106676-2671 ZEXEL F 01G 09U 1HJ BOSCH INJECTION-PUMP ASSEMBLY f01g09u1hj 1066762671 me444777


 

Information injection-pump assembly

BOSCH F 01G 09U 1HJ f01g09u1hj
ZEXEL 106676-2671 1066762671
MITSUBISHI ME444777 me444777
106676-2671 INJECTION-PUMP ASSEMBLY
Rating:
30
Buy INJECTION-PUMP ASSEMBLY 106676-2671 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

BOSCH F 01G 09U 1HJ f01g09u1hj
ZEXEL 106676-2671 1066762671
MITSUBISHI ME444777 me444777


Zexel num
Bosch num
Firm num
Name
106676-2671 
F 01G 09U 1HJ 
ME444777  MITSUBISHI
INJECTION-PUMP ASSEMBLY
6D24

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   131424-4620
Overflow valve opening pressure kPa   255 221 289
Overflow valve opening pressure kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-5-3-6- 2-4
Pre-stroke mm   4.8 4.75 4.85
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   9.6
Pump speed r/min   1100 1100 1100
Average injection quantity mm3/st.   98 95 101
Max. variation between cylinders %   0 -3 3
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   C
Rack position   6.5+-0.5
Pump speed r/min   300 300 300
Average injection quantity mm3/st.   9.5 6.9 12.1
Max. variation between cylinders %   0 -15 15
Fixing the rack   *
Injection quantity adjustment_03
Adjusting point   D
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   100 90 110
Fixing the lever   *
Rack limit   *
Timer adjustment
Pump speed r/min   650--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   600
Advance angle deg.   0.5
Timer adjustment_03
Pump speed r/min   1000
Advance angle deg.   2.5 2 3
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 106676-2671
N:Pump speed R:Rack position (mm) (1)Notch fixed: K (2)Tolerance for racks not indicated: +-0.05mm. (3)Torque spring does not operate. (4)RACK LIMIT (5)The torque control spring must does not have a set force.
----------
K=15
----------

Speed control lever angle

Test data 106676-2671
F:Full speed I:Idle (1)Stopper bolt setting
----------

----------
a=(28deg)+-5deg b=(12deg)+-5deg

Stop lever angle

Test data 106676-2671
N:Normal S:Stop the pump.
----------

----------
a=19deg+-5deg b=53deg+-5deg

Timing setting

Test data 106676-2671
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=13deg
----------
a=(5deg)




Information:

start by: a) remove oil pump1. Turn the crankshaft until the connecting rods are down for two pistons as shown. 2. Remove the nuts (1) and caps (4) from the connecting rods. 3. Remove the bearings (2) from the caps. Push up on connecting rods and remove the upper halves of bearings from the connecting rods.4. Clean the bearing contact surfaces in the caps and the rods. Install the upper halves of the bearings in connecting rods. Put clean oil on the bearings and pull the rod onto crankshaft. Put the lower halves of bearings in the caps.5. Put wire (A) across the lower halves of bearings and install the cap. Install and tighten both nuts on each cap to a torque of 30 3 lb.ft. (4.1 0.4 mkg). Put a mark across the nuts and bolts; and turn the nuts clockwise 90° from the marks as shown.6. Remove the caps, and take a measurement of the thickness of wire (A) to find bearing clearance. Clearance with new parts should be .003 to .006 in. (0.076 to 0.152 mm). Maximum permissible clearance is .010 in. (0.254 mm). 7. Put clean oil on the lower halves of bearings and on the threads of bolts (3). Install the caps on connecting rods. Install and tighten the nuts on each cap to 30 3 lb.ft. (4.1 0.4 mkg). Put a mark across the nuts and bolts; and turn the nuts clockwise 90° from the marks as shown.
Make sure the number mark on the side of connecting rod is the same number and on the same side as the number mark on the cap.
8. Do the above steps again for the remainder of the connecting rod bearings.end by: a) install oil pump

Have questions with 106676-2671?





Group cross 106676-2671 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 613 012 
ME440949 
INJECTION-PUMP ASSEMBLY
6D24T
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 617 453 
ME440800 
INJECTION-PUMP ASSEMBLY
6D24TL
9 400 612 954 
 
INJECTION-PUMP ASSEMBLY
6D24T

Mitsubishi 

9 400 612 954 
ME441326 
INJECTION-PUMP ASSEMBLY
6D24T
 
ME441326 
INJECTION-PUMP ASSEMBLY
6D24T
9 400 617 454 
ME440970 
INJECTION-PUMP ASSEMBLY
6D24TL
9 400 617 455 
ME441576 
INJECTION-PUMP ASSEMBLY
6D24TL
9 400 617 456 
ME441593 
INJECTION-PUMP ASSEMBLY
6D24
9 400 613 064 
ME441594 
INJECTION-PUMP ASSEMBLY
6D24
 
ME444776 
INJECTION-PUMP ASSEMBLY
6D24
9 400 613 233 
ME441595 
INJECTION-PUMP ASSEMBLY
6D24
106676-2671  
F 01G 09U 1HJ 
ME444777 
INJECTION-PUMP ASSEMBLY
6D24
9 400 613 304 
ME441596 
INJECTION-PUMP ASSEMBLY
6D24T
9 400 613 442 
ME441597 
INJECTION-PUMP ASSEMBLY
6D24T
Back to top