Information injection-pump assembly
BOSCH
9 400 617 348
9400617348
ZEXEL
106673-7570
1066737570
MITSUBISHI
ME158264
me158264

Rating:
Service parts 106673-7570 INJECTION-PUMP ASSEMBLY:
1.
_
7.
COUPLING PLATE
8.
_
9.
_
11.
Nozzle and Holder
ME059621
12.
Open Pre:MPa(Kqf/cm2)
21.6{220}
15.
NOZZLE SET
Include in #1:
106673-7570
as INJECTION-PUMP ASSEMBLY
Cross reference number
BOSCH
9 400 617 348
9400617348
ZEXEL
106673-7570
1066737570
MITSUBISHI
ME158264
me158264
Zexel num
Bosch num
Firm num
Name
106673-7570
9 400 617 348
ME158264 MITSUBISHI
INJECTION-PUMP ASSEMBLY
6D22T * K 14CA INJECTION PUMP ASSY PE6P,6PD PE
6D22T * K 14CA INJECTION PUMP ASSY PE6P,6PD PE
Calibration Data:
Adjustment conditions
Test oil
1404 Test oil ISO4113 or {SAEJ967d}
1404 Test oil ISO4113 or {SAEJ967d}
Test oil temperature
degC
40
40
45
Nozzle and nozzle holder
105780-8140
Bosch type code
EF8511/9A
Nozzle
105780-0000
Bosch type code
DN12SD12T
Nozzle holder
105780-2080
Bosch type code
EF8511/9
Opening pressure
MPa
17.2
Opening pressure
kgf/cm2
175
Injection pipe
Outer diameter - inner diameter - length (mm) mm 8-3-600
Outer diameter - inner diameter - length (mm) mm 8-3-600
Overflow valve
131424-4620
Overflow valve opening pressure
kPa
255
221
289
Overflow valve opening pressure
kgf/cm2
2.6
2.25
2.95
Tester oil delivery pressure
kPa
157
157
157
Tester oil delivery pressure
kgf/cm2
1.6
1.6
1.6
Direction of rotation (viewed from drive side)
Right R
Right R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right R
Right R
Injection order
1-5-3-6-
2-4
Pre-stroke
mm
4.8
4.75
4.85
Beginning of injection position
Governor side NO.1
Governor side NO.1
Difference between angles 1
Cal 1-5 deg. 60 59.5 60.5
Cal 1-5 deg. 60 59.5 60.5
Difference between angles 2
Cal 1-3 deg. 120 119.5 120.5
Cal 1-3 deg. 120 119.5 120.5
Difference between angles 3
Cal 1-6 deg. 180 179.5 180.5
Cal 1-6 deg. 180 179.5 180.5
Difference between angles 4
Cyl.1-2 deg. 240 239.5 240.5
Cyl.1-2 deg. 240 239.5 240.5
Difference between angles 5
Cal 1-4 deg. 300 299.5 300.5
Cal 1-4 deg. 300 299.5 300.5
Injection quantity adjustment
Adjusting point
A
Rack position
11.7
Pump speed
r/min
900
900
900
Average injection quantity
mm3/st.
134.5
131.5
137.5
Max. variation between cylinders
%
0
-3
3
Basic
*
Fixing the lever
*
Injection quantity adjustment_02
Adjusting point
C
Rack position
5.4+-0.5
Pump speed
r/min
365
365
365
Average injection quantity
mm3/st.
10.5
7.9
13.1
Max. variation between cylinders
%
0
-15
15
Fixing the rack
*
Injection quantity adjustment_03
Adjusting point
D
Rack position
-
Pump speed
r/min
100
100
100
Average injection quantity
mm3/st.
125
105
145
Fixing the lever
*
Rack limit
*
Timer adjustment
Pump speed
r/min
(900)
Advance angle
deg.
0.5
Timer adjustment_02
Pump speed
r/min
-
Advance angle
deg.
2
2
2
Remarks
Measure the actual speed, stop
Measure the actual speed, stop
Test data Ex:
Governor adjustment

N:Pump speed
R:Rack position (mm)
(1)Notch fixed: K
(2)Tolerance for racks not indicated: +-0.05mm.
(3)Torque spring does not operate.
(4)RACK LIMIT
(5)Main spring setting
(6)Rack difference between N = N1 and N = N2
(7)Rack difference between N = N3 and N = N4
(8)Set idle sub-spring
----------
K=8 N1=900r/min N2=700r/min N3=900r/min N4=400r/min
----------
----------
K=8 N1=900r/min N2=700r/min N3=900r/min N4=400r/min
----------
Speed control lever angle

F:Full speed
I:Idle
(1)Stopper bolt setting
----------
----------
a=(22deg)+-5deg b=(2deg)+-5deg
----------
----------
a=(22deg)+-5deg b=(2deg)+-5deg
Stop lever angle

N:Pump normal
S:Stop the pump.
----------
----------
a=19deg+-5deg b=53deg+-5deg
----------
----------
a=19deg+-5deg b=53deg+-5deg
Timing setting

(1)Pump vertical direction
(2)Coupling's key groove position at No 1 cylinder's beginning of injection
(3)-
(4)-
----------
----------
a=(7deg)
----------
----------
a=(7deg)
Information:
Start By:a. remove valve cover 1. Disconnect fuel line nut (1). Remove nut (2) and O-ring seal. Disconnect fuel line nut (4) and remove fuel line assembly (3).
Put protection caps on all fuel line openings.
2. Remove retainer (5) from fuel adapter with Tool (B). 3. Install Tooling (C) and remove fuel nozzle assembly from adapter. 4. Install Tool (D) and remove adapter (6). 5. Remove carbon seal stop (7) with Tool (E). 6. Remove washer (8) and bleed screw (9) from fuel nozzle assembly (10). The following steps are for the installation of the fuel injection nozzles and adapters. 7. Install new carbon seal stop (7) with Tool (E). 8. Make sure the correct washer (8) is used when the nozzle assembly (10) is installed. Always use a new washer anytime the bleed screw (9) is loosened or removed. Install fuel nozzle assembly (10) in adapter (6). Install retainer (5) to a torque of 48 7 N m (35 5 lb ft). 9. Put 5P-3931 Anti-Seize Compound on the threads of the adapter before installation. Install fuel adapter (6) with Tool (D). Torque for the adapter is 200 14 N m (150 10 lb ft).10. Install fuel injection line assembly (3) (finger tighten connections first). Install the O-ring seal and nut (2) to a torque of 30 7 N m (22 5 lb ft). Reconnect fuel line nut (1) to a torque of 40 7 N m (30 5 lb ft). Use Tool (A) to reconnect fuel line nut (4) to a torque of 40 7 N m (30 5 lb ft).End By:a. install valve cover
Put protection caps on all fuel line openings.
2. Remove retainer (5) from fuel adapter with Tool (B). 3. Install Tooling (C) and remove fuel nozzle assembly from adapter. 4. Install Tool (D) and remove adapter (6). 5. Remove carbon seal stop (7) with Tool (E). 6. Remove washer (8) and bleed screw (9) from fuel nozzle assembly (10). The following steps are for the installation of the fuel injection nozzles and adapters. 7. Install new carbon seal stop (7) with Tool (E). 8. Make sure the correct washer (8) is used when the nozzle assembly (10) is installed. Always use a new washer anytime the bleed screw (9) is loosened or removed. Install fuel nozzle assembly (10) in adapter (6). Install retainer (5) to a torque of 48 7 N m (35 5 lb ft). 9. Put 5P-3931 Anti-Seize Compound on the threads of the adapter before installation. Install fuel adapter (6) with Tool (D). Torque for the adapter is 200 14 N m (150 10 lb ft).10. Install fuel injection line assembly (3) (finger tighten connections first). Install the O-ring seal and nut (2) to a torque of 30 7 N m (22 5 lb ft). Reconnect fuel line nut (1) to a torque of 40 7 N m (30 5 lb ft). Use Tool (A) to reconnect fuel line nut (4) to a torque of 40 7 N m (30 5 lb ft).End By:a. install valve cover
Have questions with 106673-7570?
Group cross 106673-7570 ZEXEL
Mitsubishi
Mitsubishi
Mitsubishi
106673-7570
9 400 617 348
ME158264
INJECTION-PUMP ASSEMBLY
6D22T
6D22T