Information injection-pump assembly
BOSCH
9 400 610 906
9400610906
ZEXEL
106672-3731
1066723731

Rating:
Service parts 106672-3731 INJECTION-PUMP ASSEMBLY:
1.
_
5.
AUTOM. ADVANCE MECHANIS
7.
COUPLING PLATE
8.
_
9.
_
11.
Nozzle and Holder
23600-1561C
12.
Open Pre:MPa(Kqf/cm2)
21.6{220}
15.
NOZZLE SET
Include in #1:
106672-3731
as INJECTION-PUMP ASSEMBLY
Cross reference number
BOSCH
9 400 610 906
9400610906
ZEXEL
106672-3731
1066723731
Zexel num
Bosch num
Firm num
Name
Calibration Data:
Adjustment conditions
Test oil
1404 Test oil ISO4113 or {SAEJ967d}
1404 Test oil ISO4113 or {SAEJ967d}
Test oil temperature
degC
40
40
45
Nozzle and nozzle holder
105780-8140
Bosch type code
EF8511/9A
Nozzle
105780-0000
Bosch type code
DN12SD12T
Nozzle holder
105780-2080
Bosch type code
EF8511/9
Opening pressure
MPa
17.2
Opening pressure
kgf/cm2
175
Injection pipe
Outer diameter - inner diameter - length (mm) mm 8-3-600
Outer diameter - inner diameter - length (mm) mm 8-3-600
Overflow valve
134424-1420
Overflow valve opening pressure
kPa
162
147
177
Overflow valve opening pressure
kgf/cm2
1.65
1.5
1.8
Tester oil delivery pressure
kPa
157
157
157
Tester oil delivery pressure
kgf/cm2
1.6
1.6
1.6
Direction of rotation (viewed from drive side)
Right R
Right R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right R
Right R
Injection order
1-4-2-6-
3-5
Pre-stroke
mm
3.9
3.85
3.95
Beginning of injection position
Drive side NO.1
Drive side NO.1
Difference between angles 1
Cal 1-4 deg. 60 59.5 60.5
Cal 1-4 deg. 60 59.5 60.5
Difference between angles 2
Cyl.1-2 deg. 120 119.5 120.5
Cyl.1-2 deg. 120 119.5 120.5
Difference between angles 3
Cal 1-6 deg. 180 179.5 180.5
Cal 1-6 deg. 180 179.5 180.5
Difference between angles 4
Cal 1-3 deg. 240 239.5 240.5
Cal 1-3 deg. 240 239.5 240.5
Difference between angles 5
Cal 1-5 deg. 300 299.5 300.5
Cal 1-5 deg. 300 299.5 300.5
Injection quantity adjustment
Adjusting point
A
Rack position
9.8
Pump speed
r/min
750
750
750
Average injection quantity
mm3/st.
89.3
88.3
90.3
Max. variation between cylinders
%
0
-2
2
Basic
*
Fixing the rack
*
Boost pressure
kPa
40
40
Boost pressure
mmHg
300
300
Injection quantity adjustment_02
Adjusting point
B
Rack position
8.2+-0.5
Pump speed
r/min
360
360
360
Average injection quantity
mm3/st.
14
11
17
Max. variation between cylinders
%
0
-15
15
Fixing the rack
*
Boost pressure
kPa
0
0
0
Boost pressure
mmHg
0
0
0
Injection quantity adjustment_03
Adjusting point
D
Rack position
-
Pump speed
r/min
100
100
100
Average injection quantity
mm3/st.
187
177
197
Fixing the lever
*
Boost pressure
kPa
0
0
0
Boost pressure
mmHg
0
0
0
Rack limit
*
Boost compensator adjustment
Pump speed
r/min
600
600
600
Rack position
10.35
Boost pressure
kPa
3.3
3.3
5.3
Boost pressure
mmHg
25
25
40
Boost compensator adjustment_02
Pump speed
r/min
600
600
600
Rack position
10.9
Boost pressure
kPa
26.7
26.7
26.7
Boost pressure
mmHg
200
200
200
Test data Ex:
Governor adjustment

N:Pump speed
R:Rack position (mm)
(1)Notch fixed: K
(2)Tolerance for racks not indicated: +-0.05mm.
(3)Stop lever normal position setting
(4)RACK LIMIT
(5)Boost compensator stroke
(6)Main spring setting
(7)Set idle sub-spring
----------
K=15
----------
----------
K=15
----------
Speed control lever angle

F:Full speed
I:Idle
(1)When pump speed set at aa
(2)Set the pump speed at bb.
(3)Stopper bolt setting
(4)Stopper bolt setting
----------
aa=750r/min bb=900r/min
----------
a=(7deg)+-5deg b=(17deg)+-5deg c=(5deg)+-5deg
----------
aa=750r/min bb=900r/min
----------
a=(7deg)+-5deg b=(17deg)+-5deg c=(5deg)+-5deg
Stop lever angle

N:Pump normal
S:Stop the pump.
(1)At delivery
(2)Pump speed aa and rack position bb (to be sealed at delivery)
(3)Stopper bolt setting
(4)Rack position = cc
(5)Set for delivery (normal side setscrew is backed off dd from normal setting).
(6)Stopper bolt setting
----------
aa=0r/min bb=2.5-0.5mm cc=13.5+-0.1mm dd=2.5+-0.5mm
----------
a=10deg+-5deg b=37deg+-5deg c=(19deg)
----------
aa=0r/min bb=2.5-0.5mm cc=13.5+-0.1mm dd=2.5+-0.5mm
----------
a=10deg+-5deg b=37deg+-5deg c=(19deg)
Timing setting

(1)Pump vertical direction
(2)Coupling's key groove position at No 1 cylinder's beginning of injection
(3)-
(4)-
----------
----------
a=(50deg)
----------
----------
a=(50deg)
Information:
Information Release Memo REM03-10
Reman
May 2003 REMANUFACTURED FUEL INJECTOR FOR VARIOUS 3500 GENSET, MACHINE AND MARINE APPLICATIONS Announcement The Caterpillar Remanufactured Products Group announces the expansion of the remanufactured injector product line to include coverage for various 3500 Genset, Machine and Marine applications. Coverage The addition of this Reman injector provides dealers with an additional repair option to support various 3500 Genset, Machine and Marine applications. Coverage is extensive so please consult your NPR or Reman Cross Reference for exact model coverage. Features And Benefits Cat? Remanufactured injectors offer excellent value to customers. Customers who want fast repair turn-around, superior quality and reliability, and lower repair costs will benefit from the use of these Remanufactured injectors. Cat Remanufactured injectors provide immediate, off-the-shelf availability at a fraction of the new price. Features
All critical engineering changes and updates included
Worldwide availability through Caterpillar? parts distribution system
Backed by Cat warranty Benefits
Improved reliability and performance
Customer access regardless of location
Consistent support Core Acceptance Core Acceptance Criteria for Caterpillar Remanufactured injectors is simple, visual, and requires no special tools. Full core credit is issued when the core is complete, fully assembled, and has an acceptable part number. Consult your Core Acceptance Guide for complete details. Warranty Please consult the appropriate warranty statement for your area. Core Management Please refer to the Caterpillar Core Management Information System (CMIS 2) Parts Information application describing all reman part/CAF and related information. Also refer to other CMIS 2 inquiry applications such as Customer Profiles, Inspection Reason Codes, Inspection Line Inquiry, Add Charge Information, Entitlement Activity, Entitlement Inquiry, CCR Inquiry, CCR Entry, Shipment Processing; Process Packaging Grief; and Reporting to properly manage core returns and monitor inspection performance. This information will be available to all dealers worldwide after your CMIS 2 conversion date. In the meantime, please continue to use the current CMIS Entitlement Parts Inquiry Screen describing the list of parts in a Core Acceptability Family (CAF) and related part number detail. For the latest updates of Reman Policies and Core Management (SELD0122), Core Management Systems & Operations Procedures (SELD0040), and Shipping Instructions (SELD0039), go to the Reman Dealer website https://reman.cat.com If you have any questions regarding core return processing, feel free to call Corinth toll free at (800) 537-2928. For assistance with technical questions, call the Peoria Reman Customer Satisfaction Hot Line also toll free at (888) 88-REMAN or use our E-mail address--Reman_Help.
PELJ0170 CATERPILLAR? ?2003 Caterpillar