106673-7602 ZEXEL 9 400 611 719 BOSCH INJECTION-PUMP ASSEMBLY 9400611719 1066737602 me158316


 

Information injection-pump assembly

BOSCH 9 400 611 719 9400611719
ZEXEL 106673-7602 1066737602
MITSUBISHI ME158316 me158316
106673-7602 INJECTION-PUMP ASSEMBLY
Rating:
9
Buy INJECTION-PUMP ASSEMBLY 106673-7602 zexel genuine, new aftermarket engine parts with delivery

Service parts 106673-7602 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106067-1251
3. GOVERNOR 105408-0890
4. SUPPLY PUMP 105207-1200
5. AUTOM. ADVANCE MECHANIS 105636-2750
6. COUPLING PLATE 105663-0910
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105110-7550
11. Nozzle and Holder ME158263
12. Open Pre:MPa(Kqf/cm2) 17.7{180}/21.6{220}
13. NOZZLE-HOLDER 105041-4130
14. NOZZLE
15. NOZZLE SET 105019-0700

Include in #1:

106673-7602 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH 9 400 611 719 9400611719
ZEXEL 106673-7602 1066737602
MITSUBISHI ME158316 me158316


Zexel num
Bosch num
Firm num
Name
106673-7602 
9 400 611 719 
ME158316  MITSUBISHI
INJECTION-PUMP ASSEMBLY
6D24 K 14CA INJECTION PUMP ASSY PE6P,6PD PE

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SEAJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   131424-4620
Overflow valve opening pressure kPa   255 221 289
Overflow valve opening pressure kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-5-3-6- 2-4
Pre-stroke mm   4.8 4.75 4.85
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   8.6
Pump speed r/min   1000 1000 1000
Average injection quantity mm3/st.   77.5 74.5 80.5
Max. variation between cylinders %   0 -3 3
Basic   *
Fixing the rack   *
Injection quantity adjustment_02
Adjusting point   C
Rack position   6.5+-0.5
Pump speed r/min   300 300 300
Average injection quantity mm3/st.   9.5 6.9 12.1
Max. variation between cylinders %   0 -15 15
Fixing the rack   *
Injection quantity adjustment_03
Adjusting point   D
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   100 90 110
Fixing the lever   *
Rack limit   *
Timer adjustment
Pump speed r/min   650--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   600
Advance angle deg.   0.5
Timer adjustment_03
Pump speed r/min   1000
Advance angle deg.   2.5 2 3
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 106673-7602
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Tolerance for racks not indicated: +-0.05mm. (3)RACK LIMIT (4)The torque control spring must does not have a set force. (5)Set idle sub-spring
----------
K=14
----------

Speed control lever angle

Test data 106673-7602
F:Full speed I:Idle (1)Stopper bolt setting
----------

----------
a=22deg+-5deg b=8deg+-5deg

Stop lever angle

Test data 106673-7602
N:Pump normal S:Stop the pump.
----------

----------
a=19deg+-5deg b=53deg+-5deg

Timing setting

Test data 106673-7602
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=13deg
----------
a=(7deg)




Information:


Before any service work is to be done on this fuel system, the outer surface of the injection pump housing must be clean.
The fuel injection pump housing and governor has been removed from the engine for illustration purposes. 1. Remove the flange (1) and the flange assembly from the cover.2. Remove the cover (2) from the pump housing. 3. Remove the bypass valve (3) and springs from the pump housing. 4. Install tooling (A) on the fuel injection pump and loosen the bushing from the pump housing. Do not loosen the screws (4) that hold the levers to the shaft when removing or installing pumps. If the levers are moved, fuel pump calibration will be changed. 5. Remove the fuel injection pump (5) from the pump housing. The sleeve (6) on the plunger will slide off the lever as the pump is removed.6. Do Steps 4 and 5 for the remainder of the pumps.Install Fuel Injection Pumps
1. Turn the camshaft until the lifter for the pump to be installed is at its lowest position. 2. Install the fuel injection pump (1) in the bore of the pump housing.3. The sleeve (2) will be engaged with the lever when the pump is installed correctly.
If the levers have been moved on the shaft, fuel pump calibration must be made. (See Testing and Adjusting).
4. Tighten the bushing with tooling (A) to a torque of 70 5 lb.ft. (9.7 0.7 mkg).5. Do Steps 1 through 4 for the remainder of the pumps. 6. Install the bypass valve and spring (3) in the pump housing. 7. Install the cover (5) on the pump housing. Be sure the spring (3) is in the bore in the cover.8. Install the flange (4) and the flange assembly on the cover.Disassemble Fuel Injection Pumps
start by: a) remove fuel injection pumps 1. Remove the bushing (1) and seal from the bonnet (2).2. Remove the ring (3) from the bonnet and barrel (7). Remove the check valve (6) and spring (4) from the bonnet.3. Remove the spring (8) and washer (5). Remove the plunger (9) and sleeve (10). Keep the plunger and sleeve with their respective barrel for installation. Do not use plungers, sleeves and barrels with other plungers, sleeves and barrels.Assemble Fuel Injection Pumps
1. Install the sleeve (4), plunger (5), spring (2) and washer (3) on the barrel (1). Be sure the sleeve and plunger are installed in their original barrel and the large hole in the plunger is up. The sleeve must be installed with the thin flange up.2. Install the check valve and spring in the bonnet. Connect the barrel and bonnet and install the ring. Install the seal and bushing on the bonnet.end by: a) install fuel injection pumps

Have questions with 106673-7602?





Group cross 106673-7602 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

106673-7602  
9 400 611 719 
ME158316 
INJECTION-PUMP ASSEMBLY
6D24
F 01G 09U 08Y 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 610 945 
ME158300 
INJECTION-PUMP ASSEMBLY
6D24T
9 400 617 349 
ME158295 
INJECTION-PUMP ASSEMBLY
6D22T
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 611 336 
ME158333 
INJECTION-PUMP ASSEMBLY
6D24TC
F 019 Z20 137 
ME442606 
INJECTION-PUMP ASSEMBLY
6D24TC
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 617 350 
ME158332 
INJECTION-PUMP ASSEMBLY
6D24T
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 613 160 
ME158301 
INJECTION-PUMP ASSEMBLY
6D24TC
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 610 946 
ME158335 
INJECTION-PUMP ASSEMBLY
6D24T
9 400 610 947 
ME158319 
INJECTION-PUMP ASSEMBLY
6D24TC
9 400 611 273 
ME158373 
INJECTION-PUMP ASSEMBLY
6D24
9 400 610 948 
ME158355 
INJECTION-PUMP ASSEMBLY
6D24T
Back to top