106671-5251 ZEXEL 9 400 610 851 BOSCH INJECTION-PUMP ASSEMBLY 9400610851 1066715251 1671396914


 

Information injection-pump assembly

BOSCH 9 400 610 851 9400610851
ZEXEL 106671-5251 1066715251
NISSAN-DIESEL 1671396914 1671396914
106671-5251 INJECTION-PUMP ASSEMBLY
Rating:
8
Buy INJECTION-PUMP ASSEMBLY 106671-5251 zexel genuine, new aftermarket engine parts with delivery

Service parts 106671-5251 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106061-7241
3. GOVERNOR 105489-4271
4. SUPPLY PUMP 105237-4210
5. AUTOM. ADVANCE MECHANIS 105681-1270
6. COUPLING PLATE 105663-0640
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105101-6930
11. Nozzle and Holder 16600-96603
12. Open Pre:MPa(Kqf/cm2) 22.6{230}
13. NOZZLE-HOLDER 105030-4540
14. NOZZLE 105015-9510
15. NOZZLE SET

Include in #1:

106671-5251 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH 9 400 610 851 9400610851
ZEXEL 106671-5251 1066715251
NISSAN-DIESEL 1671396914 1671396914


Zexel num
Bosch num
Firm num
Name
106671-5251 
106671-5940 
9 400 610 851 
1671396914  NISSAN-DIESEL
INJECTION-PUMP ASSEMBLY
PF6TB * K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   132424-0620
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-4-2-6- 3-5
Pre-stroke mm   3.9 3.85 3.95
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-4
deg.   60 59.5 60.5
Difference between angles 2
Cyl.1-2
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cal 1-3
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-5
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   12.5
Pump speed r/min   1050 1050 1050
Average injection quantity mm3/st.   199 197 201
Max. variation between cylinders %   0 -4 4
Basic   *
Fixing the lever   *
Boost pressure kPa   80 80
Boost pressure mmHg   600 600
Injection quantity adjustment_02
Adjusting point   C
Rack position   6.4+-0.5
Pump speed r/min   260 260 260
Average injection quantity mm3/st.   13.5 12.2 14.8
Max. variation between cylinders %   0 -10 10
Fixing the rack   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
Injection quantity adjustment_03
Adjusting point   D
Rack position   8.8
Pump speed r/min   400 400 400
Average injection quantity mm3/st.   91.5 85.5 97.5
Fixing the lever   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
Boost compensator adjustment
Pump speed r/min   400 400 400
Rack position   8.8
Boost pressure kPa   13.3 12 14.6
Boost pressure mmHg   100 90 110
Boost compensator adjustment_02
Pump speed r/min   400 400 400
Rack position   11.75
Boost pressure kPa   50.7 44 57.4
Boost pressure mmHg   380 330 430
Boost compensator adjustment_03
Pump speed r/min   400 400 400
Rack position   12.7+0.2
Boost pressure kPa   66.7 66.7 66.7
Boost pressure mmHg   500 500 500
Timer adjustment
Pump speed r/min   750--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   700
Advance angle deg.   0.5
Timer adjustment_03
Pump speed r/min   1050
Advance angle deg.   1 0.5 1.5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 106671-5251
N:Pump speed R:Rack position (mm) (1)Tolerance for racks not indicated: +-0.05mm. (2)Rack limit using the stop lever: R1 (3)Boost compensator stroke: BCL (4)Damper spring setting (5)Variable speed specification: idling adjustment (6)Fix the lever at the full-load position at delivery. (7)Main spring setting (8)Perform governor adjustment at an ambient temperature of at least 15 deg C (boost compensator start spring is shape memory alloy).
----------
R1=12.7+0.2mm BCL=(4)mm
----------

Speed control lever angle

Test data 106671-5251
F:Full speed I:Idle (1)Pump speed = aa (2)Set the stopper bolt (fixed at full-load position at delivery.)
----------
aa=290r/min
----------
a=16deg+-5deg b=5deg+-5deg

0000000901

Test data 106671-5251
F:Full load I:Idle (1)Stopper bolt setting (2)Use the hole at R = aa
----------
aa=42mm
----------
a=32deg+-3deg b=45deg+-5deg

Stop lever angle

Test data 106671-5251
N:Pump normal S:Stop the pump. (1)Rack position = aa
----------
aa=12.7+0.2mm
----------
a=41.5deg+-5deg b=40deg+-5deg

Timing setting

Test data 106671-5251
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(20deg)




Information:

Start By:a. remove timing gear coverb. remove fuel injection pump housing and rack actuator package 1. Remove four bolts (2), plate (3) and idler gear (1). 2. If the camshaft is not going to be removed, use tooling (A) to remove camshaft gear (4).
Do not turn the crankshaft with the camshaft gear removed. Damage can be caused to the pistons and valves, or both.
3. Remove bolts (5) that hold timing gear plate (6) to the cylinder block.4. Remove timing gear plate (6). 5. Use tooling (B) to remove the bearing from the idler gear. The following steps are for the installation of the timing gears and plate.6. Install a new gasket on the timing gear plate.7. Put timing gear plate (6) in position on the cylinder block, and install the bolts that hold the timing gear plate to the cylinder block.8. Heat camshaft gear (4) to a maximum temperature of 315° C (600° F), and install it on the camshaft.9. Use tooling (B), and install the bearing in the idler gear. Set the gear on the front face, (face with timing marks). Drive the bearing from the rear face toward the front face of the gear. Install the bearing to a depth of 1.5 0.5 mm (.06 .02 in.) below the rear face of the idler gear.10. Install the idler gear, plate and bolts. Be sure No. 1 cylinder is at top center on the compression stroke. Install the idler gear so "V" mark (7) on the idler gear is in alignment with the "V" mark on the crankshaft gear. "K" marks (8) of the camshaft gear can be seen at the outer edges of the idler gear.End By:a. install fuel injection pump housing and rack actuator packageb. install timing gear cover

Have questions with 106671-5251?





Group cross 106671-5251 ZEXEL

Nissan-Diesel 

 
1679096562 
INJECTION-PUMP ASSEMBLY
PF6TA
F 019 Z10 406 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 616 852 
1680096665 
INJECTION-PUMP ASSEMBLY
PF6T
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 613 298 
1671396909 
INJECTION-PUMP ASSEMBLY
PE6T
9 400 619 861 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 616 853 
1679096017 
INJECTION-PUMP ASSEMBLY
PF6TA
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 610 850 
1671396913 
INJECTION-PUMP ASSEMBLY
PF6TA
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

106671-5251  

106671-5940 
9 400 610 851 
1671396914 
INJECTION-PUMP ASSEMBLY
PF6TB
9 400 619 692 
 
INJECTION-PUMP ASSEMBLY
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 616 854 
1679096564 
INJECTION-PUMP ASSEMBLY
PF6TA
 
1680095500 
INJECTION-PUMP ASSEMBLY
D1X
 
1680096666 
INJECTION-PUMP ASSEMBLY
D0XA
9 400 616 855 
1680196614 
INJECTION-PUMP ASSEMBLY
D516X