring seals on the aftercooler water inlet and outlet pipes. 2. Fasten a hoist to aftercooler housing (1) and put the aftercooler housing in position on the water pipes and cylinder head.3. Put 9S3263 Thread Lock on the threads of the bolts and install the bolts that hold the aftercooler housing to the cylinder head. 4. Turn the turbocharger compressor housing carefully so the mark on the housing is in alignment with the mark on the turbocharger cartridge housing. Tighten bolts (2) for the compressor housing to 105 5 lb.in. (11.9 0.6 N m).
Do not cause damage to the O-ring seal between the turbocharger compressor housing and the cartridge housing.
5. Install the four bolts and nuts that connect the air inlet pipe to the aftercooler housing.6. Connect the air compressor line and fuel ratio control line.7. Fill engine with coolant.end by:a) install fuel filter base

Have questions with 106682-3013?





Group cross 106682-3013 ZEXEL

Hino 

 
220204680A 
INJECTION-PUMP ASSEMBLY
P10C-TI
 
220204681A 
INJECTION-PUMP ASSEMBLY
P10C-TI
 
 
INJECTION-PUMP ASSEMBLY
106682-3013  

106682-3014 
F 019 Z10 200 
 
INJECTION-PUMP ASSEMBLY
P10C-TI

Hino 

9 400 617 518 
220204682A 
INJECTION-PUMP ASSEMBLY
P10C-TI
Back to top