106671-5452 ZEXEL 9 400 611 664 BOSCH INJECTION-PUMP ASSEMBLY 9400611664 1066715452


 

Information injection-pump assembly

BOSCH 9 400 611 664 9400611664
ZEXEL 106671-5452 1066715452
106671-5452 INJECTION-PUMP ASSEMBLY
Rating:
22
Buy INJECTION-PUMP ASSEMBLY 106671-5452 zexel genuine, new aftermarket engine parts with delivery

Service parts 106671-5452 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106067-0800
3. GOVERNOR 105407-5851
4. SUPPLY PUMP 105217-6010
5. AUTOM. ADVANCE MECHANIS 105681-1750
6. COUPLING PLATE 105662-1200
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105100-7130
11. Nozzle and Holder 16600-96514
12. Open Pre:MPa(Kqf/cm2) 17.7{180}/22.6{230}
13. NOZZLE-HOLDER 105031-4630
14. NOZZLE 105015-6340
15. NOZZLE SET

Include in #1:

106671-5452 as INJECTION-PUMP ASSEMBLY

Cross reference number

Zexel num
Bosch num
Firm num
Name
106671-5452 
106671-5453 
9 400 611 664 
   
INJECTION-PUMP ASSEMBLY
* K 14CA PE6P,6PD PE




Information:


Marks For Tightening Connecting Rod Bolts-7E5996 Connecting Rod Assembly(1) Bore in connecting rod for piston pin bearing ... 55.436 0.013 mm (2.1825 .0005 in) The connecting rod must be heated for installation of piston pin bearing. Do not use a torch.(2) Distance rod may be heated to 175 to 260°C (347 to 500°F) to install the piston pin bearing ... 85.0 mm (3.35 in)(3) Bore in bearing for piston pin (new) ... 50.830 0.008 mm (2.0012 .0003 in) Diameter of piston pin (new) ... 50.795 0.005 mm (1.9998 .0002 in)Thoroughly lubricate piston pin with clean engine oil prior to inserting into piston group and rod assembly.Maximum permissible clearance between bearing and piston pin (worn) ... 0.25 mm (.010 in)(4) Bearing joint must be assembled at either location on centerline through the connecting rod bore ... 5°Make reference to Special Instruction, Form No. SMHS7295 for use of pin bearing removal and installation tools and procedures.(5) Distance between center of bearings ... 261.62 0.05 mm (10.300 .002 in)(6) Bore in connecting rod for bearing with nuts tightened to specifications (8) ... 96.200 0.013 mm (3.7874 .0005 in)(7) Location for etching cylinder number on connecting rod and cap. Rods and caps are to be marked with numbers 1 through 6 on the same side of the rod as the bearing tab slots.(8) Tighten connecting rod bolts as follows: a. Before installing bolts, lubricate bolt threads and seating faces of the caps with 2P2506 Thread Lubricant.b. Tighten each bolt to ... 90 8 N m (66 6 lb ft)c. Put an alignment mark on each cap and bolt.d. Tighten each bolt an additional ... 90 5° (1/4 turn)(9) Bore in bearing for crankshaft rod journal ... 90.112 0.028 mm (3.5477 .0011 in) Clearance between bearing and crankshaft (new) ... 0.062 to 0.160 mm (.0024 to .0063 in)Maximum permissible clearance between bearing and crankshaft (worn) ... 0.20 mm (.008 in) Bearings are available in 0.63 mm (.025 in) and 1.27 mm (.050 in) smaller than original size.

Have questions with 106671-5452?





Group cross 106671-5452 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 610 854 
1680196661 
INJECTION-PUMP ASSEMBLY
D516X
9 400 610 855 
1679096569 
INJECTION-PUMP ASSEMBLY
PF6TA
9 400 610 856 
1680196662 
INJECTION-PUMP ASSEMBLY
D516XH
 
1679096570 
INJECTION-PUMP ASSEMBLY
PF6TA
F 019 Z10 009 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 610 857 
1679096571 
INJECTION-PUMP ASSEMBLY
PE6T
F 019 Z10 121 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY
106671-5452  

106671-5453 
9 400 611 664 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 616 860 
1679096572 
INJECTION-PUMP ASSEMBLY
PE6T
 
1679096573 
INJECTION-PUMP ASSEMBLY
PE6T
9 400 616 861 
1679096602 
INJECTION-PUMP ASSEMBLY
PE6T
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

 
1679096574 
INJECTION-PUMP ASSEMBLY
PE6T
9 400 610 858 
1679096603 
INJECTION-PUMP ASSEMBLY
PE6T
9 400 610 859 
1671396963 
INJECTION-PUMP ASSEMBLY
PF6TA
F 019 Z10 122 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 610 860 
1671396964 
INJECTION-PUMP ASSEMBLY
PF6TB
Back to top