Information injection-pump assembly
BOSCH
F 019 Z10 087
f019z10087
ZEXEL
106671-8682
1066718682
HINO
220204421B
220204421b

Rating:
Service parts 106671-8682 INJECTION-PUMP ASSEMBLY:
1.
_
7.
COUPLING PLATE
8.
_
9.
_
11.
Nozzle and Holder
236002191B
12.
Open Pre:MPa(Kqf/cm2)
21.6{220}
15.
NOZZLE SET
Include in #1:
106671-8682
as INJECTION-PUMP ASSEMBLY
Cross reference number
Zexel num
Bosch num
Firm num
Name
Information:
Introduction
This Special Instruction addresses the issue about the amount of ash in the DPF, and whether the DPF must be cleaned. Use the following procedure in order to determine if the DPF must be cleaned.Procedure
Note: This test is not designed to determine if a DPF is clean, only to determine if the DPF must be cleaned.
Perform a crack detection test. Refer to Special Instruction, REHS5017. Go to Step 2 if the DPF passes the crack detection test. Contact the Technical Communicator, if the DPF fails the test
Use a wire with the maximum diameter of 1.04140 mm (0.041 inch). Hold the wire so that the end of the wire is just inside the cell approximately 6.35000 mm (0.25 inch).
Drop the wire into the cell of the DPF.
Mark the wire at the top of the cell where the wire exits from the DPF.
Measure the depth that the wire dropped by measuring from the mark to the bottom tip of the wire.
Record the measurement.
Illustration 1 g03021156
Top view of DPFView of locations for recording measurements (1) Weld line
Perform Steps 3 through 6 for all locations. Refer to Illustration 1 for the proper location for recording measurements.
Average the measurements and subtract the average from the length of the DPF substrate length. The DPF must be cleaned if the number is more than 6 inches. Replace the DPF if the DPF cannot be cleaned.
This Special Instruction addresses the issue about the amount of ash in the DPF, and whether the DPF must be cleaned. Use the following procedure in order to determine if the DPF must be cleaned.Procedure
Note: This test is not designed to determine if a DPF is clean, only to determine if the DPF must be cleaned.
Perform a crack detection test. Refer to Special Instruction, REHS5017. Go to Step 2 if the DPF passes the crack detection test. Contact the Technical Communicator, if the DPF fails the test
Use a wire with the maximum diameter of 1.04140 mm (0.041 inch). Hold the wire so that the end of the wire is just inside the cell approximately 6.35000 mm (0.25 inch).
Drop the wire into the cell of the DPF.
Mark the wire at the top of the cell where the wire exits from the DPF.
Measure the depth that the wire dropped by measuring from the mark to the bottom tip of the wire.
Record the measurement.
Illustration 1 g03021156
Top view of DPFView of locations for recording measurements (1) Weld line
Perform Steps 3 through 6 for all locations. Refer to Illustration 1 for the proper location for recording measurements.
Average the measurements and subtract the average from the length of the DPF substrate length. The DPF must be cleaned if the number is more than 6 inches. Replace the DPF if the DPF cannot be cleaned.