Information injection-pump assembly
BOSCH
9 400 617 240
9400617240
ZEXEL
106673-2470
1066732470
MITSUBISHI
ME157368
me157368

Rating:
Service parts 106673-2470 INJECTION-PUMP ASSEMBLY:
1.
_
7.
COUPLING PLATE
8.
_
9.
_
11.
Nozzle and Holder
ME059621
12.
Open Pre:MPa(Kqf/cm2)
21.6{220}
15.
NOZZLE SET
Include in #1:
106673-2470
as INJECTION-PUMP ASSEMBLY
Cross reference number
BOSCH
9 400 617 240
9400617240
ZEXEL
106673-2470
1066732470
MITSUBISHI
ME157368
me157368
Zexel num
Bosch num
Firm num
Name
106673-2470
9 400 617 240
ME157368 MITSUBISHI
INJECTION-PUMP ASSEMBLY
6D22T * K
6D22T * K
Calibration Data:
Adjustment conditions
Test oil
1404 Test oil ISO4113 or {SAEJ967d}
1404 Test oil ISO4113 or {SAEJ967d}
Test oil temperature
degC
40
40
45
Nozzle and nozzle holder
105780-8140
Bosch type code
EF8511/9A
Nozzle
105780-0000
Bosch type code
DN12SD12T
Nozzle holder
105780-2080
Bosch type code
EF8511/9
Opening pressure
MPa
17.2
Opening pressure
kgf/cm2
175
Injection pipe
Outer diameter - inner diameter - length (mm) mm 8-3-600
Outer diameter - inner diameter - length (mm) mm 8-3-600
Overflow valve
131424-4620
Overflow valve opening pressure
kPa
255
221
289
Overflow valve opening pressure
kgf/cm2
2.6
2.25
2.95
Tester oil delivery pressure
kPa
157
157
157
Tester oil delivery pressure
kgf/cm2
1.6
1.6
1.6
Direction of rotation (viewed from drive side)
Right R
Right R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right R
Right R
Injection order
1-5-3-6-
2-4
Pre-stroke
mm
4.8
4.75
4.85
Beginning of injection position
Governor side NO.1
Governor side NO.1
Difference between angles 1
Cal 1-5 deg. 60 59.5 60.5
Cal 1-5 deg. 60 59.5 60.5
Difference between angles 2
Cal 1-3 deg. 120 119.5 120.5
Cal 1-3 deg. 120 119.5 120.5
Difference between angles 3
Cal 1-6 deg. 180 179.5 180.5
Cal 1-6 deg. 180 179.5 180.5
Difference between angles 4
Cyl.1-2 deg. 240 239.5 240.5
Cyl.1-2 deg. 240 239.5 240.5
Difference between angles 5
Cal 1-4 deg. 300 299.5 300.5
Cal 1-4 deg. 300 299.5 300.5
Injection quantity adjustment
Adjusting point
A
Rack position
11.7
Pump speed
r/min
1050
1050
1050
Average injection quantity
mm3/st.
130
127
133
Max. variation between cylinders
%
0
-3
3
Basic
*
Fixing the lever
*
Injection quantity adjustment_02
Adjusting point
-
Rack position
5.8+-0.5
Pump speed
r/min
500
500
500
Average injection quantity
mm3/st.
15
12.4
17.6
Max. variation between cylinders
%
0
-15
15
Fixing the rack
*
Remarks
Adjust only variation between cylinders; adjust governor according to governor specifications.
Adjust only variation between cylinders; adjust governor according to governor specifications.
Injection quantity adjustment_03
Adjusting point
C
Rack position
13.9+-0.
5
Pump speed
r/min
100
100
100
Average injection quantity
mm3/st.
133
113
153
Fixing the lever
*
Rack limit
*
Injection quantity adjustment_04
Adjusting point
D
Rack position
6
Pump speed
r/min
260
260
260
Average injection quantity
mm3/st.
10.6
5.4
15.8
Fixing the rack
*
Remarks
(check)
(check)
Timer adjustment
Pump speed
r/min
950--
Advance angle
deg.
0
0
0
Remarks
Start
Start
Timer adjustment_02
Pump speed
r/min
900
Advance angle
deg.
0.5
Timer adjustment_03
Pump speed
r/min
1100
Advance angle
deg.
1
0.5
1.5
Remarks
Finish
Finish
Test data Ex:
Governor adjustment

N:Pump speed
R:Rack position (mm)
(1)Target notch: K
(2)Torque spring does not operate.
(3)RACK LIMIT
(4)Main spring setting
(5)Set idle sub-spring
(6)Set at delivery
(7)Rack difference between N = N1 and N = N2
----------
K=6 N1=1050r/min N2=600r/min
----------
----------
K=6 N1=1050r/min N2=600r/min
----------
Speed control lever angle

F:Full speed
I:Idle
(1)Stopper bolt setting
(2)At delivery
(3)Pump speed = aa
(4)Pump speed = bb
----------
aa=1100r/min bb=950r/min
----------
a=31deg+-5deg b=(2deg) c=7deg+-5deg d=5deg+-5deg
----------
aa=1100r/min bb=950r/min
----------
a=31deg+-5deg b=(2deg) c=7deg+-5deg d=5deg+-5deg
Stop lever angle

N:Pump normal
S:Stop the pump.
----------
----------
a=36.5deg+-5deg b=53deg+-5deg
----------
----------
a=36.5deg+-5deg b=53deg+-5deg
Timing setting

(1)Pump vertical direction
(2)Coupling's key groove position at No 1 cylinder's beginning of injection
(3)-
(4)-
----------
----------
a=(7deg)
----------
----------
a=(7deg)
Information:
Reassembly and adjustment (2-spring nozzle)
Adjust while assembling the parts by the following procedures.As the prelift is adjusted in 1/100 mm increments, use clean detergent to thoroughly remove dust and dirt before adjustment.The following special tools are necessary for adjustment. Adjusting Steps
(1) Adjustment of nozzle opening pressure(2) Selection of prelift adjusting shims(3) Adjustment of 2-spring adjusting pressure(4) * Check of needle valve full lift(5) Installation of prelift shims(6) * Checking of prelift(7) * Checking of 2-spring adjusting pressure(8) InspectionInspection make operations marked with * as necessary for inspection or confirmation.(1) Adjustment of nozzle valve opening pressure (a) Using the special tool, Retasining Nut for Adjustment, install the nozzle and needle valve to the nozzle holder. 1. Make sure that the knock pin has seated completely in the nozzle before tightening the retaining nut for adjustment. Tighten the retaining nut finger tight and then tighten to specified torque using a torque wrench.2. Remove the bolt from the tip of the retaining nut. (b) Insert 1st push rod 1st spring, valve opening pressure adjusting shim (first use about 1 mm thick one) and spacer to the nozzle holder. Then tighten the setscrew to specified torque. (c) Install the nozzle holder to the special tool, Nozzle Tester and adjust the shim thickness for nominal injection pressureShim types 0.50, 0.52, 0.54, 0.56, 0.58 0.60, 0.70, 0.80, 0.90, 1.00, 0.10, 0.20, 0.30, 0.40 mm 1. When using a shim, be sure to check its thickness by a micrometer.2. Use same shim for prelift adjustment.3. Use of a 0.02 mm thick shim changes the valve opening pressure by about 235 kPa (2.4 kgf/cm2)(2) Selection of prelift adjusting shim(a) 0 point adjustment of Adjusting Device Install the special tool, Dial Gauge to the special tool, Adjusting Device.Install the 2nd push rod to the special tool, Base and install the assembly to a vice.Set the pin and Adjusting Device as indicated in the above illustration and adjust 0 point of the Dial Gauge Use a 60.5 mm long pin.(b) Install the 2nd push rod to the nozzle holder. Do not install the 2nd spring and prelift adjusting shim. (c) Install the Adjusting Device to the setscrew using its intermediate screw.After installation, holding the Dial Gauge at its holder, move it up and down to check that the gauge operates smoothly.Push down the gauge, holding its holder and read its lift h. Read to 1/100 mm(d) Selection of prelift adjusting shim (e) Remove the Adjusting Device from the Nozzle Holder.(3) Adjustment of 2-spring adjusting pressure Install the 2nd spring, adjusting screw and lock nut to the nozzle holder. Do not install the prelift adjusting shim. Using the special tool, Nozzle Tester, adjust the adjusting screw for nominal injection pressure.After adjustment, tighten the lock nut to specified torque.(4) Checking full lift of needle valve (a) Install the special tools indicated in above illustration and set 0 point of the Dial Gauge.(b) Install the nozzle to the Nozzle Tester and operate the tester lever to bleed the inside of
Adjust while assembling the parts by the following procedures.As the prelift is adjusted in 1/100 mm increments, use clean detergent to thoroughly remove dust and dirt before adjustment.The following special tools are necessary for adjustment. Adjusting Steps
(1) Adjustment of nozzle opening pressure(2) Selection of prelift adjusting shims(3) Adjustment of 2-spring adjusting pressure(4) * Check of needle valve full lift(5) Installation of prelift shims(6) * Checking of prelift(7) * Checking of 2-spring adjusting pressure(8) InspectionInspection make operations marked with * as necessary for inspection or confirmation.(1) Adjustment of nozzle valve opening pressure (a) Using the special tool, Retasining Nut for Adjustment, install the nozzle and needle valve to the nozzle holder. 1. Make sure that the knock pin has seated completely in the nozzle before tightening the retaining nut for adjustment. Tighten the retaining nut finger tight and then tighten to specified torque using a torque wrench.2. Remove the bolt from the tip of the retaining nut. (b) Insert 1st push rod 1st spring, valve opening pressure adjusting shim (first use about 1 mm thick one) and spacer to the nozzle holder. Then tighten the setscrew to specified torque. (c) Install the nozzle holder to the special tool, Nozzle Tester and adjust the shim thickness for nominal injection pressureShim types 0.50, 0.52, 0.54, 0.56, 0.58 0.60, 0.70, 0.80, 0.90, 1.00, 0.10, 0.20, 0.30, 0.40 mm 1. When using a shim, be sure to check its thickness by a micrometer.2. Use same shim for prelift adjustment.3. Use of a 0.02 mm thick shim changes the valve opening pressure by about 235 kPa (2.4 kgf/cm2)(2) Selection of prelift adjusting shim(a) 0 point adjustment of Adjusting Device Install the special tool, Dial Gauge to the special tool, Adjusting Device.Install the 2nd push rod to the special tool, Base and install the assembly to a vice.Set the pin and Adjusting Device as indicated in the above illustration and adjust 0 point of the Dial Gauge Use a 60.5 mm long pin.(b) Install the 2nd push rod to the nozzle holder. Do not install the 2nd spring and prelift adjusting shim. (c) Install the Adjusting Device to the setscrew using its intermediate screw.After installation, holding the Dial Gauge at its holder, move it up and down to check that the gauge operates smoothly.Push down the gauge, holding its holder and read its lift h. Read to 1/100 mm(d) Selection of prelift adjusting shim (e) Remove the Adjusting Device from the Nozzle Holder.(3) Adjustment of 2-spring adjusting pressure Install the 2nd spring, adjusting screw and lock nut to the nozzle holder. Do not install the prelift adjusting shim. Using the special tool, Nozzle Tester, adjust the adjusting screw for nominal injection pressure.After adjustment, tighten the lock nut to specified torque.(4) Checking full lift of needle valve (a) Install the special tools indicated in above illustration and set 0 point of the Dial Gauge.(b) Install the nozzle to the Nozzle Tester and operate the tester lever to bleed the inside of
Have questions with 106673-2470?
Group cross 106673-2470 ZEXEL
Mitsubishi
106673-2470
9 400 617 240
ME157368
INJECTION-PUMP ASSEMBLY
6D22T
6D22T