106671-5261 ZEXEL INJECTION-PUMP ASSEMBLY Calibration Data 1066715261


 

Information injection-pump assembly

ZEXEL 106671-5261 1066715261
106671-5261 INJECTION-PUMP ASSEMBLY
Rating:
9
Buy INJECTION-PUMP ASSEMBLY 106671-5261 zexel genuine, new aftermarket engine parts with delivery

Service parts 106671-5261 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106061-7690
3. GOVERNOR 105407-5330
4. SUPPLY PUMP 105237-4210
5. AUTOM. ADVANCE MECHANIS 105681-1190
6. COUPLING PLATE 105663-0650
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105101-6360
11. Nozzle and Holder 16600-96575
12. Open Pre:MPa(Kqf/cm2) 22.6{230}
13. NOZZLE-HOLDER 105031-4370
14. NOZZLE 105015-8770
15. NOZZLE SET

Include in #1:

106671-5261 as INJECTION-PUMP ASSEMBLY

Cross reference number

ZEXEL 106671-5261 1066715261


Zexel num
Bosch num
Firm num
Name
106671-5261 
 
   
INJECTION-PUMP ASSEMBLY

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   134424-0020
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-4-2-6- 3-5
Pre-stroke mm   3.9 3.85 3.95
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-4
deg.   60 59.5 60.5
Difference between angles 2
Cyl.1-2
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cal 1-3
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-5
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   11.8
Pump speed r/min   700 700 700
Average injection quantity mm3/st.   180 178 182
Max. variation between cylinders %   0 -4 4
Basic   *
Fixing the lever   *
Boost pressure kPa   78.6 78.6
Boost pressure mmHg   590 590
Injection quantity adjustment_02
Adjusting point   C
Rack position   10.25+-0 .5
Pump speed r/min   400 400 400
Average injection quantity mm3/st.   140.5 137.5 143.5
Fixing the lever   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
Injection quantity adjustment_03
Adjusting point   D
Rack position   7+-0.5
Pump speed r/min   375 375 375
Average injection quantity mm3/st.   21 20 22
Max. variation between cylinders %   0 -10 10
Fixing the rack   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
Boost compensator adjustment
Pump speed r/min   400 400 400
Rack position   (10.25)
Boost pressure kPa   16 9.3 22.7
Boost pressure mmHg   120 70 170
Boost compensator adjustment_02
Pump speed r/min   400 400 400
Rack position   11.8
Boost pressure kPa   69.3 66.6 72
Boost pressure mmHg   520 500 540
Timer adjustment
Pump speed r/min   -
Advance angle deg.   0 0 0
Remarks
Measure speed (beginning of operation).
 
Timer adjustment_02
Pump speed r/min   -
Advance angle deg.   1 0.5 1.5
Remarks
Measure the actual speed, stop
 

Test data Ex:

Governor adjustment

Test data 106671-5261
N:Pump speed R:Rack position (mm) (1)Target notch: K (2)Tolerance for racks not indicated: +-0.05mm. (3)Boost compensator excessive fuel lever at operation: L1 (at 0 boost pressure) (4)Set idle sub-spring (5)Main spring setting
----------
K=10 L1=13.6+-0.1mm
----------

Speed control lever angle

Test data 106671-5261
F:Full speed I:Idle (1)Stopper bolt setting
----------

----------
a=2deg+-5deg b=20deg+-5deg

Stop lever angle

Test data 106671-5261
N:Pump normal S:Stop the pump.
----------

----------
a=26deg+-5deg b=53deg+-5deg

0000001101

Test data 106671-5261
N:Normal B:When boosted (1)Rack position = aa at boost pressure 0.
----------
aa=13.6+-0.1mm
----------
a=(18deg) b=(18deg)

Timing setting

Test data 106671-5261
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(20deg)




Information:

Start By:a. remove valve covers 1. Remove bolts (1) that hold the valve cover bases to the cylinder head assembly. Remove valve cover bases (2). 2. Use tool (A) to loosen fuel injection line (3) from fuel injection nozzle (4). 3. Use tool (B) to loosen the nut at the fuel injection line adapter end. Remove inner fuel injection lines (3). Install caps and plugs on all fuel injection line openings to keep dirt out of the fuel system. 4. Remove bolts (5) that hold the rocker shaft assemblies to the cylinder head assembly.5. Remove rocker shaft assemblies (6). 6. Put identification marks on the push rods as to their location in the engine. Remove push rods (7). 7. Put identification marks on the bridges as to their location in the engine. Remove bridges (8) from the dowels on the cylinder head assembly.Install Rocker Shaft Assemblies And Push Rods
1. Put clean engine oil on the bridges and dowels. Install the original bridges in their respective locations. New bridges can be mixed.2. Install bridges (8) on the bridge dowels. While firmly pressing 0.5 to 4.5 kg (1 to 10 lb.) straight down on the top contact surface of the bridge, turn the adjusting screw clockwise until contact is made with the valve stem. Turn the screw an additional 20° to 30° (1/3 to 1/2 of 1 hex on nut). This will straighten the dowel in the guide and compensate for the slack in the threads. Hold the adjusting screw in this position, and tighten the locknut to a torque of 30 4 N m (22 3 lb.ft.). Install original push rods in their respective locations in the engine. New push rods can be mixed.3. Install push rods (7). 4. Put rocker shaft assemblies (6) in position on the cylinder head assembly.5. Put clean engine oil on the threads of bolts (5) that hold the shaft assemblies in place. Tighten the bolts first to a torque of 270 25 N m (200 18 lb.ft.). Start with the bolt in the center of the rocker shaft assembly. Tighten the bolts again to a torque of 450 20 N m (330 15 lb.ft.). Tighten the bolts again by hand to a torque of 450 20 N m (330 15 lb.ft.).
Do not cause damage to the O-ring seals on the inner fuel lines.
6. Install inner fuel injection lines (3). Tighten the fuel injection line adapter nuts (9) to a torque of 40 7 N m (30 5 lb.ft.) with tool (B).7. Tighten fuel injection line nut (10) to a torque of 40 7 N m (30 5 lb.ft.) with tool (A).8. Make adjustments to the valves until the intake valve clearance is 0.38 mm (.015 in.) and the exhaust valve clearance is 0.76 mm (.030 in.). See Valve Clearance Setting in Testing And Adjusting. Tighten the locknut to a torque of 30 4 N m (22 3 lb.ft.) and

Have questions with 106671-5261?





Group cross 106671-5261 ZEXEL

Nissan-Diesel 

 
1679096562 
INJECTION-PUMP ASSEMBLY
PF6TA
F 019 Z10 406 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 616 852 
1680096665 
INJECTION-PUMP ASSEMBLY
PF6T
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 613 298 
1671396909 
INJECTION-PUMP ASSEMBLY
PE6T
9 400 619 861 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 616 853 
1679096017 
INJECTION-PUMP ASSEMBLY
PF6TA
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 610 850 
1671396913 
INJECTION-PUMP ASSEMBLY
PF6TA
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 610 851 
1671396914 
INJECTION-PUMP ASSEMBLY
PF6TB
9 400 619 692 
 
INJECTION-PUMP ASSEMBLY
106671-5261  
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 616 854 
1679096564 
INJECTION-PUMP ASSEMBLY
PF6TA
 
1680095500 
INJECTION-PUMP ASSEMBLY
D1X
 
1680096666 
INJECTION-PUMP ASSEMBLY
D0XA
9 400 616 855 
1680196614 
INJECTION-PUMP ASSEMBLY
D516X
Back to top