Information injection-pump assembly
BOSCH
F 019 Z20 166
f019z20166
ZEXEL
106681-4402
1066814402
MITSUBISHI-HEAV
34A6570270
34a6570270

Rating:
Cross reference number
Zexel num
Bosch num
Firm num
Name
106681-4402
F 019 Z20 166
34A6570270 MITSUBISHI-HEAV
INJECTION-PUMP ASSEMBLY
S6B3-TA K 14CA INJECTION PUMP ASSY PE6P,6PD PE
S6B3-TA K 14CA INJECTION PUMP ASSY PE6P,6PD PE
Information:
start by: a) remove cylinder head1. Remove precombustion chambers and valve lifters. 2. Use tooling (A) to compress the valve spring. Remove locks that hold spring to valve stem.3. Remove tooling (A), the valve and spring assembly. 4. Inspect the valve seat insert. Measure the diameter of the valve stem. The minimum diameter of the stem is .3689 in. (9.37 mm). For 2M6402 and 2M6403 valves minimum diameter of valve stem is .3692 in. (9.378 mm). 5. Use tool (B) to measure valve spring force. Test force for valve springs is 55.0 3.5 lb. (244.65 15.57 N).6. The free length of spring is 2.31 in. (58.7 mm). The test length is 1.95 in. (49.5 mm). 7. Put clean engine oil on the valve stem. Install the washer, spring (1) and rotocoil (2). Install the valve through the valve guide.8. Install tooling (A) to put the valve spring under compression.
The valve spring must be put under compression just enough to permit the locks to be put in position on the valve stem.
9. Install the locks on the valve stem.
The locks can be thrown from the valve when the compressor is removed. Make certain the locks are in position before the valve compressor is removed.
10. Remove tooling (A) and hit the valve with a soft hammer to be sure that the locks make a seat on the valve stem.11. Install the valve lifters and precombustion chambers.end by: a) install cylinder head
The valve spring must be put under compression just enough to permit the locks to be put in position on the valve stem.
9. Install the locks on the valve stem.
The locks can be thrown from the valve when the compressor is removed. Make certain the locks are in position before the valve compressor is removed.
10. Remove tooling (A) and hit the valve with a soft hammer to be sure that the locks make a seat on the valve stem.11. Install the valve lifters and precombustion chambers.end by: a) install cylinder head
Have questions with 106681-4402?
Group cross 106681-4402 ZEXEL
Mitsubishi-Heav
106681-4402
F 019 Z20 166
34A6570270
INJECTION-PUMP ASSEMBLY
S6B3-TA
S6B3-TA