106673-7260 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1066737260


 

Information injection-pump assembly

ZEXEL 106673-7260 1066737260
106673-7260 INJECTION-PUMP ASSEMBLY
Rating:
13
Buy INJECTION-PUMP ASSEMBLY 106673-7260 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

ZEXEL 106673-7260 1066737260


Zexel num
Bosch num
Firm num
Name
106673-7260 
 
   
INJECTION-PUMP ASSEMBLY

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   131424-4620
Overflow valve opening pressure kPa   255 221 289
Overflow valve opening pressure kgf/cm2   2.6 2.25 2.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-5-3-6- 2-4
Pre-stroke mm   4.8 4.75 4.85
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   9.8
Pump speed r/min   1100 1100 1100
Average injection quantity mm3/st.   138 135 141
Max. variation between cylinders %   0 -3 3
Basic   *
Fixing the lever   *
Boost pressure kPa   57.3 57.3
Boost pressure mmHg   430 430
Injection quantity adjustment_02
Adjusting point   B
Rack position   5.5+-0.5
Pump speed r/min   300 300 300
Average injection quantity mm3/st.   15.5 12.9 18.1
Max. variation between cylinders %   0 -15 15
Fixing the rack   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
Injection quantity adjustment_03
Adjusting point   D
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   135 115 155
Fixing the lever   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
Rack limit   *
Boost compensator adjustment
Pump speed r/min   600 600 600
Rack position   8.7
Boost pressure kPa   16 14.7 17.3
Boost pressure mmHg   120 110 130
Boost compensator adjustment_02
Pump speed r/min   600 600 600
Rack position   10.2
Boost pressure kPa   44 37.3 50.7
Boost pressure mmHg   330 280 380
Timer adjustment
Pump speed r/min   0
Advance angle deg.   2.5 2 3
Timer adjustment_02
Pump speed r/min   300
Advance angle deg.   2.5 2 3
Remarks
Start
 
Timer adjustment_03
Pump speed r/min   -
Advance angle deg.   0 0 0
Remarks
Measure the actual speed, stop
 

Test data Ex:

Governor adjustment

Test data 106673-7260
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Tolerance for racks not indicated: +-0.05mm. (3)RACK LIMIT (4)Boost compensator stroke (5)Rack difference between N = N1 and N = N2 (6)Set idle sub-spring
----------
K=13 N1=1100r/min N2=600r/min
----------

Speed control lever angle

Test data 106673-7260
F:Full speed I:Idle (1)Stopper bolt setting
----------

----------
a=25deg+-5deg b=6deg+-5deg

Stop lever angle

Test data 106673-7260
N:Pump normal S:Stop the pump. (1)Pump speed aa and rack position bb (to be sealed at delivery) (2)Stopper bolt setting
----------
aa=0r/min bb=1-0.2mm
----------
a=35deg+-5deg b=70deg+-5deg

Timing setting

Test data 106673-7260
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=12deg
----------
a=(6deg)




Information:


Use tool (E) in order to cut off the part of rivet (1) that has been peened. Remove rivet (1) from fuel injection control linkage (4) .
Illustration 13 g00702186
The 180-7951 Bushing Assembly Kit (F) Rack Control Shaft (G) Governor Link (4) Fuel Injection Control Linkage (7) 180-7952 Lever Bushing (8) 8L-5832 Hex Nut (9) 9X-8907 Hexagon Button Screw
Use the 180-7951 Bushing Assembly Kit in order to modify the linkage. Insert 9X-8907 Hexagon Button Screw (9) from the 180-7951 Bushing Assembly Kit into fuel injection control linkage (4). Refer to Illustration 13.
Apply 169-5464 Quick Cure Primer apply on the threads of 9X-8907 Hexagon Button Screw (9) and 8L-5832 Hex Nut (8). Allow the primer to dry. The Quick Cure Primer counteracts the effects of the Volatile Corrosion Inhibitor (VCI) paper that was used to package the parts.
Assemble 180-7952 Lever Bushing (7) on 9X-8907 Hexagon Button Screw (9). Refer to Illustration 13.
Apply the 154-9731 Thread Lock Compound on the threads of 9X-8907 Hexagon Button Screw (9) and 8L-5832 Hex Nut (8) .
Illustration 14 g00655322
Place 8L-5832 Hex Nut (8) on 9X-8907 Hexagon Button Screw (9). Tighten 8L-5832 Hex Nut (8) until hex nut (8) is snug. Tighten 8L-5832 Hex Nut (8) for an additional 180 degrees.
Do not let metal chips or pieces of the rivet fall into the engine.
Illustration 15 g00655325
Clean the fuel injection control linkage and clean the surfaces of the cylinder head that are adjacent to the fuel injection control linkage with shop solvent. Remove the towels and remove all debris very carefully.
Install the 180-7956 Clamp Assembly Kit . Refer to the "Installation Of The 180-7956 Clamp Assembly Kit " section of this publication.Installation Of The 180-7956 Clamp Assembly Kit
Note: The 180-7956 Clamp Assembly Kit is used for the former control linkages only.Note: If the 180-7956 Clamp Assembly Kit is installed, refer to ""Modification of the 128-9640 Injector Synchronization Fixture "".The 180-7956 Clamp Assembly Kit may be installed on the fuel injection control linkage. The 180-7956 Clamp Assembly Kit will increase the strength of the joint.
Illustration 16 g00655326
Install 183-9390 Spacer (10) on fuel injection control linkage (4). Refer to Illustration 16.
Apply 169-5464 Quick Cure Primer to the threaded hole in the 180-7954 Clamp (11). Apply 169-5464 Quick Cure Primer to the threads of screw (13). Allow the primer to dry. The Quick Cure Primer counteracts the effects of the Volatile Corrosion Inhibitor (VCI) paper that was used to package the parts.
Apply 154-9731 Thread Lock Compound to the threaded hole in the 180-7954 Clamp (11). Apply 154-9731 Thread Lock Compound to the threads of screw (13) of clamp assembly. Loosely assemble 180-7954 Clamp (11) and 180-7987 Clamp (12) on fuel injection control linkage (4). Refer to Illustration 16. Be sure that the rivet head or bushing (14) is fully engaged into the counterbore of the

Have questions with 106673-7260?





Group cross 106673-7260 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 617 331 
ME151686 
INJECTION-PUMP ASSEMBLY
6D24T1
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 610 924 
ME151687 
INJECTION-PUMP ASSEMBLY
6D24T2
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 610 925 
ME158092 
INJECTION-PUMP ASSEMBLY
6D24T
9 400 617 332 
ME158088 
INJECTION-PUMP ASSEMBLY
6D24-TC
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 610 926 
ME158106 
INJECTION-PUMP ASSEMBLY
6D24T
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 617 333 
ME158133 
INJECTION-PUMP ASSEMBLY
6D24-T
106673-7260  
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 617 334 
ME158137 
INJECTION-PUMP ASSEMBLY
6D24T
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 610 927 
ME158152 
INJECTION-PUMP ASSEMBLY
6D24TC
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 610 928 
ME151875 
INJECTION-PUMP ASSEMBLY
6D22T2
9 400 617 335 
ME158075 
INJECTION-PUMP ASSEMBLY
6D22T
Back to top