Information injection-pump assembly
BOSCH
9 400 612 277
9400612277
ZEXEL
106673-5010
1066735010
NISSAN-DIESEL
1679096613
1679096613

Rating:
Service parts 106673-5010 INJECTION-PUMP ASSEMBLY:
1.
_
7.
COUPLING PLATE
8.
_
9.
_
11.
Nozzle and Holder
16600-96514
12.
Open Pre:MPa(Kqf/cm2)
17.7{180}/22.6{230}
15.
NOZZLE SET
Include in #1:
106673-5010
as INJECTION-PUMP ASSEMBLY
Cross reference number
BOSCH
9 400 612 277
9400612277
ZEXEL
106673-5010
1066735010
NISSAN-DIESEL
1679096613
1679096613
Zexel num
Bosch num
Firm num
Name
9 400 612 277
1679096613 NISSAN-DIESEL
INJECTION-PUMP ASSEMBLY
PE6T44 * K 14CA INJECTION PUMP ASSY PE6P,6PD PE
PE6T44 * K 14CA INJECTION PUMP ASSY PE6P,6PD PE
Calibration Data:
Adjustment conditions
Test oil
1404 Test oil ISO4113 or {SAEJ967d}
1404 Test oil ISO4113 or {SAEJ967d}
Test oil temperature
degC
40
40
45
Nozzle and nozzle holder
105780-8140
Bosch type code
EF8511/9A
Nozzle
105780-0000
Bosch type code
DN12SD12T
Nozzle holder
105780-2080
Bosch type code
EF8511/9
Opening pressure
MPa
17.2
Opening pressure
kgf/cm2
175
Injection pipe
Outer diameter - inner diameter - length (mm) mm 8-3-600
Outer diameter - inner diameter - length (mm) mm 8-3-600
Overflow valve
132424-0620
Overflow valve opening pressure
kPa
157
123
191
Overflow valve opening pressure
kgf/cm2
1.6
1.25
1.95
Tester oil delivery pressure
kPa
157
157
157
Tester oil delivery pressure
kgf/cm2
1.6
1.6
1.6
Direction of rotation (viewed from drive side)
Right R
Right R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right R
Right R
Injection order
1-4-2-6-
3-5
Pre-stroke
mm
3.65
3.6
3.7
Beginning of injection position
Drive side NO.1
Drive side NO.1
Difference between angles 1
Cal 1-4 deg. 60 59.5 60.5
Cal 1-4 deg. 60 59.5 60.5
Difference between angles 2
Cyl.1-2 deg. 120 119.5 120.5
Cyl.1-2 deg. 120 119.5 120.5
Difference between angles 3
Cal 1-6 deg. 180 179.5 180.5
Cal 1-6 deg. 180 179.5 180.5
Difference between angles 4
Cal 1-3 deg. 240 239.5 240.5
Cal 1-3 deg. 240 239.5 240.5
Difference between angles 5
Cal 1-5 deg. 300 299.5 300.5
Cal 1-5 deg. 300 299.5 300.5
Injection quantity adjustment
Adjusting point
A
Rack position
10
Pump speed
r/min
650
650
650
Average injection quantity
mm3/st.
156.5
154.5
158.5
Max. variation between cylinders
%
0
-4
4
Basic
*
Fixing the lever
*
Boost pressure
kPa
133
133
Boost pressure
mmHg
1000
1000
Injection quantity adjustment_02
Adjusting point
C
Rack position
9.5
Pump speed
r/min
300
300
300
Average injection quantity
mm3/st.
130
124
136
Max. variation between cylinders
%
0
-4
4
Fixing the lever
*
Boost pressure
kPa
0
0
0
Boost pressure
mmHg
0
0
0
Injection quantity adjustment_03
Adjusting point
D
Rack position
5.5+-0.5
Pump speed
r/min
420
420
420
Average injection quantity
mm3/st.
12.5
11.5
13.5
Max. variation between cylinders
%
0
-10
10
Fixing the rack
*
Boost pressure
kPa
0
0
0
Boost pressure
mmHg
0
0
0
Boost compensator adjustment
Pump speed
r/min
300
300
300
Rack position
9.5
Boost pressure
kPa
10
4.7
15.3
Boost pressure
mmHg
75
35
115
Boost compensator adjustment_02
Pump speed
r/min
300
300
300
Rack position
10.2
Boost pressure
kPa
50
47.3
52.7
Boost pressure
mmHg
375
355
395
Boost compensator adjustment_03
Pump speed
r/min
300
300
300
Rack position
(11.3)
Boost pressure
kPa
120
120
120
Boost pressure
mmHg
900
900
900
Timer adjustment
Pump speed
r/min
750+80
Advance angle
deg.
0
0
0
Remarks
Start
Start
Timer adjustment_02
Pump speed
r/min
1100
Advance angle
deg.
1.5
1
2
Remarks
Finish
Finish
Test data Ex:
Governor adjustment

N:Pump speed
R:Rack position (mm)
(1)Target notch: K
(2)Tolerance for racks not indicated: +-0.05mm.
(3)Boost compensator stroke: BCL
(4)Boost compensator excessive fuel lever at operation: L1 (at 0 boost pressure)
(5)Set idle sub-spring
(6)Main spring setting
----------
K=14 BCL=(1.8)mm L1=10.9+-0.1mm
----------
----------
K=14 BCL=(1.8)mm L1=10.9+-0.1mm
----------
Speed control lever angle

F:Full speed
I:Idle
(1)Stopper bolt setting
----------
----------
a=6deg+-5deg b=17deg+-5deg
----------
----------
a=6deg+-5deg b=17deg+-5deg
Stop lever angle

N:Pump normal
S:Stop the pump.
(1)Normal
----------
----------
a=26.5deg+-5deg b=53deg+-5deg
----------
----------
a=26.5deg+-5deg b=53deg+-5deg
0000001101

N:Normal
B:When boosted
(1)Rack position = aa at boost pressure = 0.
----------
aa=10.9+-0.1mm
----------
a=(10deg) b=(18deg)
----------
aa=10.9+-0.1mm
----------
a=(10deg) b=(18deg)
0000001501 GOV FULL LOAD ADJUSTMENT

Title1:Full load stopper adjustment
Title2:Governor set speed
LABEL1:Distinguishing
LABEL2:Pump speed (r/min)
LABEL3:Ave. injection quantity (mm3/st)
LABEL4:Max. var. bet. cyl.
LABEL5:Remarks
LABEL6:Distinguishing
LABEL7:Governor set speed (r/min)
LABEL8:Maximum no-load speed (r/min)
LABEL9:Remarks
(1)Adjustment conditions are the same as those for measuring injection quantity.
(2)At high idle rack position L
----------
L=6.7mm
----------
a1=A a2=B a3=C a4=- r1=650r/min r2=650r/min r3=650r/min r4=- Q1=156.5+-2mm3/st Q2=154.5+-2mm3/st Q3=128.5+-2mm3/st Q4=- c1=+-4% c2=+-4% c3=+-4% c4=- a5=22 a6=21 a7=20 a8=19 a9=18 a10=- a11=- a12=- a13=- a14=- a15=- r5=1100r/min r6=1050r/min r7=1000r/min r8=950r/min r9=900r/min r10=- r11=- r12=- r13=- r14=- r15=- R5=1180+-27r/min R6=1130+-26r/min R7=1075+-25r/min R8=1020+-23r/min R9=965+-22r/min R10=- R11=- R12=- R13=- R14=- R15=-
----------
L=6.7mm
----------
a1=A a2=B a3=C a4=- r1=650r/min r2=650r/min r3=650r/min r4=- Q1=156.5+-2mm3/st Q2=154.5+-2mm3/st Q3=128.5+-2mm3/st Q4=- c1=+-4% c2=+-4% c3=+-4% c4=- a5=22 a6=21 a7=20 a8=19 a9=18 a10=- a11=- a12=- a13=- a14=- a15=- r5=1100r/min r6=1050r/min r7=1000r/min r8=950r/min r9=900r/min r10=- r11=- r12=- r13=- r14=- r15=- R5=1180+-27r/min R6=1130+-26r/min R7=1075+-25r/min R8=1020+-23r/min R9=965+-22r/min R10=- R11=- R12=- R13=- R14=- R15=-
Timing setting

(1)Pump vertical direction
(2)Coupling's key groove position at No 1 cylinder's beginning of injection
(3)-
(4)-
----------
----------
a=(25deg)
----------
----------
a=(25deg)
Information:
Start By:a. remove fuel injection nozzlesb. remove cylinder head assembly and spacer plate 1. Put compression on valve spring (2) with Tool (A). Remove locks (1).2. Remove Tool (A), rotocoil, spring, valve stem oil shield and valve. Put identification marks on valves with respect to their location in the cylinder head. 3. Check the spring force with Tool (B). The spring force is 257 25 N (57.8 5.6 lb). The length of spring under test force is 44.86 mm (1.766 in). The free length after test is 52.07 mm (2.050 in).4. Do Steps 1 through 3 again for the remainder of the valves.Install Valves
1. Put clean engine oil on the valve stems. Install valve (3), oil shield (4), spring (2) and rotocoil (1) in the cylinder head. 2. Put Tool (A) in position on the valve spring. Install the locks with Tool (B).
Locks can be thrown from valve when the compressor is released if they are not in their correct position on valve stem. Personal injury can be the result if not carefully removed.
3. Remove Tool (A), and hit the top of valve with a plastic hammer to be sure the locks are in their correct position on valve.4. Do Steps 1 through 3 again for the remainder of the valves.End By:a. install cylinder head assembly and spacer plateb. install fuel injection nozzles
1. Put clean engine oil on the valve stems. Install valve (3), oil shield (4), spring (2) and rotocoil (1) in the cylinder head. 2. Put Tool (A) in position on the valve spring. Install the locks with Tool (B).
Locks can be thrown from valve when the compressor is released if they are not in their correct position on valve stem. Personal injury can be the result if not carefully removed.
3. Remove Tool (A), and hit the top of valve with a plastic hammer to be sure the locks are in their correct position on valve.4. Do Steps 1 through 3 again for the remainder of the valves.End By:a. install cylinder head assembly and spacer plateb. install fuel injection nozzles