106675-4772 ZEXEL 9 400 612 704 BOSCH INJECTION-PUMP ASSEMBLY 9400612704 1066754772


 

Information injection-pump assembly

BOSCH 9 400 612 704 9400612704
ZEXEL 106675-4772 1066754772
106675-4772 INJECTION-PUMP ASSEMBLY
Rating:
19
Buy INJECTION-PUMP ASSEMBLY 106675-4772 zexel genuine, new aftermarket engine parts with delivery

Service parts 106675-4772 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106067-6422
3. GOVERNOR 105407-5911
4. SUPPLY PUMP 105217-6030
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE 105663-0510
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105111-5070
11. Nozzle and Holder 6152-12-3900
12. Open Pre:MPa(Kqf/cm2) 27.5{280}
13. NOZZLE-HOLDER 105041-7130
14. NOZZLE 105025-3550
15. NOZZLE SET

Include in #1:

106675-4772 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH 9 400 612 704 9400612704
ZEXEL 106675-4772 1066754772


Zexel num
Bosch num
Firm num
Name
106675-4772 
106675-4773 
9 400 612 704 
   
INJECTION-PUMP ASSEMBLY
* K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8130
Bosch type code   EFEP215A
Nozzle   105780-0050
Bosch type code   DN6TD119NP1T
Nozzle holder   105780-2090
Bosch type code   EFEP215
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   131425-2120
Overflow valve opening pressure kPa   157 157 157
Overflow valve opening pressure kgf/cm2   1.6 1.6 1.6
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Left
  L
Injection timing adjustment
Direction of rotation (viewed from drive side)
Left
  L
Injection order   1-5-3-6- 2-4
Pre-stroke mm   4.2 4.15 4.25
Rack position
Point A or more.
  R=A++
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   12.5
Pump speed r/min   900 900 900
Average injection quantity mm3/st.   321 318 324
Max. variation between cylinders %   0 -3 3
Basic   *
Fixing the rack   *
Injection quantity adjustment_02
Adjusting point   C
Rack position   6+-0.5
Pump speed r/min   375 375 375
Average injection quantity mm3/st.   19 17.5 20.5
Max. variation between cylinders %   0 -15 15
Fixing the rack   *

Test data Ex:

Governor adjustment

Test data 106675-4772
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Tolerance for racks not indicated: +-0.05mm. (3)Idle sub spring setting: L1.
----------
K=7 L1=5.8-0.5mm
----------

Speed control lever angle

Test data 106675-4772
F:Full speed I:Idle (1)Stopper bolt setting (2)Set the pump speed at aa (3)When pump speed set at bb (4)Stopper bolt setting
----------
aa=900r/min bb=750r/min
----------
a=4.5deg+-5deg b=21.5deg+-5deg c=6deg+-5deg

Stop lever angle

Test data 106675-4772
N:Pump normal S:Stop the pump. (1)No return spring (2)Use hole at R = aa (left hand side)
----------
aa=27mm
----------
a=26.5deg+-5deg b=53deg+-5deg

Timing setting

Test data 106675-4772
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)At rack position = at least aa (4)-
----------
aa=12.5mm
----------
a=(140deg)




Information:

To receive satisfactory engine performance with maximum fuel economy and service life, the following engine operation instructions must be applied. In addition, it is necessary to also apply the recommendations of the vehicle manufacturer as well as the every day rules of good driving.After the engine starts, reduce engine RPM to low idle with no load. When normal oil pressure is reached, operate the engine at low load for 5 minutes before applying full load.Stop Engine At Once If Any Part Fails
Almost all failures give a warning to the operator before the part completely fails. If the operator is alert and heeds the warnings, further damage may not happen. A few of the warning signs are: abnormal gauge readings, abnormal fluid levels, fluid leaks, unusual engine noises and excessive smoke. Do not operate an engine if any sign of part failure is present, only a few seconds can ruin an entire engine.Start vehicle in motion by utilizing the lowest gear speed in the transmission that will enable the engine to easily start the load without slipping the clutch. Accelerate smoothly and evenly until the engine speed reaches approximately 100% of rated RPM. Rapid depression of accelerator will result in undesirable heavy exhaust smoke and high fuel consumption with no increase in vehicle performance. Upshift to the next higher gear speed. If properly done, the engine speed will be above approximately 80% of rated RPM when the load is applied. For best performance do not skip gears. Engine speed should not be permitted to drop appreciably below 80% of rated RPM, to avoid a lugging condition.Caterpillar engines have good lugging characteristics; however, operating in a lug condition for extended periods of time should be avoided as it causes exhaust temperatures to rise and also results in high fuel consumption. A lug condition exists when an increase in engine speed cannot be achieved with an increase in accelerator pedal position, or when engine speed decreases with the accelerator pedal in its maximum position. A lug condition can exist at any engine speed below full load speed. Continue to make successive upshifts through each gear speed in the transmission until cruising speed is reached. In each gear speed, accelerate smoothly to an engine speed of approximately 100% of rated RPM before upshifting to the next gear. For highway cruising, maintain the engine speed between approximately 80% and 100% of rated RPM. Operating in this range will give maximum fuel economy.When going up a grade and the engine speed drops to below approximately 80% of rated RPM, downshift successively until a gear speed is reached that will enable the engine to pull the load without operating in a lug condition. When pulling a long grade, such as encountered in mountain driving, make additional downshifts of one or two gears immediately prior to reaching the summit. This will allow the engine to cool more slowly than if the load on the engine is suddenly changed from a full load condition going uphill to

Have questions with 106675-4772?





Group cross 106675-4772 ZEXEL

Komatsu 

9 400 619 869 
6152711914 
INJECTION-PUMP ASSEMBLY
SA6D125
 
 
INJECTION-PUMP ASSEMBLY
SA6D125
9 400 612 427 
 
INJECTION-PUMP ASSEMBLY

Komatsu 

9 400 617 409 
6152711915 
INJECTION-PUMP ASSEMBLY
SA6D125
 
6152721912 
INJECTION-PUMP ASSEMBLY
SA6D125
9 400 612 126 
 
INJECTION-PUMP ASSEMBLY
SA6D125

Komatsu 

9 400 612 504 
6152721913 
INJECTION-PUMP ASSEMBLY
SA6D125
F 01G 09U 08Z 
6152721914 
INJECTION-PUMP ASSEMBLY
SAA6D125
F 019 Z20 424 
 
INJECTION-PUMP ASSEMBLY
9 400 613 270 
 
INJECTION-PUMP ASSEMBLY

Komatsu 

9 400 617 410 
6152721915 
INJECTION-PUMP ASSEMBLY
SAA6D125
 
6211711493 
INJECTION-PUMP ASSEMBLY
S6D140
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Komatsu 

9 400 617 411 
6211711494 
INJECTION-PUMP ASSEMBLY
S6D140
 
6211711691 
INJECTION-PUMP ASSEMBLY
S6D140
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Komatsu 

9 400 617 412 
6211711692 
INJECTION-PUMP ASSEMBLY
S6D140
 
 
INJECTION-PUMP ASSEMBLY
SA6D108

Komatsu 

9 400 617 413 
6222711911 
INJECTION-PUMP ASSEMBLY
SA6D108
9 400 617 414 
6152721380 
INJECTION-PUMP ASSEMBLY
SA6D125
 
 
INJECTION-PUMP ASSEMBLY
SA6D125

Komatsu 

9 400 612 667 
6152721920 
INJECTION-PUMP ASSEMBLY
SA6D125
 
 
INJECTION-PUMP ASSEMBLY
9 400 613 303 
 
INJECTION-PUMP ASSEMBLY

Komatsu 

9 400 617 415 
6152721921 
INJECTION-PUMP ASSEMBLY
SA6D125
F 019 Z10 244 
 
INJECTION-PUMP ASSEMBLY
F 019 Z10 245 
 
INJECTION-PUMP ASSEMBLY
106675-4772  

106675-4773 
9 400 612 704 
 
INJECTION-PUMP ASSEMBLY

Komatsu 

9 400 617 416 
6152721490 
INJECTION-PUMP ASSEMBLY
SAA6D125

Niigata-Urawa 

 
75G47230A 
INJECTION-PUMP ASSEMBLY
6NSF-G

Niigata-Tekkou 

9 400 617 417 
75G47230B 
INJECTION-PUMP ASSEMBLY
6NSF-G
 
75G47230C 
INJECTION-PUMP ASSEMBLY
6NSF-G

Komatsu 

9 400 617 418 
6211721180 
INJECTION-PUMP ASSEMBLY
SA6D140
Back to top