106673-7201 ZEXEL 9 400 617 331 BOSCH INJECTION-PUMP ASSEMBLY 9400617331 1066737201 me151686


 

Information injection-pump assembly

BOSCH 9 400 617 331 9400617331
ZEXEL 106673-7201 1066737201
MITSUBISHI ME151686 me151686
106673-7201 INJECTION-PUMP ASSEMBLY
Rating:
22
Buy INJECTION-PUMP ASSEMBLY 106673-7201 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

BOSCH 9 400 617 331 9400617331
ZEXEL 106673-7201 1066737201
MITSUBISHI ME151686 me151686


Zexel num
Bosch num
Firm num
Name
106673-7201 
9 400 617 331 
ME151686  MITSUBISHI
INJECTION-PUMP ASSEMBLY
6D24T1 K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8250
Bosch type code   1 688 901 101
Nozzle   105780-0120
Bosch type code   1 688 901 990
Nozzle holder   105780-2190
Opening pressure MPa   20.7
Opening pressure kgf/cm2   211
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   131425-0220
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   255 255 255
Tester oil delivery pressure kgf/cm2   2.6 2.6 2.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-5-3-6- 2-4
Pre-stroke mm   3.9 3.85 3.95
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.5 60.5
Difference between angles 2
Cal 1-3
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cyl.1-2
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-4
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   -
Rack position   12.9
Pump speed r/min   700 700 700
Each cylinder's injection qty mm3/st.   152.5 148.7 156.3
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   Z
Rack position   8+-0.5
Pump speed r/min   410 410 410
Each cylinder's injection qty mm3/st.   21 17.8 24.2
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(12.9)
Pump speed r/min   700 700 700
Average injection quantity mm3/st.   152.5 151.5 153.5
Basic   *
Fixing the lever   *
Boost pressure kPa   24 24
Boost pressure mmHg   180 180
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1+0.95
Pump speed r/min   1100 1100 1100
Average injection quantity mm3/st.   143 139 147
Fixing the lever   *
Boost pressure kPa   24 24
Boost pressure mmHg   180 180
Injection quantity adjustment_05
Adjusting point   C
Rack position   (R1-0.7)
Pump speed r/min   500 500 500
Average injection quantity mm3/st.   149.5 143.5 155.5
Fixing the lever   *
Boost pressure kPa   24 24
Boost pressure mmHg   180 180
Injection quantity adjustment_06
Adjusting point   D
Rack position   (R2-1.5)
Pump speed r/min   300 300 300
Average injection quantity mm3/st.   103 101 105
Fixing the lever   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
Boost compensator adjustment
Pump speed r/min   300 300 300
Rack position   (R2-1.5)
Boost pressure kPa   4 2.7 5.3
Boost pressure mmHg   30 20 40
Boost compensator adjustment_02
Pump speed r/min   300 300 300
Rack position   R2(R1-1)
Boost pressure kPa   10.7 10.7 10.7
Boost pressure mmHg   80 80 80

Test data Ex:

Governor adjustment

Test data 106673-7201
N:Pump speed R:Rack position (mm) (1)Torque cam stamping: T1 (2)Tolerance for racks not indicated: +-0.05mm. (3)Boost compensator stroke: BCL (4)Damper spring setting
----------
T1=AE93 BCL=(1.5)+-0.1mm
----------

Timer adjustment

Test data 106673-7201
(1)Adjusting range (2)Step response time (N): Speed of the pump (L): Load (theta) Advance angle (Srd1) Step response time 1 (Srd2) Step response time 2 1. Adjusting conditions for the variable timer (1)Adjust the clearance between the pickup and the protrusion to L.
----------
L=1-0.2(mm) N2=800r/min C2=(10)deg t1=2.5--sec. t2=2.5--sec.
----------
N1=750++r/min P1=0kPa(0kgf/cm2) P2=392kPa(4kgf/cm2) C1=10+-0.3deg R01=0/4load R02=4/4load

Speed control lever angle

Test data 106673-7201
F:Full speed I:Idle (1)Use the hole at R = aa (2)Stopper bolt set position 'H' (3)Viewed from feed pump side.
----------
aa=37.5mm
----------
a=1deg+-5deg b=(42deg)+-3deg

Stop lever angle

Test data 106673-7201
N:Pump normal S:Stop the pump. (1)At pump speed aa and rack position bb, set the stopper bolt. (Confirm non-injection.) (2)Normal engine position (equivalent to R = cc). (3)Use the hole above R = dd
----------
aa=1100r/min bb=3.5+-0.3mm cc=18mm dd=54mm
----------
a=40deg+-5deg b=29.5deg+-5deg c=(20.5deg)

0000001501 RACK SENSOR

Test data 106673-7201
(VR) measurement voltage (I) Part number of the control unit (G) Apply red paint. (H): End surface of the pump 1. Rack sensor adjustment (-0620) (1)Fix the speed control lever at the full position (2)Set the speed to N1 r/min. (If the boost compensator is provided, apply boost pressure.) (3)Adjust the bobbin (A) so that the rack sensor's output voltage is VR+-0.01. (4)At that time, rack position must be Ra. (5)Apply G at two places. Connecting part between the joint (B) and the nut (F) Connecting part between the joint (B) and the end surface of the pump (H)
----------
N1=1100r/min Ra=R1+0.95mm
----------

Timing setting

Test data 106673-7201
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=5deg
----------
a=(2deg)




Information:

1. Remove turbocharger return oil line (1).2. Remove two shields (2) from exhaust manifold (3). 3. Remove clamp (4).4. Remove nuts, spacers and brackets (5).5. Remove exhaust manifold (3).6. Remove the gaskets from the exhaust manifold or studs. 7. Separate section (6), sections (7) and section (8).Install Exhaust Manifold
Make sure the 2P-2333 Manifold Sealer does not get on the inside of each manifold. Damage to the turbocharger could be the result if the manifold sealer gets on the impeller on the turbocharger.
1. Apply a thin coat of 2P-2333 Manifold Sealer to the O.D. of male end of the manifold sections (7) and section (8). Coat the female ends of the manifold with clean engine oil.2. Connect sections (6), sections (7) and section (8). 3. Install 5P-3931 Anti-Seize Compound on the threads of studs (9).4. Install the gaskets on the studs. 5. Install exhaust manifold (3).6. Install nuts, spacers and brackets (5). Tighten the nuts to a torque of 38 5 N m (28 4 lb ft).7. Install clamp (4). 8. Install two shields (2) to exhaust manifold (3).9. Using a new O-ring seal at the bottom and a new gasket at the top, install turbocharger return oil line (1).

Have questions with 106673-7201?





Group cross 106673-7201 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

106673-7201  
9 400 617 331 
ME151686 
INJECTION-PUMP ASSEMBLY
6D24T1
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 610 924 
ME151687 
INJECTION-PUMP ASSEMBLY
6D24T2
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 610 925 
ME158092 
INJECTION-PUMP ASSEMBLY
6D24T
9 400 617 332 
ME158088 
INJECTION-PUMP ASSEMBLY
6D24-TC
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 610 926 
ME158106 
INJECTION-PUMP ASSEMBLY
6D24T
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 617 333 
ME158133 
INJECTION-PUMP ASSEMBLY
6D24-T
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 617 334 
ME158137 
INJECTION-PUMP ASSEMBLY
6D24T
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 610 927 
ME158152 
INJECTION-PUMP ASSEMBLY
6D24TC
 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Mitsubishi 

9 400 610 928 
ME151875 
INJECTION-PUMP ASSEMBLY
6D22T2
9 400 617 335 
ME158075 
INJECTION-PUMP ASSEMBLY
6D22T
Back to top