106671-5160 ZEXEL F 019 Z10 405 BOSCH INJECTION-PUMP ASSEMBLY f019z10405 1066715160


 

Information injection-pump assembly

BOSCH F 019 Z10 405 f019z10405
ZEXEL 106671-5160 1066715160
106671-5160 INJECTION-PUMP ASSEMBLY
Rating:
69
Buy INJECTION-PUMP ASSEMBLY 106671-5160 zexel genuine, new aftermarket engine parts with delivery

Service parts 106671-5160 INJECTION-PUMP ASSEMBLY:

1. _
2. FUEL INJECTION PUMP 106061-7100
3. GOVERNOR 105487-5910
4. SUPPLY PUMP 105217-1850
5. AUTOM. ADVANCE MECHANIS 105636-2110
6. COUPLING PLATE 105663-0640
7. COUPLING PLATE
8. _
9. _
10. NOZZLE AND HOLDER ASSY 105101-6400
11. Nozzle and Holder 1660096577
12. Open Pre:MPa(Kqf/cm2) 22.6(230)
13. NOZZLE-HOLDER 105031-4370
14. NOZZLE 105015-8860
15. NOZZLE SET

Include in #1:

106671-5160 as INJECTION-PUMP ASSEMBLY

Cross reference number

BOSCH F 019 Z10 405 f019z10405
ZEXEL 106671-5160 1066715160


Zexel num
Bosch num
Firm num
Name
106671-5160 
106671-5161 
F 019 Z10 405 
   
INJECTION-PUMP ASSEMBLY
* K

Calibration Data:

Adjustment conditions
Test oil
1404 Test oil
  ISO4113 or {SAEJ967d}
Test oil temperature degC   40 40 45
Nozzle and nozzle holder   105780-8140
Bosch type code   EF8511/9A
Nozzle   105780-0000
Bosch type code   DN12SD12T
Nozzle holder   105780-2080
Bosch type code   EF8511/9
Opening pressure MPa   17.2
Opening pressure kgf/cm2   175
Injection pipe
Outer diameter - inner diameter - length (mm)
mm   8-3-600
Overflow valve   132424-0620
Overflow valve opening pressure kPa   157 123 191
Overflow valve opening pressure kgf/cm2   1.6 1.25 1.95
Tester oil delivery pressure kPa   157 157 157
Tester oil delivery pressure kgf/cm2   1.6 1.6 1.6
Direction of rotation (viewed from drive side)
Right
  R
Injection timing adjustment
Direction of rotation (viewed from drive side)
Right
  R
Injection order   1-4-2-6- 3-5
Pre-stroke mm   3.65 3.6 3.7
Beginning of injection position
Drive side
  NO.1
Difference between angles 1
Cal 1-4
deg.   60 59.5 60.5
Difference between angles 2
Cyl.1-2
deg.   120 119.5 120.5
Difference between angles 3
Cal 1-6
deg.   180 179.5 180.5
Difference between angles 4
Cal 1-3
deg.   240 239.5 240.5
Difference between angles 5
Cal 1-5
deg.   300 299.5 300.5
Injection quantity adjustment
Adjusting point   A
Rack position   11.9
Pump speed r/min   600 600 600
Average injection quantity mm3/st.   166.4 164.4 168.4
Max. variation between cylinders %   0 -4 4
Basic   *
Fixing the lever   *
Boost pressure kPa   30.7 30.7
Boost pressure mmHg   230 230
Remarks
Rack limit using stop lever.
 
Injection quantity adjustment_02
Adjusting point   C
Rack position   7.2+-0.5
Pump speed r/min   250 250 250
Average injection quantity mm3/st.   16.7 15.7 17.7
Max. variation between cylinders %   0 -10 10
Fixing the rack   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
Injection quantity adjustment_03
Adjusting point   D
Rack position   9.8
Pump speed r/min   300 300 300
Average injection quantity mm3/st.   101.6 98.6 104.6
Fixing the lever   *
Boost pressure kPa   0 0 0
Boost pressure mmHg   0 0 0
Boost compensator adjustment
Pump speed r/min   300 300 300
Rack position   9.8
Boost pressure kPa   4 4
Boost pressure mmHg   30 30
Boost compensator adjustment_02
Pump speed r/min   300 300 300
Rack position   11.5
Boost pressure kPa   16 14.7 17.3
Boost pressure mmHg   120 110 130
Boost compensator adjustment_03
Pump speed r/min   300 300 300
Rack position   11.9
Boost pressure kPa   17.3 17.3 17.3
Boost pressure mmHg   130 130 130
Timer adjustment
Pump speed r/min   750--
Advance angle deg.   0 0 0
Remarks
Start
 
Timer adjustment_02
Pump speed r/min   700
Advance angle deg.   0.5
Timer adjustment_03
Pump speed r/min   1050
Advance angle deg.   1 0.5 1.5
Remarks
Finish
 

Test data Ex:

Governor adjustment

Test data 106671-5160
N:Pump speed R:Rack position (mm) (1)Lever ratio: RT (2)Target shim dimension: TH (3)Tolerance for racks not indicated: +-0.05mm. (4)Rack limit using stop lever (5)Damper spring setting (6)Variable speed specification: idling adjustment (7)Fix the lever at the full-load position at delivery. (8)Main spring setting (9)Perform governor adjustment at an ambient temperature of at least 15 deg C (boost compensator start spring is shape memory alloy).
----------
RT=1 TH=2.4mm
----------

Speed control lever angle

Test data 106671-5160
F:Full speed I:Idle (1)Pump speed = aa (2)Set the stopper bolt (fixed at full-load position at delivery.)
----------
aa=290r/min
----------
a=21deg+-5deg b=12deg+-5deg

0000000901

Test data 106671-5160
F:Full load I:Idle (1)Stopper bolt setting (2)Use the hole at R = aa
----------
aa=42mm
----------
a=35deg+-3deg b=45deg+-5deg

Stop lever angle

Test data 106671-5160
N:Pump normal S:Stop the pump. (1)Rack position = aa
----------
aa=11.9mm
----------
a=35deg+-5deg b=35deg+-5deg

0000001501 ACS

Test data 106671-5160
(A) Set screw 1. Aneroid compensator unit adjustment Screw in (A) to obtain L1. 2. Adjustment following governor installation (1)Set the speed of the pump to N1 r/min and fix the control lever at the full set position. (2)Screw in the aneroid compensator to obtain the performance shown in the graph above.
----------
N1=1050r/min L1=(0.1~0.5)mm
----------
R1=11.9mm R2=(9.8)mm P1=86.6+-2.7 kPa(650+-20mmHg) P2=57.9+-0.7 kPa(434+-5mmHg) Q1=(165.4)+-2cm3/1000st Q2=117.1+-2cm3/1000st

Timing setting

Test data 106671-5160
(1)Pump vertical direction (2)Coupling's key groove position at No 1 cylinder's beginning of injection (3)- (4)-
----------

----------
a=(30deg)




Information:

Battery
Never disconnect any charging unit circuit or battery circuit cable from battery when the charging unit is operated. A spark can cause an explosion from the flammable vapor mixture of hydrogen and oxygen that is released from the electrolyte through the battery outlets. Injury to personnel can be the result.
The battery circuit is an electrical load on the charging unit. The load is variable because of the condition of the charge in the battery. Damage to the charging unit can result if the connections (either positive or negative) between the battery and charging unit are broken while the charging unit is in operation. This is because the battery load is lost and there is an increase in charging voltage. High voltage can damage, not only the charging unit, but also the regulator and other electrical components.Use the 6V4930 Battery Load Tester, the 8T0900 Clamp-On Ammeter and the 6V7070 Multimeter to load test a battery that does not hold a charge when in use. See Special Instruction, Form No. SEHS8268 for the correct procedure and specifications to use.Charging System
The condition of charge in the battery at each regular inspection will show if the charging system operates correctly. An adjustment is necessary when the battery is constantly in a low condition of charge or a large amount of water is needed (more than one ounce of water per cell per week or per every 100 service hours).When it is possible, make a test of the charging unit and voltage regulator on the engine, and use wiring and components that are a permanent part of the system. Off-engine (bench) testing will give a test of the charging unit and voltage regulator operation. This testing will give an indication of needed repair. After repairs are made, again make a test to give proof that the units are repaired to their original condition of operation.Before the start of on-engine testing, the charging system and battery must be checked as shown in the Steps that follow:1. Battery must be at least 75% (1.225 Sp.Gr.) fully charged and held tightly in place. The Battery holder must not put too much stress on the battery.2. Cables between the battery, starter and engine ground must be the correct size. Wires and cables must be free of corrosion and have cable support clamps to prevent stress on battery connections (terminals).3. Leads, junctions, switches, and panel instruments that have direct relation to the charging circuit must give correct circuit control.4. Inspect the drive components for the charging unit to be sure they are free of grease and oil and have the ability to operate the charging unit.Alternator Regulator Adjustment (Delco-Remy)
When an alternator is charging the battery too much or not enough, the charging rate of the alternator should be checked. Make reference to the Specifications module to find all testing specifications for the alternators and regulators.
5N5692 Alternator
(1) Ground terminal. (2) Pulley nut.No adjustment can be made to change the rate of charge on the alternator regulators. If rate of

Have questions with 106671-5160?





Group cross 106671-5160 ZEXEL

 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 616 847 
1671396878 
INJECTION-PUMP ASSEMBLY
PF6TA
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 616 848 
1671396879 
INJECTION-PUMP ASSEMBLY
PF6TB
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

F 019 Z20 489 
1679095503 
INJECTION-PUMP ASSEMBLY
NF6T04
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 610 847 
1680096662 
INJECTION-PUMP ASSEMBLY
PF6TB
F 019 Z10 404 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 610 848 
1680096663 
INJECTION-PUMP ASSEMBLY
PF6TB
 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 611 759 
1671396903 
INJECTION-PUMP ASSEMBLY
PF6TA
106671-5160  

106671-5161 
F 019 Z10 405 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 616 849 
1671396905 
INJECTION-PUMP ASSEMBLY
PF6T
F 019 Z10 529 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 610 849 
1680096664 
INJECTION-PUMP ASSEMBLY
PF6T
9 400 619 860 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 616 850 
1671396907 
INJECTION-PUMP ASSEMBLY
PF6T
F 019 Z10 530 
 
INJECTION-PUMP ASSEMBLY

Nissan-Diesel 

9 400 616 851 
1671396908 
INJECTION-PUMP ASSEMBLY
PF6TB
Back to top