106675-4501 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1066754501


 

Information injection-pump assembly

ZEXEL 106675-4501 1066754501
106675-4501 INJECTION-PUMP ASSEMBLY
Rating:
34
Buy INJECTION-PUMP ASSEMBLY 106675-4501 zexel genuine, new aftermarket engine parts with delivery

Service parts 106675-4501 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106067-0381
3. GOVERNOR 105407-6871
4. SUPPLY PUMP 105217-6030
5. AUTOM. ADVANCE MECHANIS
6. COUPLING PLATE 105664-0431
7. COUPLING PLATE 156637-2820
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105111-4540
11. Nozzle and Holder 6152-12-3100
12. Open Pre:MPa(Kqf/cm2) 27.5{280}
13. NOZZLE-HOLDER 105041-7130
14. NOZZLE 105025-0120
15. NOZZLE SET

Include in #1:

106675-4501 as INJECTION-PUMP ASSEMBLY

Cross reference number

ZEXEL 106675-4501 1066754501


Zexel num
Bosch num
Firm num
Name
106675-4501 
 
   
INJECTION-PUMP ASSEMBLY

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   131424-1520
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Left
  L
Injection timing adjustment
Direction of rotation (viewed from drive side)
Left
  L
Injection order   1-5-3-6- 2-4
Pre-stroke mm   3.8 3.75 3.85
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   9.4
Pump speed r/min   1015 1015 1015
Average injection quantity mm3/st.   172 170 174
Max. variation between cylinders %   0 -3 3
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   D
Rack position   5.7+-0.5
Pump speed r/min   350 350 350
Average injection quantity mm3/st.   13 11.5 14.5
Max. variation between cylinders %   0 -15 15
Fixing the rack   *
Injection quantity adjustment_03
Adjusting point   E
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   170 160 180
Fixing the lever   *
Rack limit   *

Test data Ex:

Governor adjustment

Test data 106675-4501
N:Pump speed R:Rack position (mm) (1)Notch fixed: K (2)Tolerance for racks not indicated: +-0.05mm. (3)RACK LIMIT (4)Rack difference between N = N1 and N = N2
----------
K=12 N1=1015r/min N2=230r/min
----------

Speed control lever angle

Test data 106675-4501
F:Full speed I:Idle S:Stop (1)Speed lever play angle not less than aa (2)Use the hole at R = bb
----------
aa=6deg bb=85mm
----------
a=(4deg)+-5deg b=(22deg)+-5deg c=35deg+-3deg

Timing setting

Test data 106675-4501
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(150deg)




Information:

Use the following tests for troubleshooting and repair steps. Use the ""Test for Cylinder Cutout"" in order to determine if the replacement of individual injectors is needed. Replace suspect injectors with the part number of the original injector. Use the ""Test for Leakage from Poppet Valve"" in order to determine if the full set of injectors need to be replaced. For replacement of the full set of injectors, use the current injectors and new software that is listed in Table 2.Test for Cylinder Cutout
The cylinder cutout test should be used in order to determine if an individual injector may have caused the failure.
Warm the engine out of cold mode.
Connect Cat ET to the engine while the engine is running.
Ensure that the engine speed is 1200 rpm 125 rpm. An extremely rough running engine will need to be diagnosed by other methods.
Cut out one bank of cylinders. Note engine rpm and the fuel position on the Cat ET screen at that time.
Cut out one of the remaining cylinders from the cylinder bank that is running. Allow the engine to stabilize, and note the fuel position.
Give power back to that cylinder. Allow the engine to stabilize. Note the fuel position.
Repeat steps 5 through 6 until the cylinder bank has been completely checked.
Power all cylinders. Allow the engine to stabilize.
Cut out the other cylinder bank and repeat steps 5 through 8.
Repeat steps 4 through 9 with the engine at 2000 rpm.
Compare the results from the fuel position from each cylinder.
If the cylinder was cut out and the fuel position did not change the cylinder may not have been producing power. This cylinder would be suspect.
When you are finished with the test, reduce engine RPM to low idle. Shut off the engine.
Replace any suspect injector with a similar original injector. Install new seals for the injector and the jumper tube during this repair. The repair procedure for the injector is found in Special Instruction, REHS0116.It is possible that multiple injectors are functioning improperly. Complete ""Test for Leakage from Poppet Valve"" in order to evaluate possible excessive leakage from the injectors.Test for Leakage from Poppet Valve
Warm the engine out of Cold Mode to normal operating temperature.
Turn off the engine.
Remove the valve cover bolts in preparation in order to observe the injectors. Leave the covers in place.
Hot oil and components can cause personal injury.Do not allow hot oil or components to contact skin.
Restart the engine and run at low idle with no load.
Use Cat ET in order to perform the test that overrides the injection actuation system. Increase injection actuation pressure to the maximum value.
Observe all of the injectors under each valve cover for leakage at the spill port. A small amount of dripping is acceptable. However, a continuous stream of oil is an indication of excessive leakage of the poppet valve. Only leaks at the spill port are an indication of excessive leakage from the poppet valve.
If multiple injectors display excessive leakage from the poppet valves, update the set of injectors with

Have questions with 106675-4501?





Group cross 106675-4501 ZEXEL

Komatsu 

 
 
INJECTION-PUMP ASSEMBLY
SA6D125
106675-4501  
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Komatsu 

9 400 611 223 
6152721250 
INJECTION-PUMP ASSEMBLY
SA6D125
9 400 612 630 
6152721251 
INJECTION-PUMP ASSEMBLY
SA6D125
Back to top