106676-2720 ZEXEL 9 400 617 458 BOSCH INJECTION-PUMP ASSEMBLY 9400617458 1066762720 me441600


 

Information injection-pump assembly

BOSCH 9 400 617 458 9400617458
ZEXEL 106676-2720 1066762720
MITSUBISHI ME441600 me441600
106676-2720 INJECTION-PUMP ASSEMBLY
Rating:
35
Buy INJECTION-PUMP ASSEMBLY 106676-2720 zexel genuine, new aftermarket engine parts with delivery

Service parts 106676-2720 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106067-0470
3. GOVERNOR 105407-8300
4. SUPPLY PUMP 105207-1200
5. AUTOM. ADVANCE MECHANIS 105681-2040
6. COUPLING PLATE 105663-0910
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105110-7550
11. Nozzle and Holder
12. Open Pre:MPa(Kqf/cm2) 17.7(180)/21.6(220)
13. NOZZLE-HOLDER 105041-4130
14. NOZZLE 105025-1190
15. NOZZLE SET

Include in #1:

106676-2720 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
106676-2720 
9 400 617 458 
ME441600  MITSUBISHI
INJECTION-PUMP ASSEMBLY
6D24T K 14CA INJECTION PUMP ASSY PE6P,6PD PE




Information:

2. Remove the nuts (1), washers, and bearing caps from the cylinder block.3. Remove the crankshaft from block. Weight of crankshaft is 240 lb. (108 kg).4. Remove the bearings from main bearing caps. 5. Remove the upper halves (2) of bearings from the cylinder block.Install Crankshaft
1. Clean the surfaces for bearings in cylinder block. Install the upper halves of bearings in the block. Put clean oil on the bearings. 2. Fasten a hoist and put the crankshaft in position on block with "V" mark on crankshaft gear in alignment with "V" mark on cluster gear.3. Clean the bearings caps, and install the lower halves of bearings in caps. 4. Use wire (A) to check bearing clearances. Install the bearing caps, and tighten both nuts to 70 5 lb. ft. (9.7 0.7 mkg). Put a mark across the nuts and studs, and turn nuts an additional 90° from mark. Remove caps and check thickness of wire (A) to find bearing clearance. Bearing clearance must be .0030 to .0059 in. (0.07 to 0.14 mm) for new parts. Maximum permissible clearance for used parts is .010 in. (0.254 mm).5. Put clean engine oil on threads of studs, face of washers, and lower halves of bearings. Put the bearing caps in their respective positions with number on cap on same side and the same as number on cylinder block. Install washers and nuts. Tighten nuts to 70 5 lb.ft. (9.7 0.7 mkg). Put a mark across the nuts and studs, and turn nuts an additional 90° from mark as shown. 6. Use indicator group (B) to check the crankshaft end play as controlled by bearing (1) on No. 4 main bearing cap (2). End play with new parts should be .011 to .018 in. (0.28 to 0.46 mm). Maximum permissible end play with used parts is .035 in. (0.89 mm).end by: a) install timing gear housingb) install pistonsc) install front cover

Have questions with 106676-2720?





Group cross 106676-2720 ZEXEL

Mitsubishi 

9 400 613 211 
ME441598 
INJECTION-PUMP ASSEMBLY
6D24T
9 400 617 457 
ME441599 
INJECTION-PUMP ASSEMBLY
6D24T
106676-2720  
9 400 617 458 
ME441600 
INJECTION-PUMP ASSEMBLY
6D24T
9 400 617 459 
ME441601 
INJECTION-PUMP ASSEMBLY
6D24T
9 400 617 460 
ME441602 
INJECTION-PUMP ASSEMBLY
6D24T
9 400 617 461 
ME441603 
INJECTION-PUMP ASSEMBLY
6D24T
9 400 613 177 
ME441604 
INJECTION-PUMP ASSEMBLY
6D24T
9 400 617 462 
ME441606 
INJECTION-PUMP ASSEMBLY
6D24TC
F 01G 09U 1HR 
ME441606 
INJECTION-PUMP ASSEMBLY
6D24TC
9 400 617 463 
ME441607 
INJECTION-PUMP ASSEMBLY
6D24TC
9 400 617 464 
ME441608 
INJECTION-PUMP ASSEMBLY
6D24TC
Back to top