106675-4340 ZEXEL 9 400 617 390 BOSCH INJECTION-PUMP ASSEMBLY 9400617390 1066754340 6151711130


 

Information injection-pump assembly

BOSCH 9 400 617 390 9400617390
ZEXEL 106675-4340 1066754340
KOMATSU 6151711130 6151711130
106675-4340 INJECTION-PUMP ASSEMBLY
Rating:
9
Buy INJECTION-PUMP ASSEMBLY 106675-4340 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

BOSCH 9 400 617 390 9400617390
ZEXEL 106675-4340 1066754340
KOMATSU 6151711130 6151711130


Zexel num
Bosch num
Firm num
Name
106675-4340 
9 400 617 390 
6151711130  KOMATSU
INJECTION-PUMP ASSEMBLY
S6D125 K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   131424-1520
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Left
  L
Injection timing adjustment
Direction of rotation (viewed from drive side)
Left
  L
Injection order   1-5-3-6- 2-4
Pre-stroke mm   3.8 3.75 3.85
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   8.2
Pump speed r/min   900 900 900
Average injection quantity mm3/st.   114 112 116
Max. variation between cylinders %   0 -3 3
Basic   *
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   B
Rack position   3.6+-0.5
Pump speed r/min   375 375 375
Average injection quantity mm3/st.   13.3 11.8 14.8
Max. variation between cylinders %   0 -15 15
Fixing the rack   *

Test data Ex:

Governor adjustment

Test data 106675-4340
N:Pump speed R:Rack position (mm) (1)Tolerance for racks not indicated: +-0.05mm. (2)Ship with boost compensator not operating. (3)Damper spring setting
----------

----------

Speed control lever angle

Test data 106675-4340
F:Full speed
----------

----------
a=(17deg)+-5deg

0000000901

Test data 106675-4340
F:Full load I:Idle (1)Use the hole at R = aa
----------
aa=50mm
----------
a=21deg+-5deg b=(27deg)+-3deg

Stop lever angle

Test data 106675-4340
N:Pump normal S:Stop the pump. (1)Drive side
----------

----------
a=32deg+-5deg b=64deg+-5deg

Timing setting

Test data 106675-4340
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(150deg)




Information:

Procedure
Note: Prior to performing the analysis with the APC, be sure to read and understand all the interferences listed in the "Interferences Inherent In the Fuel Sample" section of this document. Ensure that all precautions have been taken to minimize the affect of skewed results due to improper sampling, handling, or preparation.
Obtain the fuel sample to be analyzed in an appropriate sample bottle as described in the "Fuel Sample Preparation" section. Manually or mechanically shake the sample vigorously for 30 seconds. When manually shaking a sample, ensure thorough mixing of the sample by turning the bottle so that the lid is facing downward. Shake by moving the wrist and/or forearm up and down as rapidly as is comfortable for the 30 seconds.Note: Degassing samples can be accomplished with either the use of an ultrasonic bath or with the use of a vacuum pump.
Immediately degas the sample, by partially opening the lid to the bottle and placing the sample upright in the degassing unit. Perform only one of the degassing methods. An ultrasonic bath is the best method for degassing a sample. An ultrasonic bath takes the least amount of time minimizing the impact of particle settling.Note: The purpose of partially unscrewing or opening the lid is to promote quick degassing of the sample. Air bubbles to remaining near the surface of the sample following the degassing process are acceptable.
Illustration 5 g01741117
If an ultrasonic bath is unavailable, an alternative method of degassing the sample is with the use of a 1U-5718 Oil Sampling Vacuum Pump. Ensure the 1U-5718 Oil Sampling Vacuum Pump is clean before beginning the degas process.Note: Rubber is to be placed over the hole of the tubing for the pump to develop and hold the required vacuum.
With the sample to be analyzed in the sample bottle, thread the bottle into the bottom of the 1U-5718 Oil Sampling Vacuum Group. Operate the pump to create a vacuum. Maintain the vacuum until all air bubbles have risen to the surface of the sample and dissipated.
If an ultrasonic bath or a vacuum pump is not available, the sample can degas naturally. Degas the sample by setting the sample on a flat surface and leaving the sample undisturbed. If the APC performs a flushing cycle, let the sample sit for 15 seconds. If the APC does not perform a flushing cycle, such as the 293-8413 HYDAC Contamination Monitor Group or the 383-4255 HYDAC Contamination Monitor Group, let the sample sit for 30 seconds. Proceed to the "Sample Processing" section.Sample Processing
Remove the lid from the sample bottle. Immediately begin the processing of the sample on the APC that has been prepared according to the "Fuel Sample Preparation" section.Note: If more than 45 seconds elapse after the shaking of the sample, the procedure shall be restarted with shaking of the sample in "Fuel Sample Preparation" section. Shaking the sample ensures that suspended particles do not settle to the bottom of the sample, causing inaccurate particle count results.
Obtain the particle count results

Have questions with 106675-4340?





Group cross 106675-4340 ZEXEL

Komatsu 

 
6152721950 
INJECTION-PUMP ASSEMBLY
SA6D125E
 
 
INJECTION-PUMP ASSEMBLY

Komatsu 

9 400 617 387 
6152721951 
INJECTION-PUMP ASSEMBLY
SA6D125E
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Komatsu 

9 400 619 868 
6152721810 
INJECTION-PUMP ASSEMBLY
SA6D125E
9 400 617 388 
6152721811 
INJECTION-PUMP ASSEMBLY
SA6D125E
 
6211711640 
INJECTION-PUMP ASSEMBLY
S6D140
9 400 619 774 
6211711641 
INJECTION-PUMP ASSEMBLY
S6D140
9 400 617 389 
6211711642 
INJECTION-PUMP ASSEMBLY
S6D140
 
6152721220 
INJECTION-PUMP ASSEMBLY
SA6D125E
9 400 611 275 
6152721221 
INJECTION-PUMP ASSEMBLY
SA6D125E
9 400 613 063 
6152721222 
INJECTION-PUMP ASSEMBLY
SA6D125E
106675-4340  
9 400 617 390 
6151711130 
INJECTION-PUMP ASSEMBLY
S6D125
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Komatsu 

 
6152711450 
INJECTION-PUMP ASSEMBLY
SA6D125
9 400 617 391 
6152711451 
INJECTION-PUMP ASSEMBLY
SA6D125
 
6152711910 
INJECTION-PUMP ASSEMBLY
SA6D125
9 400 611 667 
6152711911 
INJECTION-PUMP ASSEMBLY
SA6D125
9 400 611 763 
6152711912 
INJECTION-PUMP ASSEMBLY
SA6D125
 
 
INJECTION-PUMP ASSEMBLY
SA6D125

Komatsu 

9 400 617 392 
6152711913 
INJECTION-PUMP ASSEMBLY
SA6D125

Daewoo 

9 400 611 168 
 
INJECTION-PUMP ASSEMBLY
DE12TI
9 400 617 393 
 
INJECTION-PUMP ASSEMBLY
DE12TI

Komatsu 

9 400 610 959 
6152721960 
INJECTION-PUMP ASSEMBLY
SA6D125E
9 400 612 125 
6152721961 
INJECTION-PUMP ASSEMBLY
SA6D125E
9 400 610 960 
 
INJECTION-PUMP ASSEMBLY
SA6D125E

Komatsu 

9 400 612 953 
6152721310 
INJECTION-PUMP ASSEMBLY
SA6D125E
Back to top