106671-6402 ZEXEL 9 400 616 908 BOSCH INJECTION-PUMP ASSEMBLY 9400616908 1066716402 1156033910


 

Information injection-pump assembly

BOSCH 9 400 616 908 9400616908
ZEXEL 106671-6402 1066716402
ISUZU 1156033910 1156033910
106671-6402 INJECTION-PUMP ASSEMBLY
Rating:
24
Buy INJECTION-PUMP ASSEMBLY 106671-6402 zexel genuine, new aftermarket engine parts with delivery

Service parts 106671-6402 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106067-6311
3. GOVERNOR 105487-7720
4. SUPPLY PUMP 105237-4480
5. AUTOM. ADVANCE MECHANIS 105681-1580
6. COUPLING PLATE 105664-2160
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105160-5200
11. Nozzle and Holder
12. Open Pre:MPa(Kqf/cm2) 19.6(200)
13. NOZZLE-HOLDER 105030-4492
14. NOZZLE 105025-3310
15. NOZZLE SET

Include in #1:

106671-6402 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH 9 400 616 908 9400616908
ZEXEL 106671-6402 1066716402
ISUZU 1156033910 1156033910


Zexel num
Bosch num
Firm num
Name
106671-6402 
9 400 616 908 
1156033910  ISUZU
INJECTION-PUMP ASSEMBLY
6RB1-TCG K 14CA INJECTION PUMP ASSY PE6P,6PD PE

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8130
Bosch type code   EFEP215A
Nozzle   105780-0050
Bosch type code   DN6TD119NP1T
Nozzle holder   105780-2090
Bosch type code   EFEP215
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   134424-3920
Overflow valve opening pressure kPa   127 107 147
Overflow valve opening pressure kgf/cm2   1.3 1.1 1.5
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-4-2-6- 3-5
Pre-stroke mm   4.2 4.15 4.25
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-4
deg.   60 59.5 60.5
Difference between angles 2
Cyl.1-2
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cal 1-3
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-5
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   11.6
Pump speed r/min   1050 1050 1050
Average injection quantity mm3/st.   481 478 484
Max. variation between cylinders %   0 -3 3
Basic   *
Fixing the lever   *
Boost pressure kPa   173 173
Boost pressure mmHg   1300 1300
Injection quantity adjustment_02
Adjusting point   B
Rack position   5.7+-0.5
Pump speed r/min   305 305 305
Average injection quantity mm3/st.   15 13 17
Max. variation between cylinders %   0 -13 13
Fixing the rack   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
Injection quantity adjustment_03
Adjusting point   C
Rack position   8.8+-0.1
Pump speed r/min   500 500 500
Average injection quantity mm3/st.   230 227 233
Fixing the lever   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
Boost compensator adjustment
Pump speed r/min   500 500 500
Rack position   8.8+-0.1
Boost pressure kPa   53.3 50.6 56
Boost pressure mmHg   400 380 420
Boost compensator adjustment_02
Pump speed r/min   500 500 500
Rack position   (11.6)
Boost pressure kPa   160 160 160
Boost pressure mmHg   1200 1200 1200
Timer adjustment
Pump speed r/min   1050++
Advance angle deg.   0 0 0
Remarks
Do not advance until starting N = 1050.
 
Timer adjustment_02
Pump speed r/min   -
Advance angle deg.   1 1 1
Remarks
Measure the actual speed, stop
 

Test data Ex:

Governor adjustment

Test data 106671-6402
N:Pump speed R:Rack position (mm) (1)Tolerance for racks not indicated: +-0.05mm. (2)May not protrude at starting. (3)Boost compensator excessive fuel lever setting: L1 (at boost pressure 0) (4)Boost compensator stroke: BCL (5)Set idle sub-spring (6)Main spring setting
----------
L1=10.8+-0.1mm BCL=(2.8)mm
----------

Speed control lever angle

Test data 106671-6402
F:Full speed I:Idle (1)Stopper bolt setting (2)Use the hole at R = aa
----------
aa=135mm
----------
a=(73deg)+-5deg b=(14deg)+-5deg

0000000901

Test data 106671-6402
F:Full load (1)Tamperproof setting (at R = point L, N = aa) (2)Fix using the stopper bolt.
----------
aa=1400r/min
----------
a=18deg+-5deg b=(8deg)

Stop lever angle

Test data 106671-6402
N:Pump normal S:Stop the pump. (1)Drive side
----------

----------
a=32deg+-5deg b=64deg+-5deg

0000001101

Test data 106671-6402
N:Normal B:When boosted (1)Rack position = aa at boost pressure 0.
----------
aa=10.8+-0.1mm
----------
a=(10deg) b=(15deg)

0000001501 TAMPER PROOF

Test data 106671-6402
(A): sealing wire (B): full load stopper bolt (C): load lever (D): governor cover boss (E): tamper lever installation bolt ST:Sealing a, b: load lever angle 1. Method for setting tamperproof proofing (1)After completing governor adjustment, install lever marked A when the load lever (C)'s angle is equal to or greater than a but less than b, and lever marked B when angle is equal to or greater than c but equal to or less than d (as shown in figure). Sealing A: PN1 Sealing B: PN2 (2)At R1 and N1 loosen bolt B until the lever installed in (1) contacts the governor cover boss. (3)Confirm that the rack position at this time is R = R2 or less. (4)After this, readjust the full rack position using the load lever C. (5)Seal bolt E.
----------
a=13deg b=18deg c=18deg d=23deg PN1=154386-3300 PN2=154386-3400 R1=L(11.6-11+0.5) R2=(2.9)mm N1=1400r/min
----------

Timing setting

Test data 106671-6402
(1)Pump vertical direction (2)Position of timer's threaded hole at No 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)-
----------
aa=18deg
----------
a=(70deg)




Information:


Install Tooling (E). Tighten Tooling (E) to a torque of 9 1 N m (80 9 lb in).Note: The pump will not function while Tooling (E) is installed. Running the fuel injection pump with the tooling installed will result in pump damage and system contamination.
Illustration 6 g02025176
Disconnect harness assemblies (3).
Remove nut (5) and remove the clamp assembly. Discard the clamp assembly.
Loosen nuts (4) and (7). Remove the fuel line and discard the fuel line.
Disconnect hose assembly (6).
Illustration 7 g02029098
Disconnect tube assemblies (9).
Disconnect hose assemblies (10) and (11).
Remove bolts (8).
Illustration 8 g02029093
Disconnect tube assembly (12).
Illustration 9 g02025262
Remove bolts (13) and remove fuel pump (14).Installing the Fuel Injection Pump
Note: Check the O-ring seals, the gaskets, and the seals for wear or for damage. Replace the components, if necessary.
Illustration 10 g02385860
Service replacement pump
Note: Service replacement pump is shipped pinned with warning tag (Z) installed under pinch bolt (E).
Illustration 11 g02025262
Position fuel pump (14) and install bolts (13).
Illustration 12 g02029093
Connect tube assembly (12).
Illustration 13 g02029098
Install bolts (8).
Connect tube assembly (9) and connect both hose assemblies (10) and (11).
Illustration 14 g02025176Note: During installation, make sure that the fuel line caps remain in position until the fuel line is positioned near the corresponding ports in order to prevent contamination. Ensure that the areas around the rail and fuel lines are thoroughly clean before continuing this procedure. If any parts are worn or damaged, use new parts for replacement. Cleanliness is an important factor. Ensure that no debris gets introduced into the fuel system during the installation procedure. If any parts are worn or damaged, use new parts for replacement.
Connect harness assemblies (3).
Install a new fuel line. Hand tighten nuts (4) and (7).
Position the clamp assembly and install nut (5). Hand tighten the nut. Failure to place the grommet correctly on the fuel line could result in a failed fuel line.Note: Ensure that the fuel lines are centered in the nuts prior to tightening. Do not use excessive force or bending in order to assemble the fuel lines.
Tighten nut (4) at the fuel rail to a torque of 27 3 N m (239 27 lb in).
Tighten nut (7) to a torque of 27 3 N m (239 27 lb in).
Tighten nut (5) to a torque of 12 3 N m (105 27 lb in).
Illustration 15 g02351995
Remove Tooling (E) and warning tag (Z).Note: The pump will not function while Tooling (E) is installed. Running the fuel injection pump with the tooling installed will result in pump damage and system contamination.
Illustration 16 g02351981
Install O-ring seal (2) and plug (1). Tighten the plug to a torque of 9 1 N m (80 9 lb in).
Illustration 17 g02112896
Remove all tooling. Reinstall plug (X) into the timing hole that is located in the flywheel housing.
Connect Caterpillar Electronic Technician (ET). Perform a “Fuel System Functional Test ”and a “Fuel System Verification Test”.

Have questions with 106671-6402?





Group cross 106671-6402 ZEXEL

Isuzu 

9 400 611 453 
1156032770 
INJECTION-PUMP ASSEMBLY
6RB1-MTC
9 400 612 221 
 
INJECTION-PUMP ASSEMBLY

Isuzu 

106671-6402  
9 400 616 908 
1156033910 
INJECTION-PUMP ASSEMBLY
6RB1-TCG
 
1156032860 
INJECTION-PUMP ASSEMBLY
6SD1-TC
9 400 616 909 
1156032861 
INJECTION-PUMP ASSEMBLY
6SD1-TC
 
1156032870 
INJECTION-PUMP ASSEMBLY
6SD1-TC
9 400 611 620 
1156032871 
INJECTION-PUMP ASSEMBLY
6SD1-TC
 
1156032920 
INJECTION-PUMP ASSEMBLY
6WA1-TC
9 400 611 951 
1156033410 
INJECTION-PUMP ASSEMBLY
6WG1-T
9 400 612 270 
1156034160 
INJECTION-PUMP ASSEMBLY
6WG1-TQA
9 400 612 502 
1156034161 
INJECTION-PUMP ASSEMBLY
6WG1-TQA
9 400 611 899 
1156033340 
INJECTION-PUMP ASSEMBLY
6HK1-TC
9 400 612 271 
1156033341 
INJECTION-PUMP ASSEMBLY
6HK1-TC
9 400 613 008 
1156033342 
INJECTION-PUMP ASSEMBLY
6HK1-XQA
9 400 611 952 
 
INJECTION-PUMP ASSEMBLY
6HK1-T
9 400 616 910 
1156033970 
INJECTION-PUMP ASSEMBLY
6HK1-XQA
 
 
INJECTION-PUMP ASSEMBLY

Isuzu 

 
1156033480 
INJECTION-PUMP ASSEMBLY
6SD1-TC
9 400 612 540 
1156033481 
INJECTION-PUMP ASSEMBLY
6SD1-XQB
9 400 612 376 
1156033482 
INJECTION-PUMP ASSEMBLY
6SD1-XQB
9 400 612 664 
1156033483 
INJECTION-PUMP ASSEMBLY
6SD1-XQB
9 400 612 272 
1156034010 
INJECTION-PUMP ASSEMBLY
6WG1-T
Back to top