106671-6340 ZEXEL 9 400 619 996 BOSCH INJECTION-PUMP ASSEMBLY 9400619996 1066716340 1156032580


 

Information injection-pump assembly

BOSCH 9 400 619 996 9400619996
ZEXEL 106671-6340 1066716340
ISUZU 1156032580 1156032580
106671-6340 INJECTION-PUMP ASSEMBLY
Rating:
85
Buy INJECTION-PUMP ASSEMBLY 106671-6340 zexel genuine, new aftermarket engine parts with delivery

Service parts 106671-6340 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106067-1380
3. GOVERNOR 105923-2720
4. SUPPLY PUMP 105237-4850
5. AUTOM. ADVANCE MECHANIS 105681-5720
6. COUPLING PLATE 105664-2261
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105101-7980
11. Nozzle and Holder
12. Open Pre:MPa(Kqf/cm2) 17.7{180}/22.1{225}
13. NOZZLE-HOLDER 105031-4801
14. NOZZLE 105025-0700
15. NOZZLE SET

Include in #1:

106671-6340 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH 9 400 619 996 9400619996
ZEXEL 106671-6340 1066716340
ISUZU 1156032580 1156032580


Zexel num
Bosch num
Firm num
Name
106671-6340 
106671-6341 
9 400 619 996 
1156032580  ISUZU
INJECTION-PUMP ASSEMBLY
6SD1-TC * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   131424-8620
Overflow valve opening pressure kPa   206 172 240
Overflow valve opening pressure kgf/cm2   2.1 1.75 2.45
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Left
  L
Injection timing adjustment
Direction of rotation (viewed from drive side)
Left
  L
Injection order   1-5-3-6- 2-4
Pre-stroke mm   4.5 4.47 4.53
Beginning of injection position
Governor side
  NO.1
Difference between angles 1
Cal 1-5
deg.   60 59.75 60.25
Difference between angles 2
Cal 1-3
deg.   120 119.75 120.25
Difference between angles 3
Cal 1-6
deg.   180 179.75 180.25
Difference between angles 4
Cyl.1-2
deg.   240 239.75 240.25
Difference between angles 5
Cal 1-4
deg.   300 299.75 300.25
Injection quantity adjustment
Adjusting point   -
Rack position   11.3
Pump speed r/min   700 700 700
Average injection quantity mm3/st.   149 147 151
Max. variation between cylinders %   0 -3 3
Basic   *
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_02
Adjusting point   H
Rack position   6.4+-0.5
Pump speed r/min   290 290 290
Average injection quantity mm3/st.   10 6.8 13.2
Max. variation between cylinders %   0 -13 13
Fixing the rack   *
Standard for adjustment of the maximum variation between cylinders   *
Injection quantity adjustment_03
Adjusting point   A
Rack position   R1(11.3)
Pump speed r/min   700 700 700
Average injection quantity mm3/st.   149 147 151
Basic   *
Fixing the lever   *
Boost pressure kPa   60 60
Boost pressure mmHg   450 450
Injection quantity adjustment_04
Adjusting point   B
Rack position   R1+0.65
Pump speed r/min   1100 1100 1100
Average injection quantity mm3/st.   161 155 167
Fixing the lever   *
Boost pressure kPa   60 60
Boost pressure mmHg   450 450
Boost compensator adjustment
Pump speed r/min   500 500 500
Rack position   R2-1.75
Boost pressure kPa   4 4 6.7
Boost pressure mmHg   30 30 50
Boost compensator adjustment_02
Pump speed r/min   500 500 500
Rack position   R2(R1-0. 45)
Boost pressure kPa   46.7 46.7 46.7
Boost pressure mmHg   350 350 350
Timer adjustment
Pump speed r/min   850--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   800
Advance angle deg.   0.5
Timer adjustment_03
Pump speed r/min   875
Advance angle deg.   1 0.5 1.5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 106671-6340
N:Pump speed R:Rack position (mm) (1)Torque cam stamping: T1 (2)Tolerance for racks not indicated: +-0.05mm. (3)Boost compensator stroke: BCL
----------
T1=AE45 BCL=1.75+-0.1mm
----------

Speed control lever angle

Test data 106671-6340
F:Full speed I:Idle (1)Use the pin at R = aa (2)Stopper bolt set position 'H'
----------
aa=35mm
----------
a=27deg+-5deg b=32.5deg+-3deg

Stop lever angle

Test data 106671-6340
N:Pump normal S:Stop the pump. (1)Use the pin at R = aa (2)Set the stopper bolt so that speed = bb and rack position = cc. (Confirm non-injection.)
----------
aa=40mm bb=0r/min cc=1.5+-0.3mm
----------
a=22deg+-5deg b=41deg+-5deg

Timing setting

Test data 106671-6340
(1)Pump vertical direction (2)Position of timer's threaded hole at the No. 1 cylinder's beginning of injection (3)B.T.D.C.: aa (4)Secondary timing stamping position for the No. 1 cylinder's beginning of injection (5)Pump vertical direction (6)Direction of rotation (7)Pointer (8)Pointer stamping (9)Timing device stamping (10)Timing device (11)Stamp both at the same time as shown above. (12)Outside circumference of timing device
----------
aa=10deg bb=1deg
----------
a=(50deg)




Information:

Introduction
***#i00660713/i00660713*** contains the abbreviations, symbols, wiring sizes, wiring color and number codes for the ETR/ETS electric protection system which are placed on drawings and wiring, and referenced in the text of this Service Manual.The electrical system for the engine contains five subsystems. Each subsystem has different symbols and wire number codes. Abbreviations, symbols, numbering and lettering codes, and wiring requirements are described for the following subsystems.
Starting
Charging
Control
Monitoring
ProtectionThe engine electrical system is designed to improve operational reliability, reduce maintenance problems, improve the flexibility for making changes or additions to the system, and comply with international standards. In order to accomplish these goals, the engine electrical system contains the following components.
A steel junction box for the control, monitoring, and protection subsystems with standardized mounting locations on each engine series.
A steel power distribution box for the high amperage starting and charging subsystems with standardized mounting locations on each engine series.
A wiring harness in a protective nylon conduit that connects the junction box, power distribution box, and the electrical components located on the engine.
Common heat stamped wire number codes on each wire in the wiring harness for all engine models.
Common logic for all subsystems on all engine models."Description of Electrical System Symbols And Codes" explains how to use and understand the graphical representation of the ETR/ETS electric protection system by component and wiring abbreviations, symbols, and codes.Description of Electrical System Symbols And Codes
The Point-To-Point graphical system is used in all the wiring diagrams and schematics which help describe the systems operation and troubleshooting of the ETR/ETS electric protection system.Each wire in the wiring harness is heat stamped the length of the wire with the wire number code as shown in the ETR/ETS Wiring Using Wire Number Codes diagram on Illustration 7. The first number pair of the wiring code identifies the terminal on an engine component to which one end of the wire should be attached. The second number pair of the wiring code identifies the terminal on the component to which the other end of the wire should be attached. The number assigned to each terminal of each component will be the same for all engine models.The two numbers in the wiring code differentiate between left and right hand mounting. Illustration 2 contains the Number Codes and an example of usage.The symbols for the engine components will be the same for all 3200-3500 Series Engines.The use of abbreviations, symbols, and codes is provided by the following example. In order to locate and identify the wire which connects the starting motor magnetic switch and the starting motor, first determine the correct drawing abbreviation. The Abbreviation List on Illustration 1 shows ("SMMS") as the abbreviation symbol for the starting motor magnetic switch. ("SM") is shown as the abbreviation symbol for the starting motor. The symbols for both the starting motor magnetic switch and the starting motor are listed under the Starting System on 3.Locate the ("SMMS") and ("SM") symbols on the Starting System list on Illustration 3. Because an engine option exists for two

Have questions with 106671-6340?





Group cross 106671-6340 ZEXEL

Isuzu 

 
1156031640 
INJECTION-PUMP ASSEMBLY
6SD1-T
 
 
INJECTION-PUMP ASSEMBLY

Isuzu 

9 400 613 207 
1156031641 
INJECTION-PUMP ASSEMBLY
6SD1-T
 
 
INJECTION-PUMP ASSEMBLY

Isuzu 

9 400 616 902 
1156032500 
INJECTION-PUMP ASSEMBLY
6SD1-T
F 019 Z10 001 
1156032570 
INJECTION-PUMP ASSEMBLY
6SD1-TC
F 019 Z10 002 
1156032571 
INJECTION-PUMP ASSEMBLY
6SD1-TC
F 019 Z10 003 
1156032572 
INJECTION-PUMP ASSEMBLY
6SD1-TC
9 400 616 903 
1156032573 
INJECTION-PUMP ASSEMBLY
6SD1-TC
 
1156032550 
INJECTION-PUMP ASSEMBLY
6SD1-TC
 
1156032551 
INJECTION-PUMP ASSEMBLY
6SD1-TC
9 400 616 904 
1156032552 
INJECTION-PUMP ASSEMBLY
6SD1-TC
106671-6340  

106671-6341 
9 400 619 996 
1156032580 
INJECTION-PUMP ASSEMBLY
6SD1-TC
 
1156032581 
INJECTION-PUMP ASSEMBLY
6SD1-TC
 
1156032582 
INJECTION-PUMP ASSEMBLY
6SD1-TC
9 400 616 905 
1156032583 
INJECTION-PUMP ASSEMBLY
6SD1-TC
 
1156032560 
INJECTION-PUMP ASSEMBLY
6SD1-TC
 
1156032561 
INJECTION-PUMP ASSEMBLY
6SD1-TC
9 400 616 906 
1156032562 
INJECTION-PUMP ASSEMBLY
6SD1-TC
 
1156032460 
INJECTION-PUMP ASSEMBLY
6SD1-TC
9 400 619 999 
1156032461 
INJECTION-PUMP ASSEMBLY
6SD1-TC
F 019 Z10 008 
1156032462 
INJECTION-PUMP ASSEMBLY
6SD1-TC
9 400 611 530 
1156032463 
INJECTION-PUMP ASSEMBLY
6SD1-TC
 
1156032660 
INJECTION-PUMP ASSEMBLY
6WA1-TCN
F 019 Z10 736 
1156032661 
INJECTION-PUMP ASSEMBLY
6WA1-TCN
9 400 616 907 
1156032662 
INJECTION-PUMP ASSEMBLY
6WA1-TCN
 
1156032700 
INJECTION-PUMP ASSEMBLY
6RB1-T
 
 
INJECTION-PUMP ASSEMBLY

Isuzu 

9 400 612 039 
1156032740 
INJECTION-PUMP ASSEMBLY
6SD1-T
Back to top