106672-3043 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1066723043 220003674a


 

Information injection-pump assembly

ZEXEL 106672-3043 1066723043
HINO 220003674A 220003674a
106672-3043 INJECTION-PUMP ASSEMBLY
Rating:
52
Buy INJECTION-PUMP ASSEMBLY 106672-3043 zexel genuine, new aftermarket engine parts with delivery

Cross reference number

ZEXEL 106672-3043 1066723043
HINO 220003674A 220003674a


Zexel num
Bosch num
Firm num
Name
106672-3043 
106672-3047 
 
220003674A  HINO
INJECTION-PUMP ASSEMBLY
EK100 *

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   134424-0920
Overflow valve opening pressure kPa   162 147 177
Overflow valve opening pressure kgf/cm2   1.65 1.5 1.8
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Left
  L
Injection timing adjustment
Direction of rotation (viewed from drive side)
Left
  L
Injection order   1-4-2-6- 3-5
Pre-stroke mm   3.3 3.24 3.3
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-4
deg.   60 59.75 60.25
Difference between angles 2
Cyl.1-2
deg.   120 119.75 120.25
Difference between angles 3
Cal 1-6
deg.   180 179.75 180.25
Difference between angles 4
Cal 1-3
deg.   240 239.75 240.25
Difference between angles 5
Cal 1-5
deg.   300 299.75 300.25
Injection quantity adjustment
Adjusting point   A
Rack position   10.9
Pump speed r/min   500 500 500
Average injection quantity mm3/st.   134.9 131.9 137.9
Max. variation between cylinders %   0 -4 4
Fixing the lever   *
Injection quantity adjustment_02
Adjusting point   B
Rack position   11.2
Pump speed r/min   700 700 700
Average injection quantity mm3/st.   145.4 143.4 147.4
Max. variation between cylinders %   0 -2 2
Basic   *
Fixing the lever   *
Injection quantity adjustment_03
Adjusting point   C
Rack position   11.6
Pump speed r/min   1150 1150 1150
Average injection quantity mm3/st.   151.7 148.7 154.7
Max. variation between cylinders %   0 -4 4
Fixing the lever   *
Remarks
(check)
 
Injection quantity adjustment_04
Adjusting point   D
Rack position   7+-0.5
Pump speed r/min   225 225 225
Average injection quantity mm3/st.   15 12 18
Max. variation between cylinders %   0 -15 15
Fixing the rack   *
Injection quantity adjustment_05
Adjusting point   E
Rack position   -
Pump speed r/min   100 100 100
Average injection quantity mm3/st.   136 126 146
Fixing the lever   *

Test data Ex:

Governor adjustment

Test data 106672-3043
N:Pump speed R:Rack position (mm) (1)Beginning of damper spring operation: DL (2)RACK LIMIT
----------
DL=6.2-0.2mm
----------

Speed control lever angle

Test data 106672-3043
F:Full speed
----------

----------
a=3deg+-5deg

0000000901

Test data 106672-3043
F:Full load I:Idle (1)Set point D (2)At delivery (3)Stopper bolt setting
----------

----------
a=10deg+-5deg b=27deg+-3deg c=27deg+-5deg

Stop lever angle

Test data 106672-3043
N:Pump normal S:Stop the pump.
----------

----------
a=15deg+-5deg b=64deg+-5deg

0000001501 GOVERNOR TORQUE CONTROL

Test data 106672-3043
Dr:Torque control stroke (A): Without torque control spring capsule 1. Adjustment procedures (1)Procedure is the same as that for the RFD (former type), except that the positive torque control stroke must be determined at the full lever setting. 2. Procedures for adjustment (1)Remove the torque control spring capsule. (2)Operate the pump at approximately N1. (End of idling spring operation < N1.) (3)Tilt the lever to the full side. (4)Set so that R = RF. (5)Increase the speed by pushing in the screw (attached to the bracket on the rear of the tension lever) through the adjusting window. (6)Adjust so that the torque control stroke Dr1 can be obtained. (7)Align N2 and N3 with the torque control spring capsule. 3. Final confirmation (1)After final confirmation, temporarily set the load lever to N = N1, R = idling position. (2)From this condition, increase speed to N = N4. (3)Confirm that positive torque control stroke is Dr2.
----------
N1=500r/min N2=550+-40r/min N3=900+-50r/min N4=900r/min RF=10.9mm Dr1=0.7mm Dr2=0+0.3mm
----------




Information:


For serial number specific information, please see SISWEB.
Features and Benefits
Cat Reman products offer excellent value to customers. Customers who want fast repair turn-around, superior quality and reliability, and lower repair costs will benefit from the use of these remanufactured products. Cat Reman parts provide immediate, off-the-shelf availability at a fraction of the new price.
Features Benefits
All critical engineering changes and updates included
Improved reliability and performance
Worldwide availability through Cat® parts distribution system
Customer access regardless of location
Backed by Caterpillar parts warranty
Consistent support
Core Acceptance
Core Acceptance Criteria for Cat Reman parts is simple, visual, and requires no special tools. Please consult the applicable Core Acceptance Criteria for each product for complete details. Core Acceptance Criteria can be found at catreman.cat.com/cac.
Unit Injectors Electronic - SELD0226-01
Warranty
Please consult the appropriate Caterpillar parts warranty statement for your area.
Core Management
Please refer to the Cat Core Management Information System (CMIS 2) Parts Information application describing all Cat Reman part/CAF and related information. Also refer to other CMIS 2 inquiry applications such as Customer Profiles, Inspection Reason Codes, Inspection Line Inquiry, Add Charge Information, Entitlement Activity, Entitlement Inquiry, CCR Inquiry, CCR Entry, Shipment Processing; Process Packaging Grief; and Reporting to properly manage core returns and monitor inspection performance. This information will be available to all dealers worldwide after your CMIS 2 conversion date. In the meantime, please continue to use the current CMIS Entitlement Parts Inquiry Screen describing the list of parts in a Core Acceptability Family (CAF) and related part number detail.
For the latest updates of Reman Policies and Core Management (SELD0122), Core Management Systems & Operations Procedures (SELD0040), and Shipping Instructions (SELD0039), go to the Reman Dealer website https://catreman.cat.com. If you have any questions regarding core return processing, feel free to call Corinth toll free at (800) 537-2928. Outside the US please refer to the Core section of the Reman website for appropriate contact information for your region.
For assistance with technical questions, call the Peoria Reman Technical Help Line also toll free at (888) 88-REMAN (outside the US call non-toll free +1-309-494-4342), or use our E-mail address, Reman_Help.
Contact Information:
Global Dealer Solutions Network
Parts Technical Support Team
Toll Free - North America: 1-877-228-2420
International: +1-309-266-4421
Electronic Requests: Send via Microsoft Customer Relationship Management (MSCRM)
For access and tutorial information: https://gdsn.cat.com/mscrm

Have questions with 106672-3043?





Group cross 106672-3043 ZEXEL

Hino 

 
220003671A 
INJECTION-PUMP ASSEMBLY
EK100
 
220003672A 
INJECTION-PUMP ASSEMBLY
EK100
 
220003673A 
INJECTION-PUMP ASSEMBLY
EK100
106672-3043  

106672-3047 
 
220003674A 
INJECTION-PUMP ASSEMBLY
EK100
 
220003675A 
INJECTION-PUMP ASSEMBLY
EK100
 
220003676A 
INJECTION-PUMP ASSEMBLY
EK100
 
220003678A 
INJECTION-PUMP ASSEMBLY
EK100
F 019 Z10 293 
220004090A 
INJECTION-PUMP ASSEMBLY
EK100
Back to top