106673-7211 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1066737211


 

Information injection-pump assembly

ZEXEL 106673-7211 1066737211
106673-7211 INJECTION-PUMP ASSEMBLY
Rating:
24
Buy INJECTION-PUMP ASSEMBLY 106673-7211 zexel genuine, new aftermarket engine parts with delivery

Service parts 106673-7211 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106067-1280
3. GOVERNOR 105923-1652
4. SUPPLY PUMP 105237-4790
5. AUTOM. ADVANCE MECHANIS 105691-3802
6. COUPLING PLATE 105663-0800
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105110-7371
11. Nozzle and Holder ME151161
12. Open Pre:MPa(Kqf/cm2) 15.7{160}/21.6{220}
13. NOZZLE-HOLDER 105041-4111
14. NOZZLE
15. NOZZLE SET 105019-0330

Include in #1:

106673-7211 as INJECTION-PUMP ASSEMBLY

Cross reference number

ZEXEL 106673-7211 1066737211


Zexel num
Bosch num
Firm num
Name
106673-7211 
 
   
INJECTION-PUMP ASSEMBLY

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8250
Bosch type code   1 688 901 101
Nozzle   105780-0120
Bosch type code   1 688 901 990
Nozzle holder   105780-2190
Opening pressure MPa   20.7
Opening pressure kgf/cm2   211
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   131425-0220
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   255 255 255
Tester oil delivery pressure kgf/cm2   2.6 2.6 2.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-5-3-6- 2-4
Pre-stroke mm   3.9 3.85 3.95
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   -
Rack position   13.4
Pump speed r/min   700 700 700
Each cylinder's injection qty mm3/st.   172.5 168.2 176.8
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   Z
Rack position   8+-0.5
Pump speed r/min   410 410 410
Each cylinder's injection qty mm3/st.   26 22.1 29.9
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(13.4)
Pump speed r/min   700 700 700
Average injection quantity mm3/st.   172.5 171.5 173.5
Basic   *
Fixing the lever   *
Boost pressure kPa   29.3 29.3
Boost pressure mmHg   220 220
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1+0.9
Pump speed r/min   1100 1100 1100
Average injection quantity mm3/st.   161.5 157.5 165.5
Fixing the lever   *
Boost pressure kPa   29.3 29.3
Boost pressure mmHg   220 220
Injection quantity adjustment_05
Adjusting point   C
Rack position   (R1-0.85 )
Pump speed r/min   500 500 500
Average injection quantity mm3/st.   172.5 166.5 178.5
Fixing the lever   *
Boost pressure kPa   29.3 29.3
Boost pressure mmHg   220 220
Boost compensator adjustment
Pump speed r/min   250 250 250
Rack position   R2-1.6
Boost pressure kPa   6.7 5.4 8
Boost pressure mmHg   50 40 60
Boost compensator adjustment_02
Pump speed r/min   250 250 250
Rack position   R2(R1-1. 75)
Boost pressure kPa   16 16 16
Boost pressure mmHg   120 120 120

Test data Ex:

Governor adjustment

Test data 106673-7211
N:Pump speed R:Rack position (mm) (1)Torque cam stamping: T1 (2)Tolerance for racks not indicated: +-0.05mm. (3)Boost compensator stroke: BCL (4)Damper spring setting
----------
T1=AE17 BCL=1.6+-0.1mm
----------

Timer adjustment

Test data 106673-7211
(1)Adjusting range (2)Step response time (N): Speed of the pump (L): Load (theta) Advance angle (Srd1) Step response time 1 (Srd2) Step response time 2 1. Adjusting conditions for the variable timer (1)Adjust the clearance between the pickup and the protrusion to L.
----------
L=1-0.2(mm) N2=800r/min C2=(10)deg t1=2.5--sec. t2=2.5--sec.
----------
N1=750++r/min P1=0kPa(0kgf/cm2) P2=392kPa(4kgf/cm2) C1=10+-0.3deg R01=0/4load R02=4/4load

Speed control lever angle

Test data 106673-7211
F:Full speed I:Idle (1)Use the hole at R = aa (2)Stopper bolt set position 'H' (3)Viewed from feed pump side.
----------
aa=37.5mm
----------
a=2deg+-5deg b=39.5deg+-3deg

Stop lever angle

Test data 106673-7211
N:Pump normal S:Stop the pump. (1)At pump speed aa and rack position bb, set the stopper bolt. (Confirm non-injection.) (2)Normal engine position (equivalent to R = cc). (3)Use the hole above R = dd
----------
aa=1100r/min bb=3.5+-0.3mm cc=18mm dd=54mm
----------
a=40deg+-5deg b=29.5deg+-5deg c=(20.5deg)

0000001501 RACK SENSOR

Test data 106673-7211
(VR) measurement voltage (I) Part number of the control unit (G) Apply red paint. (H): End surface of the pump 1. Rack sensor adjustment (-0620) (1)Fix the speed control lever at the full position (2)Set the speed to N1 r/min. (If the boost compensator is provided, apply boost pressure.) (3)Adjust the bobbin (A) so that the rack sensor's output voltage is VR+-0.01. (4)At that time, rack position must be Ra. (5)Apply G at two places. Connecting part between the joint (B) and the nut (F) Connecting part between the joint (B) and the end surface of the pump (H)
----------
N1=1100r/min Ra=R1+0.9mm
----------

Timing setting

Test data 106673-7211
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=5deg
----------
a=(2deg)




Information:

Start By:a. remove rocker shaft assembliesb. remove turbochargers1. Remove the valve cover bases from the cylinder head. 2. Remove sensor (7) from cylinder head (8). If necessary, remove the O-ring seal from sensor (7).3. Remove bolt and locknut (5).4. Disconnect connector (6).5. Remove bolt (4) and sensor (3). If necessary, remove the O-ring seal from sensor (3).6. Remove three bolts (2) and water lines group (1). 7. Remove bolt (9) from timing advance housing.8. Remove bolt (10) and support (11). 9. Remove the bolt and support (12). Remove the remaining ten bolts and the supports along the intake side of the cylinder head.10. Disconnect hose clamp (13) from the exhaust manifold. 11. Attach Tool (A) and fasten a hoist.12. Remove bolts (14) and remove the cylinder head. The weight of the cylinder head is approximately 172 kg (380 lb).13. Remove the head gasket and the water seals.
Do not put the cylinder head down on a flat surface. Direct injection nozzles extend out from the bottom surface of the cylinder head and will be damaged by the weight of the head.
Install Cylinder Head
1. Thoroughly clean the bottom surface of the cylinder head. Install a new head gasket and water seals. Do not use any adhesives. A new spacer plate gasket must be used when the cylinder head is installed. See the topic "Remove & Install Spacer Plate" in this module. 2. Attach Tool (D) and fasten a hoist.3. Install the cylinder head to the block. The weight of the cylinder head is approximately 172 kg (380 lb).
(1) Large bolts (3/4 inch). Put 6V-4876 Molycoat Paste Lubricant on bolt threads and between washer and underside of bolt heads. (2) Small bolts (3/8 inch). See Step 4h.4. Use the tightening sequence below to tighten the bolts that hold the cylinder head in position. a. Tighten bolts 1 through 14 in number sequence to 270 25 N m (200 20 lb ft).b. Tighten bolts 1 through 14 in number sequence to 470 20 N m (345 15 lb ft).c. Tighten bolts 1 through 14 in number sequence to 470 20 N m (345 15 lb ft).d. Install the rocker arm shafts for the engine valves and the remaining (3/4 in) bolts.e. Tighten bolts 15 through 26 in number sequence to 270 25 N m (200 20 lb ft).f. Tighten bolts 15 through 26 in number sequence to 450 20 N m (330 15 lb ft).g. Tighten bolts 15 through 26 in number sequence to 450 20 N m (330 15 lb ft).h. Tighten the thirteen small bolts (2) to a torque of 45 7 N m (33 5 lb ft). 5. Install support (12).6. Connect hose clamp (13) to exhaust manifold. 7. Install bolt (10) and support (11). Install the remaining ten bolts and the supports along the intake side of the cylinder head. Torque all twelve bolts (10) to 43 7 N m (32 5

Have questions with 106673-7211?





Group cross 106673-7211 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 617 331 
ME151686 
INJECTION-PUMP ASSEMBLY
6D24T1
 
 
INJECTION-PUMP ASSEMBLY
106673-7211  
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 610 924 
ME151687 
INJECTION-PUMP ASSEMBLY
6D24T2
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 610 925 
ME158092 
INJECTION-PUMP ASSEMBLY
6D24T
9 400 617 332 
ME158088 
INJECTION-PUMP ASSEMBLY
6D24-TC
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 610 926 
ME158106 
INJECTION-PUMP ASSEMBLY
6D24T
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 617 333 
ME158133 
INJECTION-PUMP ASSEMBLY
6D24-T
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 617 334 
ME158137 
INJECTION-PUMP ASSEMBLY
6D24T
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 610 927 
ME158152 
INJECTION-PUMP ASSEMBLY
6D24TC
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 610 928 
ME151875 
INJECTION-PUMP ASSEMBLY
6D22T2
9 400 617 335 
ME158075 
INJECTION-PUMP ASSEMBLY
6D22T
Back to top