Information injection-pump assembly
BOSCH
9 400 611 459
9400611459
ZEXEL
106673-7100
1066737100
MITSUBISHI
ME158037
me158037

Rating:
Service parts 106673-7100 INJECTION-PUMP ASSEMBLY:
1.
_
7.
COUPLING PLATE
8.
_
9.
_
11.
Nozzle and Holder
ME059621
12.
Open Pre:MPa(Kqf/cm2)
21.6{220}
15.
NOZZLE SET
Include in #1:
106673-7100
as INJECTION-PUMP ASSEMBLY
Cross reference number
BOSCH
9 400 611 459
9400611459
ZEXEL
106673-7100
1066737100
MITSUBISHI
ME158037
me158037
Zexel num
Bosch num
Firm num
Name
106673-7100
9 400 611 459
ME158037 MITSUBISHI
INJECTION-PUMP ASSEMBLY
6D22T K
6D22T K
Calibration Data:
Adjustment conditions
Test oil
1404 Test oil ISO4113 or {SAEJ967d}
1404 Test oil ISO4113 or {SAEJ967d}
Test oil temperature
degC
40
40
45
Nozzle and nozzle holder
105780-8140
Bosch type code
EF8511/9A
Nozzle
105780-0000
Bosch type code
DN12SD12T
Nozzle holder
105780-2080
Bosch type code
EF8511/9
Opening pressure
MPa
17.2
Opening pressure
kgf/cm2
175
Injection pipe
Outer diameter - inner diameter - length (mm) mm 8-3-600
Outer diameter - inner diameter - length (mm) mm 8-3-600
Overflow valve
131424-4620
Overflow valve opening pressure
kPa
255
221
289
Overflow valve opening pressure
kgf/cm2
2.6
2.25
2.95
Tester oil delivery pressure
kPa
157
157
157
Tester oil delivery pressure
kgf/cm2
1.6
1.6
1.6
Direction of rotation (viewed from drive side)
Right R
Right R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right R
Right R
Injection order
1-5-3-6-
2-4
Pre-stroke
mm
4.8
4.75
4.85
Beginning of injection position
Governor side NO.1
Governor side NO.1
Difference between angles 1
Cal 1-5 deg. 60 59.5 60.5
Cal 1-5 deg. 60 59.5 60.5
Difference between angles 2
Cal 1-3 deg. 120 119.5 120.5
Cal 1-3 deg. 120 119.5 120.5
Difference between angles 3
Cal 1-6 deg. 180 179.5 180.5
Cal 1-6 deg. 180 179.5 180.5
Difference between angles 4
Cyl.1-2 deg. 240 239.5 240.5
Cyl.1-2 deg. 240 239.5 240.5
Difference between angles 5
Cal 1-4 deg. 300 299.5 300.5
Cal 1-4 deg. 300 299.5 300.5
Injection quantity adjustment
Adjusting point
A
Rack position
12
Pump speed
r/min
1050
1050
1050
Average injection quantity
mm3/st.
137.2
134.2
140.2
Max. variation between cylinders
%
0
-3
3
Basic
*
Fixing the lever
*
Injection quantity adjustment_02
Adjusting point
-
Rack position
5.7+-0.5
Pump speed
r/min
500
500
500
Average injection quantity
mm3/st.
15
12.4
17.6
Max. variation between cylinders
%
0
-15
15
Fixing the rack
*
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
Adjust only variation between cylinders; adjust governor according to governor specifications.
Injection quantity adjustment_03
Adjusting point
C
Rack position
13.9+-0.
5
Pump speed
r/min
100
100
100
Average injection quantity
mm3/st.
133
113
153
Fixing the lever
*
Rack limit
*
Injection quantity adjustment_04
Adjusting point
D
Rack position
6.5+-0.5
Pump speed
r/min
275
275
275
Average injection quantity
mm3/st.
15
12.4
17.6
Fixing the rack
*
Remarks
(check)
(check)
Timer adjustment
Pump speed
r/min
(1100)
Advance angle
deg.
0.5
Timer adjustment_02
Pump speed
r/min
-
Advance angle
deg.
2
2
2
Remarks
Measure the actual speed, stop
Measure the actual speed, stop
Test data Ex:
Governor adjustment

N:Pump speed
R:Rack position (mm)
(1)Target notch: K
(2)Tolerance for racks not indicated: +-0.05mm.
(3)Torque spring does not operate.
(4)RACK LIMIT
(5)Main spring setting
(6)Set idle sub-spring
(7)Set at delivery
----------
K=10
----------
----------
K=10
----------
Speed control lever angle

F:Full speed
I:Idle
(1)Stopper bolt setting
(2)At delivery
(3)Set the pump speed at aa
(4)Set the pump speed at bb.
----------
aa=1105r/min bb=905r/min
----------
a=30deg+-5deg b=(2deg) c=10deg+-5deg d=7deg+-5deg
----------
aa=1105r/min bb=905r/min
----------
a=30deg+-5deg b=(2deg) c=10deg+-5deg d=7deg+-5deg
Stop lever angle

N:Pump normal
S:Stop the pump.
----------
----------
a=19deg+-5deg b=53deg+-5deg
----------
----------
a=19deg+-5deg b=53deg+-5deg
Timing setting

(1)Pump vertical direction
(2)Coupling's key groove position at No 1 cylinder's beginning of injection
(3)-
(4)-
----------
----------
a=(7deg)
----------
----------
a=(7deg)
Information:
Start By:a. remove automatic timing advanceb. remove oil panc. remove water pumpd. remove crankshaft front seal and wear sleeve 1. Disconnect clip (1) for the wiring harness.2. Remove connector (2) from the clip. 3. Fasten Tooling (A) and a hoist to the timing gear cover. The weight of the timing gear cover is 18 kg (40 lb).4. Use Tooling (B) to remove studs (3).5. Move fuel overflow tube (4) out of the way.6. Remove cover (5) and the gasket.7. Disconnect all wiring harness clips from the timing gear housing, and move the wiring harness out of the way.8. Remove the bolts that hold the timing gear cover to the cylinder block, and remove the timing gear cover.9. Remove the gasket for the timing gear cover.10. Thoroughly clean the gasket surface of the cylinder block and the timing gear cover. Be careful not to scratch or mar the gasket surface of the aluminum timing gear cover.Install Timing Gear Cover
1. Install new O-ring seal (1) on the fuel injection pump housing. Put clean engine oil on the O-ring seal.2. Put new gasket (2) in position on the cylinder block. Engage the gasket with the two dowels. Use clean 2S-3230 Bearing Lubricant to hold the gasket in place on the cylinder block. 3. Put the timing gear cover in position on the dowels. Install the bolts that hold the timing gear cover to the cylinder block.4. Install cover (6), and a new gasket.5. Connect the wiring harness clips to the timing gear housing.6. Connect the clip that holds fuel overflow tube (5).7. Use Tooling (B) to install studs (3).8. Remove Tooling (A).9. Put 5P-3413 Pipe Sealant with "Teflon" on the threads of stud (4). Use Tool (B) to install stud (4) to a height of 28.96 mm (1.140 in).10. Install the clip that holds the wiring harness.11. Install the connector in the clip.12. Trim gasket (2) even with the oil pan surface of the cylinder block and timing gear cover.End By:a. install crankshaft front seal and wear sleeveb. install water pumpc. install oil pand. install automatic timing advance
1. Install new O-ring seal (1) on the fuel injection pump housing. Put clean engine oil on the O-ring seal.2. Put new gasket (2) in position on the cylinder block. Engage the gasket with the two dowels. Use clean 2S-3230 Bearing Lubricant to hold the gasket in place on the cylinder block. 3. Put the timing gear cover in position on the dowels. Install the bolts that hold the timing gear cover to the cylinder block.4. Install cover (6), and a new gasket.5. Connect the wiring harness clips to the timing gear housing.6. Connect the clip that holds fuel overflow tube (5).7. Use Tooling (B) to install studs (3).8. Remove Tooling (A).9. Put 5P-3413 Pipe Sealant with "Teflon" on the threads of stud (4). Use Tool (B) to install stud (4) to a height of 28.96 mm (1.140 in).10. Install the clip that holds the wiring harness.11. Install the connector in the clip.12. Trim gasket (2) even with the oil pan surface of the cylinder block and timing gear cover.End By:a. install crankshaft front seal and wear sleeveb. install water pumpc. install oil pand. install automatic timing advance
Have questions with 106673-7100?
Group cross 106673-7100 ZEXEL
Mitsubishi
106673-7100
9 400 611 459
ME158037
INJECTION-PUMP ASSEMBLY
6D22T
6D22T