106682-3001 ZEXEL F 019 Z10 428 BOSCH INJECTION-PUMP ASSEMBLY f019z10428 1066823001 220204211a


 

Information injection-pump assembly

BOSCH F 019 Z10 428 f019z10428
ZEXEL 106682-3001 1066823001
HINO 220204211A 220204211a
106682-3001 INJECTION-PUMP ASSEMBLY
Rating:
40
Buy INJECTION-PUMP ASSEMBLY 106682-3001 zexel genuine, new aftermarket engine parts with delivery

Service parts 106682-3001 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106068-2450
3. GOVERNOR 105407-5350
4. SUPPLY PUMP 105237-4530
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE 105664-0970
7. COUPLING PLATE 156638-5720
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105101-6900
11. Nozzle and Holder 236002590A
12. Open Pre:MPa(Kqf/cm2) 21.1(215)
13. NOZZLE-HOLDER 105030-3520
14. NOZZLE 105015-9470
15. NOZZLE SET

Include in #1:

106682-3001 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH F 019 Z10 428 f019z10428
ZEXEL 106682-3001 1066823001
HINO 220204211A 220204211a


Zexel num
Bosch num
Firm num
Name
106682-3001 
106682-3002 
F 019 Z10 428 
220204211A  HINO
INJECTION-PUMP ASSEMBLY
K13B-TI * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8130
Bosch type code   EFEP215A
Nozzle   105780-0050
Bosch type code   DN6TD119NP1T
Nozzle holder   105780-2090
Bosch type code   EFEP215
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-4-1000
Overflow valve (drive side)   134424-0820
Overflow valve opening pressure (drive side) kPa   127 107 147
Overflow valve opening pressure (drive side) kgf/cm2   1.3 1.1 1.5
Overflow valve (governor side)   134424-0820
Overflow valve opening pressure (governor side) kPa   127 107 147
Overflow valve opening pressure (governor side) kgf/cm2   1.3 1.1 1.5
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Left
  L
Injection timing adjustment
Direction of rotation (viewed from drive side)
Left
  L
Injection order   1-4-2-6- 3-5
Pre-stroke mm   3.3 3.27 3.33
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-4
deg.   60 59.75 60.25
Difference between angles 2
Cyl.1-2
deg.   120 119.75 120.25
Difference between angles 3
Cal 1-6
deg.   180 179.75 180.25
Difference between angles 4
Cal 1-3
deg.   240 239.75 240.25
Difference between angles 5
Cal 1-5
deg.   300 299.75 300.25
Injection quantity adjustment
Adjusting point   A
Rack position   15.4
Pump speed r/min   1110 1110 1110
Average injection quantity mm3/st.   470 467 473
Max. variation between cylinders %   0 -3 3
Basic   *
Fixing the lever   *
Boost pressure kPa   104 104
Boost pressure mmHg   780 780
Injection quantity adjustment_02
Adjusting point   B
Rack position   6.7+-0.5
Pump speed r/min   265 265 265
Average injection quantity mm3/st.   13.5 10.5 16.5
Max. variation between cylinders %   0 -15 15
Fixing the rack   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
Boost compensator adjustment
Pump speed r/min   500 500 500
Rack position   R1-3.9
Boost pressure kPa   26.7 24 29.4
Boost pressure mmHg   200 180 220
Boost compensator adjustment_02
Pump speed r/min   500 500 500
Rack position   R1(15.4)
Boost pressure kPa   90.6 83.9 97.3
Boost pressure mmHg   680 630 730

Test data Ex:

Governor adjustment

Test data 106682-3001
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Tolerance for racks not indicated: +-0.05mm. (3)Boost compensator excessive fuel lever at operation: L1 (at 0 boost pressure) (4)Boost compensator stroke: BCL (5)Set idle sub-spring (6)Main spring setting
----------
K=18 L1=16.5+-0.1mm BCL=3.9+-0.1mm
----------

Speed control lever angle

Test data 106682-3001
F:Full speed I:Idle (1)Stopper bolt setting
----------

----------
a=(23deg)+-5deg b=(32deg)+-5deg

Stop lever angle

Test data 106682-3001
N:Pump normal S:Stop the pump.
----------

----------
a=27deg+-5deg b=53deg+-5deg

0000001101

Test data 106682-3001
N:Normal B:When boosted (1)Rack position = aa at boost pressure = 0. (2)Drive side
----------
aa=16.5+-0.1mm
----------
a=(15deg) b=(15deg)

0000001501 Q ADJUSTMENT PIPING

Test data 106682-3001
Fuel hose adjusting procedure Fuel inlet hose A Fuel inlet hose B Fuel hose C ( (for bypass) (D) Overflow valve 1. Because the pump gallery is divided into two, be careful of the fuel piping. (1)Connect the fuel inlet hose to port (a). (2)Connect the fuel hose (for bypass) to ports (b) and (c). (3)Assemble the overflow valve (D) to the fuel outlet hose and connect to port (d).
----------

----------

Timing setting

Test data 106682-3001
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(1deg)




Information:


LATER
EARLIERRemove Fuel Transfer Pump
1. Disconnect fuel lines (1) and (2) from the fuel transfer pump. Put plugs and caps in the openings. 2. Remove two bolts (3) that hold the fuel transfer pump to the fuel injection pump drive.3. Remove fuel transfer pump (4).Install Fuel Transfer Pump
1. Put fuel transfer pump (1) in position so the shaft is in alignment with the groove in the fuel injection pump drive. Install the bolts that hold it. 2. Remove the plugs or caps from the openings. Connect fuel lines (2) and (3) to the fuel transfer pump.3. Remove the air from the fuel system. See PRIMING THE FUEL SYSTEM in LUBRICATION AND MAINTENANCE GUIDE.Disassemble Fuel Transfer Pump (Earlier)
start by: a) remove fuel transfer pump 1. Remove six bolts (1) that hold the transfer pump cover to transfer pump body. Remove the cover.2. Remove the plug (2), seat, spring and fuel bypass valve from cover. 3. Remove the gear (5) and shaft assembly (4) from the body (3). 4. Remove the seals (6) from the body. 5. Use tooling (A) to remove the bearing from the body.Assemble Fuel Transfer Pump (Earlier)
1. Use tooling (A) to install bearing into body.2. Use tool (B) to install inner seal in body. Install seal with lip of seal in the direction of the gears. 3. Use tool (C) to install outer seal in the body. Install seal with lip of seal toward the outside. 4. Install tool (D) on to shaft assembly (1) and install shaft assembly into body.
Tool (D) must be used to install shaft assembly. The shaft will cause damage to seals if it is not used.
5. Install idler gear (2) in the body. 6. Install fuel bypass valve (3), spring (4), seat (5), and plug into cover.7. Put a thin amount of 8S6747 Aviation Type Permatex on face of body.
Do not let Permatex get into the pump body.
8. Put the cover (6) in position on the body and install the six bolts. After tightening cover to body, the gear and shaft assembly must turn freely.end by: a) install fuel transfer pump

Have questions with 106682-3001?





Group cross 106682-3001 ZEXEL

Hino 

F 019 Z10 427 
220204210A 
INJECTION-PUMP ASSEMBLY
K13B-TI
106682-3001  

106682-3002 
F 019 Z10 428 
220204211A 
INJECTION-PUMP ASSEMBLY
K13B-TI
F 019 Z10 429 
220204211B 
INJECTION-PUMP ASSEMBLY
K13B-TI
9 400 610 969 
 
INJECTION-PUMP ASSEMBLY
K13B-TI

Hino 

F 019 Z10 430 
220204212A 
INJECTION-PUMP ASSEMBLY
K13B-TI
9 400 617 517 
220204211C 
INJECTION-PUMP ASSEMBLY
K13B-TI
Back to top